You are on page 1of 4

Konsultan REPUBLIK INDONESIA

DEPARTEMEN PEKERJAAN UMUM


DIREKTORAT JENDERAL BINA MARGA

Tanggal Test :
Kontraktor SUMMARY AGGREGATE Jns Pekerjaan :
PT. LUBUK MINTURUN KONSTRUKSI PERSADA KLAS A / KLAS B / KLAS C Jns Material :
Lokasi :

Data Laboraturium Data Lapangan


STA PI MDD CBR MA
No. Uraian 2" 1,5 " 1" 3/8 " No. 4 No. 10 No. 40 No. 200 Ket
Lap Lab Kepadatan
Spec

Approved By, Checked By, Tested By,


Bina Marga Konsultan Kontraktor

Tgl Tgl Tgl


QP - 8.2 - 04 - L1 / 02 Rev. 01

Konsultan PEMERINTAH PROP. SUMATERA BARAT Peningkatan Jalan Kab. Padang Pariaman,
PT. Visi Tekniktama Unggul - PT. Amarsidi ( JO ) DINAS PRASARANA JALAN Kota Padang, Dan Kota Padang
Jln. Arau No. 86 Telp. ( 0751 ) 21108 Padang

Tanggal Test :
Kontraktor SUMMARY AGGREGATE Jns Pekerjaan : Timbunan
PT. Combina Costraco Agg. Base Klas - B Jns Material : Base Klas - B
Lokasi :

Data Laboraturium Data Lapangan


STA PI MDD CBR MA
No. Uraian 2" 1,5 " 1" 3/8 " No. 4 No. 10 No. 40 No. 200 Ket
Lap Lab Kepadatan
Spec 100 88 - 95 70 - 85 30 - 65 25 - 55 15 - 40 6 - 20 2-8 - Min. 60 %
1 100.00 91.16 76.58 49.99 39.2 24.11 15.55 3.97 - 2,058 71,02%
2 100.00 90.10 75.51 45.29 39.23 21.93 11.38 5.28 2,058 71,02%

Average 100.00 90.63 76.05 47.64 39.22 23.02 13.47 4.63 2,058 71,02%

Approved By, Checked By, Tested By,


Bina Marga Konsultan Kontraktor

Tgl Tgl Tgl

PEMERIKSAN PRODUK JADI


QP - 8.2 - 04 - L1 / 02 Rev. 01

PEMERIKSAN PRODUK JADI

You might also like