Bio Park and Solid Bio Fuel

Production and Use of Bio Fuel

Alccer do Sal Portugal

ForesTech

Tecnologias Florestais S.A.

INDEX
1.

2.

Biomass Production and logistics 1.1 Aerial Biomass 1.2 Old Practices New Resources Stumps 1.3 - Logistics Bio Parque 1.3.1. Raw Materials 1.3.2. Mass Fluxes 1.3.3. Renewable Energy Use New Projects

Biomass Production and logistics


Aerial Biomass thinning, fitossanitary cuts, forest residues. New Resources Stumps Logistics Bio Parque

Biomass Production and Logistics

Biomass from thinning, fitossanitary cuts, forest residues.

Biomass Production and Logistics - Stumps

Developed by Forestech S.A. Replaced old method (still used) of removing and burning the stump Operations Involved Remove and Cut Stump Retrieve Crush Screen Chipping /shredding High Core wood dry mater per hectare High quality/homogenous biomass High output/ competitive price

Biomass Production - Logistics

Bio Parque

Located close to dense forest area Receive, Process, Store and deliver all forest base material

Crush, screen, dry, store, chip, biomass densification


Main Products:

Technology demonstration Wood Chips Boiler Fuel Standard High quality bio fuel Dry Wood Chips Pellets

Biomass Production and Logistics Raw Material

- Raw Material to receive:


Pine Logs Forestry Residues Residues from Forest management: Eucaliptus Stumps Pine Stumps Material from Thinnings SRC

1.

Biomass Production and Logistics


1.3.2 Mass Fluxes - Process

Wood Chip Logs

Process:
Debark Crush Screen Dry Chip Densify Store

Wood board industry

Forest Residues

Biomass

Pellets Dry Chips

Residues: Forest management

Bio Solid Fuel

Boiler Fuel

1.

Biomass Production and logistics


1.3.3 Renewable Energy Use

The process is aimed to operate continuously


There is a high consumption of heat and power

Use of Bio Energy


Combined Heat and Power

Biomass Production and logistics


Renewable Energy Use- Fluxes

Boiler Fuel

Thermal Oil boiler + ORC

Heat: Steam Hot water


Dry Thermal treatment

Wood Chip Wood board industry

Pellets
Raw Material

Dry Chips
Power:
For engines, chippers screens

Forest Residues Bark

Grid Power

Boiler Fuel

2. New Projects
2.1 Biomass CHP Power plant

ORC -1.5MWe/h Drying Capacity of 10Ton/h dry Bio fuel

1,300,000 /year 20 guaranteed Tariff Personnel Synergy


Maintenance Operators Office

2. New Projects
Biomass CHP Power Plants

Grid Connection and Location:


Rio Maior 6 Mwe Power plant + Bio Park Vila Nova de Milfontes 3MWe Power plant + Bio Park Algarve: Loul 5 Star Hotel , Golfe Camps, and High Quality Villa Resort Castro Marim - 5 Star Hotel , Golfe Camps, and High Quality Villa Resort 10 Hectare Green house Natural Gas Consumer Faro Amitrena Recycling Facility

Biomass Cogeneration Sites:

Objectives:

Defend the Forest and Forest Economy Establish the Bio Parks Establish own SRC production Establish a sustainable production of high quality, and economical competitive biofuels Produce Quality biomaterials: Low moisture chips, Pellets, Install and Deliver Bioenergy Solution and Systems
Telephone: 00 351 289896720 Mobile : 00 351 912899565 Fax: 00 351 289896729 geral@forestech.pt www.forestech.pt

Adress: Estrada Nacional 125, Km 96,7 Caixa Postal 641 Arneiro 8005 - 412 Faro Portugal