Coiled Tubing

The CT is a continuous length of steel or composite tubing that is supplied


spooled on a large reel.

The CT unit is composed of a reel with the CT, an injector, control console,
power supply and well-control stack.

CT is used for intervention in oil and gas wells and sometimes as


production tubing in depleted wells.

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

Tubing

Steel pipe 1 OD to 3.5 OD


Yield strengths of 70,000, 80,000, 90,000, 100,000 psi
Relatively thin wall
Finite life due to fatigue cycles (bending)

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

Basic Equipment Package


Basic CT unit comprises:
Injector head
CT reel
Power pack
Control cabin
Pressure control equipment(PCE)

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

Injector Head
Hydraulically powered
counter rotating chains
Gripper blocks mounted in
chain assembly
Injector designation based
on maximum pull
capability, e.g 30K can pull
30,000 pounds

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

Typical Injector Head

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

Injector Head Chain Assembly


Most injector heads have two sets of opposing endless chains

Series of gripper blocks mounted on each chain


Gripping profile of each suits a specific tubing size

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

Injector Head Chain Assembly

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

CT Reel
Used to store tubing
Large radius for best tubing life
Level wind assembly to wrap
tubing on and off reel

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

CT Reel

Typical reel components:


Reel drum (1)
Reel drive system (2)
Levelwind assembly (3)
Lubrication system (4)
Depth counter (5)

2
Presentation Title (acronym) ;
Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

10

Power Pack
Hydraulic Power Units are the main driving components of hydraulic systems.
Consisting mainly of a motor, a reservoir and a hydraulic pump, these units
can generate a tremendous amount of power to drive most any kind of
hydraulic ram.

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

11

Control Cabin
Primary control center for the CT
Unit
CT instrument & controls
BOP Control
Monitoring Equipment and
operations

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

12

CTU Instruments and Controls


Primary instruments and controls
Weight indicator, circulating and wellhead pressures
Secondary instruments and controls
Depth/speed indicator, chain tensioner pressures, stripper
system pressure
Support instruments and controls
drive system pressures, BOP system pressure,

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

13

CT Pressure Control Equipment


Consists of two Main Parts
Blowout Preventer (Secondary PCE)
Stripper Packer (Primary PCE)
Accessories
Hydraulic quick latches
Lubricator risers
Adapter flanges
Crossovers
Flow tees
In-situ test subs

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

14

CT Pressure Control Equipment


CT BOP

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

15

CT Pressure Control Equipment


CT Stripper Packer (Packoff)

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Installed above BOP and below


Injector Head.
Hydraulic activation from
Control Cabin.
Forms a dynamic seal around
CT as it moves in and out of the
well.
Allows change of packing
elements without removing CT
from well.
Energized by well pressure from
below.
Additional packoff force
provided by hydraulic pressure.

Petroliam Nasional Berhad (PETRONAS) 2014

16

CT BHA
CT Knuckle Joint
Minimizes Curvature Effect Of CT
Assist in traveling through
doglegs
Sealed For Pressure Containment
Load Rating Comparable To CT

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

17

CT BHA
CT Swivel
Allows rotation to ease make up
problems
Sealed for pressure containments
High tensile capability
Ports to lubricate bearing

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

18

Basic Equipment Layout

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

19

CT Application
CT growth has been driven by economics, continual technological advances
and the successful utilization of CT to perform an ever-growing list of field
operations :

Scale Removal
Gas Lifting
Stimulation Fracturing & Acid treatments
Cementing
Workover Drilling / Milling
Electrical Applications Logging & perforating
Fishing
Permanent Installations Completions

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

20

CT Advantages
The advantages associated with CT are:

The ability to operate on live wells does not require well to be killed, thus
reducing risk of formation damage.
Quick mobilization and rig up.
Ability to work Rigless no associated rig costs.
Reduced surface footprint and crew configuration.
Efficient offshore mobilization skid mounted units.
Ability to perform operations while well is producing minimize production
downtime.
No connections and thus ability for continuous circulation during live well
intervention.

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

21

Scale Removal
Scale Control
Inorganic compound that precipitates due to loss of solubility
Requires water
Presence of CO2 increases chance of scale
Conditions
- Formation Water Naturally Produces Scale
- Combination of 2 Incompatible Waters
Three classifications
- Water Soluble NaCl
- Acid Soluble FeS, CaCO3
- Acid Insoluble BaSO4
Removal options for Acid Insoluble Scales
- Jetting
- Rotating jetting tool Slow Rotating Jetblaster
- Milling

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

22

Scale Removal
Scale Identification
Important scale samples are obtained :
Sample Bailers
LIBs
Simple laboratory test can identify whether the scale is acid soluble
so suitable scale removal could be planned

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

23

Scale Removal

Befor
e
Presentation Title (acronym) ;
Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

After

Petroliam Nasional Berhad (PETRONAS) 2014

24

Case Scenario-Penara Platform

Penara-A platform is under PSC between


PETRONAS and Sapura Kencana.

