"WELDGRP.

xls" Program
Version 2.1

WELD GROUP ANALYSIS


Using the Elastic Method for up to 24 Total Welds

Job Name: Subject:


Job Number: Originator: Checker:

Input Data: Weld Spec: E70XX

Number of Welds, Nw = 2 120.0


Weld Coordinates:
Start End
100.0
X1 (mm.) Y1 (mm.) X2 (mm.) Y2 (mm.)
Weld #1
Weld #2 80.0

Y - AXIS (mm.)
60.0

40.0

20.0

0.0
0.0 20.0 40.0 60.0 80.0 100.0 120.0
X - AXIS (mm.)

WELD GROUP PLOT

+Y 1=Start
2=End
1 2
2
Weld #3
Weld #2
No. of Load Points = 1 Weld #1
Load Point Data: 1
Point #1 1 2
X-Coordmmate (mm.) = 0 +X
Y-Coordmmate (mm.) = Origin
Z-Coordmmate (mm.) = +Z
Axial Load, Pz (N) = NOMENCLATURE
Shear Load, Px (N) =
Shear Load, Py (N) =
Moment, Mx (N-mm) =
Moment, My (N-mm) =
Moment, Mz (N-mm) =
(continued)

1 of 2 7/30/2018 2:52 PM