CMPAK UMTS 3G Rollout Project

Single Site Verification Report


Region: C4, Site ID: 41421

DT Date:
Engineer Name:
Reviewed By: Syed Mohib
Submission Date:
Single Site Verification Report
(Region: C4, Site ID: 41421)

Approved by vendor/Huawei/…
Name: Designation
Signature: Date:

Approved by CMPAK
Name: Designation
Signature: Date:
Note: After the submission of SSV’s in a particular wee
audit of 20% sites. If any discrepancy is found in any on
submit latest 7 days SSV reports which done by the per

Step Test Procedure for SSV


Site Physical Audit
Audit Description
Antenna Type Need rigger climb tower check
Number of Antennas on site check
Azimuth Use compass check antenna azimuth
E-Tilt
M-Tilt Need rigger climb tower check
Total Tilt
1 Site Type (GF/RT/OHWT)
Building Height
Structure Type(m)
(Tower/Monopole/Pole/WallMount
Structure )Height (m)
on site check
Final Antenna Height

3G antenna installation type

Site Function Test


Test Description
DT Route All three sectors to be properly covered
ARFCN Verification Computer connect connect UE check ARFCN
PSC Verfication Computer connect UE check PSC
LAC/RAC Verification Computer connect UE check LAC/RAC
According PSC check result decide Sector cross
Sector/Cable Swap
or not
CPICH_RSCP near to
near to site check
the site (dBm)
Idle Mode

CPICH_EcIo near to
near to site check
the site (dBm)

Cell Reselection
Verification (3G -> 2G) Use UE force function test
- Stationary Force Test

Cell Reselection
Verification (2G -> 3G) Use UE force function test
- Stationary Force Test
Computer connect UE stationary test.
Stationary Call Testing
M to M 5 times call test. each call hoding time is
- Voice Call Verification
30 seonds

Computer connect UE stationary test.


Stationary Call Testing
M to M 5 times call test. each call hoding time is
- VP Call Verification
2 30 seonds

Stationary Video Call


To be done for 10% of Sites in a Cluster: One
Connection Mode

Testing functionality
Sector per Site Testing Required
test

HSDPA Functioning or Connect FTP server,download file and check


not downloading speed when the carrier is empty
load. Choice a large file and do testing for not
less than 10 min, Average Throughput require
UMTS Downloading 5Mbps for HSDPA.Average Throughput require
Throughput (Mbps) DL- 9Mbps for single carrier HSPA+.Average
Stationary Test Throughput require 15Mbps for dual carrier
HSPA+
HSUPA Functioning or Connect FTP server,upload file and check
not uploading speed when the carrier is empty
UMTS Uploading load.Choice a large file and do testing for not less
Throughput (Mbps) UL- than 10 min, Average Throughput require
Stationary Test 1Mbps,Max Throughput require 2Mbps.
Softer Handover
Verification - Voice
CS Handover and

CS Long call
Coverage Test

Soft Handover
Verification - Voice

3G -> 2G Inter-RAT
Hard Handover One test point in per site.
Verification - Voice

Remarks (Further comments if required): Vendor to optimize and fine tune the inter RAT parameters.

Exclusions for KPI commitment


1.Field test shall only pass through areas covered by the planned sites and with enough coverage. Any problem that occurs due to
2.For Field Test, the following conditions shall follow vendor’s comments.
ü HO testing shall be performed on continuous coverage area.
ü Abnormal transmission delay shall be eliminated.
ü The test should be performed under the RF conditions agreed upon both.
3.Any KPI data of cells from both coverage edge and isolated islands shall be eliminated.
4. The KPIs definition, measurement counters, test route, test equipment and test methodology as well as test time for KPIs shall b
5.Network performance is affected from the settings of system parameters, so vendor shall get authorization from Operator’s nam
a particular week, CMPAK RAN team will do random
s found in any one of SSV thenVendor need re-
done by the person who did wrong testSubmit

Procedure for SSV


te Physical Audit
Logfile Name Example
65deg 18dBi 0Tilt
3
120
5
0
5
RT
Fill out Site Physical Audit Form 15
Pole
20

18

independent antenna/Separate 3G Antenna


on a dual mount/Dual Band Antenna (3G +
GSM/DCS)
te Function Test
Logfile Name Example log File Name