The Penara has a history of scale and wax


issues. Zone change and gas lift valve
change (GLVC) operation was initially
intended for the wells at Penara-A.

However, tubing clearance operation was


unable to be completed due to obstruction
from scale/wax.

Penara is monopod platform which is


unmaned have limited deck space and
crane capacity.

Hence the CT is done with assistance of


work barge , Saujana Tujuh.

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

25

Well Background
Item

Description

Well name

Penara A01

Location

Penara

Field

Small

Well Type

Oil Producer

Tubing Size

3 ,9.2lb/ft

Min. Restriction

2.69@ 2934m

End Of Tubing

2946m-MDDF

CO2

3%

Perforation Interval

2754-2756m-MDDF

BHT(static temp)

235 degF

Shut In BHP

2700psi

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

26

CT Operation

Normal CTU Operation


Presentation Title (acronym) ;
Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Catenary CTU Operation


Petroliam Nasional Berhad (PETRONAS) 2014

27

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

28

CT Equipment's

CT Reel with
Emergency Disconnect

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

CT Reel Control
Cabin

29

CT Equipment's

Batch Mixer

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Pumping Unit

Petroliam Nasional Berhad (PETRONAS) 2014

30

CT Equipment's

Nitrogen Converter

Liquid Nitrogen Tank

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

31

CT Equipment's

Gooseneck(Tubing Arch
Guide)
Injector Frame
Presentation Title (acronym) ;
Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

32

CT Equipment's
SBOP(Slip Ram)

Dual COMBI BOP

Flowback Line

Dual COMBI BOP

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Pumping Line

Dual COMBI BOP

SBOP(Slip Ram)

Petroliam Nasional Berhad (PETRONAS) 2014

33

CT Equipment's

JETBLASTER Covered
With Wax

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

JETBLASTER After
Cleanup

Petroliam Nasional Berhad (PETRONAS) 2014

34

CT BHA
Item

Description

Eternal Dimple Connector

It is attached to the CT end by set screws that engaged performed


dimples which formed using dimpling tool

FC Release Sub

essential piece of equipment used for releasing the CT from the


bottom hole assembly if it has become stuck while in the wellbore.

X-over

To provide connection between tools with different connection and


sizes

Shorty MHA

The Motor Head Assembly serves as a multi-function tool. The


Motor Head Assembly combines the CT connector, dual back
pressure valve, and hydraulic disconnect into one compact tool.
Utilizing this tool in the bottom hole assembly greatly shortens the
overall length of the complete tool string. A shorter bottom hole
assembly requires less lubricator, allowing for a much safer rig up
of the CT injector head. The components can also be separated
into different configurations depending on specific requirements.

Straight Bar

The Straight Bar is often used to extend very short tool strings,
such as a simple cleanout or lifting tool string. By extending a
short tool string the possibility of standing up in restrictions will
reduce. Therefore a smoother RIH will be achieved.

JETBLASTER

High-pressurejetting service nozzle

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

35

CT BHA

Dimple
Connector

Straight Bar

Shorty MHA
Presentation Title (acronym) ;
Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

X over
Petroliam Nasional Berhad (PETRONAS) 2014

36

CT Jetblaster Head

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

37

CT Operation
Operation

Time(hrs)

Spot , Rig up and pressure test

12.00

Slickline to perform tubing clearance

6.00

Make CT connector and termination sub

2.00

Make up and function test JetBLASTER Nozzle

4.00

Run#1-RIH with JetBLASTER and perform SCO

36.00

Run#2-Nitrogen kick off

20.00

Rig Down & Skid Well

12.00

Contingency

12.00

Miscellaneous

12.00

Total Hours

116

Total Days

4.83

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

38

Rig Up
1. Conduct safety meeting.
2. Spot equipment to space availability.
3. Rig up treating lines, CT units and conduct function and pressure test.
4. Rig up injector head onto injector jacking frame.
5. Rig up crossover onto wellhead, necessary length of lubricators to space out between
wellhead and BOP and a pump-in tee.
6. Prepare hydraulic hoses.
7. Start up equipment and run equipment for a few minutes.
8. Jack up CT control cabin.
9. Function test injector jacking frame and BOP rams.
10. Prepare injector head and gooseneck.

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

39

Rig Up
11. Function test RIH and POOH.
12. Install gooseneck on injector head.
13. Stab in coil into injector head.
14. Make up CT end connector.
15. Pull test and pressure test end connector.
16. Rig up BOP
17. Make up remaining BHA.
18. Pressure test riser, stuffing box and flapper check valve.
19. Secure injector with chains.

