You are on page 1of 40

Automatic Control of Level Crossing Gate & Automatic Stop and Announcement of Train at Station

FINAL YEAR PROJECT

Prepared by
SHAYAN MAZUMDAR PRATIK KUMAR GHOSAL SAIKAT ROY AVINAbA BANERJEE ARKAPRAVA CHAKRABORTY SOUMYAJIT GOSWAMY SANKHADEEP BISWAS

GUIDED BY

MR. BAPPADITYA CHATTERJEE

CONTENTS
OVERVIEW OF THE PROJECT

POWER SUPPLY UNIT


AUTOMATIC RAILWAY GATE CONTROL AUTOMATIC STOPPING OF TRAIN AT STATION AUTOMATIC TRAIN ANNOUNCEMENT AT

STATION SCOPE OF PROJECT & ITS ADVANTAGES

Overview of the project


AUTOMATIC RAILWAY GATE CONTROL
AUTOMATIC STOPPING OF TRAIN AT STATION AUTOMATIC TRAIN ANNOUNCEMENT AT

STATION

Power Supply Unit

Power supply unit consists of following units:


i) Step down transformer ii) Rectifier unit iii) Input filter iv) Regulator unit v) Output filter

to be continued..

Block diagram of a power supply

STEPDOWN TRANSFORMER
The Step down Transformer is used to step down the main

supply voltage from 230V AC to lower value

RECTIFIER UNIT
The Rectifier circuit is used to convert the AC voltage

into its corresponding DC voltage

INPUT FILTER
The ripples from the DC voltage are removed

and pure DC voltage is obtained

REGULATOR UNIT
Regulator regulates the output voltage to be always

constant

OUTPUT FILTER
This filter is fixed after the Regulator circuit to

filter any of the possibly found ripples in the output received finally. Capacitors are used as filter.

Circuit diagram of power supply

Automatic Railway gate control

Block diagram for rail gate control.

to be continued..

Basic adjustment of switches on railway track

to be continued..

At normal position when no switch detects the train

to be continued..

When Reed switch 1 detects the train

to be continued..

When Reed Switch 2 detects the train

to be continued..

Circuit diagram of gate control system

Automatic stopping at station using IR sensor

Block diagram of operation

to be continued..

Basic arrangement of reed switches in order to stop the train at station automatically.

to be continued..

When Reed switch 4 detects the train.

to be continued..

When Reed switch 5 detects the train

to be continued..

When Reed switch 1 detects the train

to be

continued..

Circuit diagram of transmitting circuit.

IR receiver setup when IR transmitter is OFF

IR receiver setup when IR transmitter is ON

Circuit diagram of receiver circuit.

Automatic announcement of train at station through LCD screen

Block diagram of operation

to be continued..

Basic set up of reed switches on the track

to be

continued..

When reed switch 3 detects the train

to be

continued..

When reed switch 5 detects the train

to be continued..

Circuit diagram of LCD interfacing with micro controller.

SCOPE OF PROJECT & ITS ADVANTAGES


This project helps INDIAN RAILWAYS making its present

working system a better one. This project can be further extended according to situation. Entire removal of existing system not required. Control room to regulate the working of the system, thus more user friendliness. Expansion of circuit & usage in a station possible with any number of platforms. More flexible and easy maintenance. System features over manual system: 1. No time lag to operate the device. 2. More accuracy.

Bibliography
We are indebted to Mr. Bappaditya Chatterjee, our

mentor for his support and help and encouragement. All the lecturers and professors of Saroj Mohan Institute of Technology for their allowing us to experiment with the new ideas and transforming them into reality. Some websites which helps us to do our jobs are www.google.com , www.engineersgarage.com , Wikipedia etc. Books which helps us are Op-Amps and linear integrated circuits by Ramakant A. Gayakwad, The 8051 Microcontroller And Embedded Systems Using Assembly And C by Mazidi.

Thank you

You might also like