Logfile Name:
Logfile Name:
SitenameXX_SectornameXX_TestConte
U001_SectorA_IdleMode_0930am_swapnil
nt_TestTime_DTEngineer
_01.log
name_logfileCount.log
Logfile Name:
Logfile Name:
SitenameXX_SectornameXX_TestConte
U001_SectorA_ConnectionModeCS_0930a
nt_TestTime_DTEngineer
m_swapnil_01.log
name_logfileCount.log
Logfile Name:
Logfile Name:
SitenameXX_SectornameXX_TestConte
U001_SectorA_ConnectionModeVP_0930a
nt_TestTime_DTEngineer
m_swapnil_01.log
name_logfileCount.log
Logfile Name:
SitenameXX_SectornameXX_TestConte
nt_TestTime_DTEngineer
name_logfileCount.log

Logfile Name:
Logfile Name:
SitenameXX_SectornameXX_TestConte
U001_SectorA_ConnectionModeHSDPA_0
nt_TestTime_DTEngineer
930am_swapnil_01.log
name_logfileCount.log

Logfile Name:
Logfile Name:
SitenameXX_SectornameXX_TestConte
U001_SectorA_ConnectionModeHSUPA_0
nt_TestTime_DTEngineer
930am_swapnil_01.log
name_logfileCount.log

Logfile Name: Logfile Name:


SitenameXX_TestContent_TestTime_DT U001_CS_Handover_Coverage_0930am_s
Engineer name_logfileCount.log wapnil_01.log

er RAT parameters.

e. Any problem that occurs due to the other sites is excluded.

as well as test time for KPIs shall be negotiated and agreed upon both parties.
authorization from Operator’s name to optimize system parameters.
Site Physical Audit Form

Site ID 41421
LAT
Planned Coordinate
LONG

LAT
GPS Coordinate
LONG

Items Sector-1
Antenna Type AQU4518R9
Number of Antennas 1
Azimuth 70
E-Tilt 2
M-Tilt 0
Total Tilt 2
Site Type (GF/RT/OHWT) GF
Building Height (m) N/A

Structure Type Tower


(Tower/Monopole/Pole/WallMount)
Structure Height (m) 45

Final Antenna Height 45

3G antenna installation type quad band


al Audit Form

Site Name CHS41421H_Nurpura


29.80044
72.8611

29.80044
72.8611

Sector-2 Sector-3
AQU4518R9 AQU4518R9
1 1
220 310
2 2
0 0
2 2
GF GF
N/A N/A

Tower Tower

45 45

45 45

quad band quad band


Site ID: 41421 Site Name: CH
1st Car
Type No. Activity/Process
Sector-1
1 ARFCN Verification 10562
2 PSC Verfication 6
Idle Mode

3 LAC/RAC Verification 40201/22


4 Sector/Cable Swap No
5 Cell Reselection Verification (3G -> 2G) - Stationary Force Test OK
6 Cell Reselection Verification (2G -> 3G) - Stationary Force Test OK
1 CPICH_RSCP near to the site (dBm) -61.6
2 CPICH_EcIo near to the site (dBm) -4.3
3 Stationary Call Testing - Voice Call Verification Yes
Connection Mode

4 Stationary Call Testing - VP Call Verification Yes


5 HSDPA Functioning or not Yes
Average Max
6 HSDPA Downloading Throughput (Mbps) - Stationary Test
20.01 26.07
7 HSUPA Functioning or not Yes
Average Max
8 HSUPA Uploading Throughput (Mbps) - Stationary Test
4.79 5.712
1 Softer Handover Verification - Voice OK
Dedicated Mode

2 Soft Handover Verification - Voice OK


3 3G -> 2G Inter-RAT Hard Handover Verification - Voice OK
4 3G -> 2G Inter-RAT Reselection Verification - PS (Any one cell of site) OK
5 2G -> 3G Inter-RAT Reselection Verification - PS (Any one cell of site)OK

Remarks (Further comments if required):

Remarks : for "3G<->2G inter-RAT Reselection Verification -PS" , only one cell for each site is required to perfo
Single Site Verification Checklist
CHS41421H_Nurpura Region: C_1
1st Carrier 2nd Carrier
Sector-1 Sector-2 Sector-3 Sector-1 Sector-2 Sector-3
10562 10562 10562 10587 10587 10562
6 7 8 6 7 8
0201/22 40201/22 40201/22 40201/22 40201/22 40201/22
No No No No No No
OK OK OK OK OK OK
OK OK OK OK OK OK
-61.6 -55.7 -59.7 -63.4 -66.7 -62.2
-4.3 -3.6 -3.9 -3.4 -3.9 -3.8
Yes Yes Yes Yes Yes Yes
Yes Yes Yes Yes Yes Yes
Yes Yes Yes Yes Yes Yes
Max Average Max Average Max Average Max Average Max Average Max
26.07 22.84 30.69 15.26 19.43 20.01 26.07 22.84 30.69 15.26 19.43
Yes Yes Yes Yes Yes Yes
Max Average Max Average Max Average Max Average Max Average Max
5.712 4.2 4.87 4.03 5.65 4.79 5.712 4.2 4.87 4.03 5.65

OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK

h site is required to performed this test.