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

40

Job Procedure
1. Pickle the CT with 7.5% HCL.
2. Circulate the CT with portable water at least twice throughout tubing volume
3. Perform surface circulation test with varying pump rate
4. Function test the JETBLASTER at surface
5. Before opening the Master Valve , pressure up above the valve equal to expected
well shut in pressure
6. After opening the valve, RIH CT at avg. 20ft/min to pass through wellhead stack
7. Increase RIH speed to avg. 50ft/min after 50 ft below wellhead stack.
8. Stop the CT 10 m above obstruction(wax/scale) as per Slickline Drift Run.
9. Start to pump seawater by increasing the pump rate and try to break through the
obstruction.
10. If no progress, pump mix of acid onto the obstruction and let it soak for at least 2
hours.
11. After soaking, RIH back with pumping SW and attempt break through the
obstruction.
Presentation Title (acronym) ;
Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

41

Job Procedure
11. Once CT have pass through the obstruction ,establish circulation by pumping
nitrified fluid.
12. After the CT have reached End Of Tubing, circulate 10bbls of gel and two bottoms
up with seawater or clean returns are observed at surface

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

JETBLASTER Function
Test
Petroliam Nasional Berhad (PETRONAS) 2014

42

Thank You

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

43

Back Up Slides

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

44

N2 Kick
1. Make CT BHA as per diagram and perform pressure test
2.

Open Master and Crown valve

3. After opening the valve, RIH CT at avg. 20ft/min to pass through wellhead stack
4. Increase RIH speed to avg. 50ft/min after 50 ft below wellhead stack.
5. At 600m start pumping the nitrogen.
6. Returns are monitored at all time after pumping started.
7. Continue RIH to 900m , start pumping the nitrogen for an hour.
8. Pump the nitrogen at interval of 300m for an hour if the well is still not flowing.
9. If hydrocarbon is observed to be flowing, stop pumping N 2 and monitor well flow.
10. POOH the CT to surface. Once at surface secure the well and bleed pressure
from the riser.

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

45

Treatment Parameters
Operating Data
Job Circulation

3500 psi

Wellhead or Choke Pressure

200 psi

Treating Fluid Data


Fluid Name

Pure Water

Specific Gravity

1.01

Sterling Bead Concentration

0.0wt%

Scale Data
Pre-job drift

2 2/2 in

Scale Eccentricity

0 in

Post Job Drift

2.63in

Scale Length

6212.0 ft

Nozzle Data
Number of Radial Nozzles

Size of Radial Nozzles

0.125in

Size of Down Jet Nozzles

0093in

Calculated Tool Data


Presentation Title (acronym) ;
Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Max Allowable Drift Ring OD

2.688in

Petroliam Nasional Berhad (PETRONAS) 2014

46

Tubing Pickle Mix


Concentration
for 1000 gal

10

bbls

202

HCL 33%

85

gals

774

Portable Water

325

gals

65

Iron Control

25

lbs

Corrosion
Inhibitor

gals

Iron Control

lbs

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

47

PowerCLEAN Gel
Item Material

Conc.

Unit

Total

Unit

Portable
Water

42

gal/bbl

4200

gal

J572

1.75

lb/bbl

175

lb

J353(O2
scavenger)

3.5

lb/bbl

350

lb

F103

0.25

gal/bbl

25

gal

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

48

DAD Acid
Item

Material

Conc.

Unit

Total

Unit

Portable Water

420

gpt

168

gal

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

49

CT Equipment's
Gooseneck

Strippe
r

Dual COMB
BOP

SBOP

Stripper on Close up

Riser
Wellhead
Stack

Injector Frame
Presentation Title (acronym) ;
Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

50

Injector Head Primary Components


Primary components/functions
include:
Hydraulic drive/brake system (1)
Drive chains and tensioners (2)
Gooseneck or guide-arch (3)
Weight indicator sensor (4)
Depth system sensor (5)
Stripper mount (6)

1
2

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

51

Guide Arch

HR 240 - 72-in.
HR 480 - 108-in.
HR 240 - 50-in.

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Petroliam Nasional Berhad (PETRONAS) 2014

API
Recommendation
s
Tubing Size
Radius
(in.)
(in.)
1-1/4 48 to 72
1-1/2 48 to 72
1-3/4 72 to 96
2
72 to
96
2-3/8 90 to 120
2-7/8
90 to
120
3-1/2 96 to 120
52

Reel Swivel and Manifold


Cable

Pressure
bulkhead

Coiled tubing

Jumper cable

Reel
collector
Presentation Title (acronym) ;
Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

Reel
axle
Petroliam Nasional Berhad (PETRONAS) 2014

CT isolation
valve

Reel
swivel
53

CT Weight & Footprint


Equipment

Weight
(MT)

Length Width Heigh


(ft)
(ft)
t (ft)

1-1/4 x 12K ft CT
Reel

11

10

10

Injector Head

Jacking Frame

10

12

10

Control Cabin

12

Power Pack

Combi BOP

Fluid Pump

10

25

Twin Batch Mixer

22

10

Pre-mix Tank

21

Liquid Nitrogen
Tank

11

14

12

Presentation Title (acronym) ;


Division Name/OPU/HCU/BU (acronym) ;
Name of Presenter

N2 Converter

Petroliam Nasional Berhad (PETRONAS) 2014

54

You might also like