3nd Carrier
Remarks
Sector-1 Sector-2 Sector-3
10712 10712 10562
6 7 8
40201/22 40201/22 40201/22
No No No
OK OK OK
OK OK OK
-57.4 -64.7 -60.22
-4.6 -3.7 -4.3
Yes Yes Yes
Yes Yes Yes
Yes Yes Yes
Average Max Average Max Average Max
Average Throughput>=5Mbps,Max Throughput>=7Mbps.
20.01 26.07 22.84 30.69 15.26 19.43
Yes Yes Yes
Average Max Average Max Average Max
Average Throughput>=1Mbps,Max Throughput>=2Mbps.
4.79 5.712 4.2 4.87 4.03 5.65

OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
ghput>=7Mbps.

ghput>=2Mbps.
UMTS Site Coverage

PSC Plo
Carrier-1 Carrier-2
RSCP
Carrier-1 Carrier-2
EcNo
Carrier-1 Carrier-2
TS Site Coverage Performance

PSC Plot
Carrier-2
RSCP
Carrier-2
EcNo
Carrier-2
UM

Carrier-1

Carrier-1
UMTS Site Coverage Performance/ OUTDOOR

RSCP
Carrier-2

Carrier-2
Carrier-2

Carrier-2
UMTS Site HSUPA Throughput

Sector-1
Carrier-1

Sector-2
Carrier-1
Sector-3
Carrier-1

HSUPA issue description


sector1
sector2
sector3
ughput
UMTS Site HSDPA Throughput

Sector-1
Carrier-1

Sector-2
Carrier-1
Sector-3
Carrier-1
HSDPA issue description
sector1
sector2
sector3
hput
395900776.xlsx 文档密级

Step Test Procedure fo

Test Description

UE locked to 3G,measure voice CSSR,DCR and


(1) The tests should be performed in the areas whe
RSCP ≥ -90 dBm.
DT Testing - Voice Call Verification (2) The failures caused by network congestion or po
should not be taken into consideration.
Connection Mode

(3) The failures caused by only Vendors RAN equip


1 consideration.

UE locked to 3G,measure voice CSSR.


(1) The tests should be performed in the areas whe
RSCP ≥ -90 dBm.
DT Testing - R99 PS Verification (2) The failures caused by network congestion or po
should not be taken into consideration.
(3) The failures caused by only Vendor RAN equipm
consideration.

DT KPI Min Calls Threshold Definition

(1) Originating Call Completion Rate = Number of origina


of originating call requests x 100%
(2) The number of originating call requests equals the nu
CS CSSR 5 90% Request messages sent by the originating call UE. For one
by 1 regardless of how many times the RRC Connection R
retransmitted.
(3) The number of originating call completions equals the
messages received by the originating call UE.
(4) This counter can be manually measured if the signalin
recorded.

(1) PDP Context Activation Success Rate = Number of suc


activations/Number of PDP context activation requests x
(2) The number of PDP context activation requests can b
following:
R99 PS CSSR 5 90% A. The number of RRC Connection Request messages (w
interactive service or background service) sent by UEs. D
PDP context activation requests is increased by 1 regardle
RRC Connection Request messages are retransmitted.
B. The number of Activate PDP Context Request message
It is recommended that definition A be used.
(3) The number of successful PDP context activations equ
PDP Context Accept messages received by a UE.
(4) This counter can be manually measured if the signalin
recorded.

08/31/2018 华为保密信息,未经授权禁止扩散 第37页,共45页


395900776.xlsx 文档密级

(1) CS call drop rate = (number of CS call drops)/(number


connections)
CS DCR - 5% (2) Number of successful CS call connections: the numbe
received by UEs after service requests are sent.
(3) Number of CS call drops: According to the Uu interfac
during a call (connection state), if a Uu interface message
three conditions, the number of CS call drops increases b
a. The RRC Release message is not received, but the UE s
CELL_DCH to IDLE.
b. The RRC Release message is received and the release c
c. One of the following messages is received: CC Disconn
CC Release. In addition, the release cause value is none o
Clearing, Normal Unspecified, user busy, user alerting no
destination out of order

The measurement should be performed on the RNC side


CS Soft HSR - 90% (1) Success Rate = Number of successes/Number of attem
(2) Number of attempts equals the number of Active Set
RNC.
(3) Number of successes equals the number of Active Se
received by the RNC.

* All testing will be conducted in good 3G Coverage RSCP >-90 EcIo>-11. (Thresholds as per design criterion)

DT KPIs issue description


sector1
sector2
sector3
test methodology
The call duration and wait time in idle for the DT KPIs:
Call Duration: 60 Sec
Wait time in idle: 10 Sec

08/31/2018 华为保密信息,未经授权禁止扩散 第38页,共45页


395900776.xlsx 文档密级

Test Procedure for Isolated Site

Description Logfile Name

ed to 3G,measure voice CSSR,DCR and SHO successful Rate,


ests should be performed in the areas where Ec/Io ≥ -11 dB and
-90 dBm. Logfile Name:
ailures caused by network congestion or poor network coverage SitenameXX_TestContent_TestTime_DTEngineer
ot be taken into consideration. name_logfileCount.log
ailures caused by only Vendors RAN equipment should be taken into
ation.

ed to 3G,measure voice CSSR.


ests should be performed in the areas where Ec/Io ≥ -11 dB and
-90 dBm. Logfile Name:
ailures caused by network congestion or poor network coverage SitenameXX_TestContent_TestTime_DTEngineer
ot be taken into consideration. name_logfileCount.log
ailures caused by only Vendor RAN equipment should be taken into
ation.

Definition Sector 1- Carrier1

ating Call Completion Rate = Number of originating call completions/Number


ting call requests x 100%
mber of originating call requests equals the number of RRC Connection
messages sent by the originating call UE. For one call, the counter is increased 100%
dless of how many times the RRC Connection Request messages are
tted.
mber of originating call completions equals the number of Alerting
received by the originating call UE.
unter can be manually measured if the signaling on the UE side cannot be

ontext Activation Success Rate = Number of successful PDP context


s/Number of PDP context activation requests x 100%
mber of PDP context activation requests can be defined as either of the

mber of RRC Connection Request messages (with the cause value of 100%
e service or background service) sent by UEs. During a call, the number of
xt activation requests is increased by 1 regardless of how many times the
ection Request messages are retransmitted.
mber of Activate PDP Context Request messages sent by UEs.
mmended that definition A be used.
mber of successful PDP context activations equals the number of Activate
ext Accept messages received by a UE.
unter can be manually measured if the signaling on the UE side cannot be

08/31/2018 华为保密信息,未经授权禁止扩散 第39页,共45页


395900776.xlsx 文档密级

drop rate = (number of CS call drops)/(number of successful CS call


ns)
er of successful CS call connections: the number of Alerting messages 0%
y UEs after service requests are sent.
er of CS call drops: According to the Uu interface signaling on the UE side,
all (connection state), if a Uu interface message meets any of the following
ditions, the number of CS call drops increases by 1.
C Release message is not received, but the UE state is changed from
to IDLE.
C Release message is received and the release cause value is not Normal.
he following messages is received: CC Disconnect, CC Release Complete, and
e. In addition, the release cause value is none of the following: Normal
Normal Unspecified, user busy, user alerting no answer, call rejected, or
n out of order

urement should be performed on the RNC side:


s Rate = Number of successes/Number of attempts x 100% 100%
er of attempts equals the number of Active Set Update messages sent by the

er of successes equals the number of Active Set Update Complete messages


y the RNC.

08/31/2018 华为保密信息,未经授权禁止扩散 第40页,共45页


395900776.xlsx 文档密级

Example log File Name

Logfile Name:
U001_CS DT testing_0930am_swapnil_01.log

Logfile Name:
U001_R99 PS DT
testing_0930am_swapnil_01.log

Sector 2 - Carrier1 Sector 3- Carrier1

100% 100%

100% 100%

08/31/2018 华为保密信息,未经授权禁止扩散 第41页,共45页


395900776.xlsx 文档密级

0% 0%

100% 100%

08/31/2018 华为保密信息,未经授权禁止扩散 第42页,共45页


395900776.xlsx 文档密级

Sector 1- Carrier2 Sector 2 - Carrier2 Sector 3- Carrier2

100% 100% 100%

100% 100% 100%

08/31/2018 华为保密信息,未经授权禁止扩散 第43页,共45页


395900776.xlsx 文档密级

0% 0% 0%

100% 100% 100%

08/31/2018 华为保密信息,未经授权禁止扩散 第44页,共45页


395900776.xlsx 文档密级

08/31/2018 华为保密信息,未经授权禁止扩散 第45页,共45页

You might also like