Pune Municipal Corporation- Pune

WEL-COME
To
THE PRSENTATION

Consultancy Services for Preparation of Detailed Project Report


For

UTWT Road

Vadgaon (B), Pune


Road Department- Pune Municipal Corporation Pune

Detailed Project Report


July 2015
By,
Envirosafe Consultants,
Solapur

Project Location Map

Nalla

CA
NA
L

oad
R
d
aga
h
g
n
i
S

Project Road

ll
Na

/PUNE-MUMBA
I ROAD- NH-4

MUMBAI
PUNE
BYPASS

Project Key Plan

Existing Features

MAIN FEATURES OF THE PROJECT CORRIDOR


.
.
.
.
.
.
.

(.)

.
.
.
.
.

-
-

.
.
.

.
.
.

36.

(.)
....
(.)
(.)
.
.
.
.
. .

.
.
.
.
. .

.
.
.
.
. .

.
.
.

.
.
.

.
.
.

.
.
. .

.
.
. .

.
.
. .

SURVEY & INVESTIGATION


Total Station Survey
Pavement Testing
Core Test
BBD

Geotechnical Investigation CBR

TOTAL STATION SURVEY


Total Station survey is Carried
out for all 13 Roads of Vadgaon
(B) Taking all the details of
Manmade Structures & God
made Structures, & also all
services line along the road
side.
From above data we
have prepared the plan of the
road with marking of existing
features in separate layers.

BBD TESTING & ANALYSIS REPORT


Ch.

Test
Poin
t

Pave
ment
Temp.
(in
C)

LH
S
RH
S
LH
S
RH
S

32.
00
32.
00
32.
00
32.
00

50
10
0
15
0

Typ
e
of
Soi
l&
PI

C
l
a
y

Moistu
re
Conte
nt
%

Dial Gauge Reading


Initial
interm Final
ediate

Deflect
ion
(mm)

Reboun
d
Deflecti
on (D)

Correcti
on
for
Temp.
(mm)

Correc
tion
for
Seaso
n
(mm)

Correct
ed
Deflect
ion

Standar
d
Deviatio
n (mm)

Character
istic
Deflectio
n (mm)

11.9 0
8

28

25

0.33

0.65

0.030 1.04 0.71

0.73

2.46

86

85

1.70

3.40

0.030 1.04 3.57

47

42

0.55

1.10

0.030 1.04 1.17

58

52

0.69

1.38

0.030 1.04 1.47

W
i
t
h
P
I
<
1
5

6.92

CORE TESTING- REPORTS


Bulk Density For BM
Core
Weight of Weight of
SSD
Volume of Density of
Thicknes Core in
Core in
Weight Core (cm3) Core
s (mm)
Air (gm)
Water
of Core
(gm/cm3)
(gm)
(gm)

Sr.
No.

Core
ID

BM

33

554.60

328.80

560.00

231.20

2.40

BM

45

757.40

453.40

765.80

312.40

2.42

BM

40

666.80

405.00

673.20

268.20

2.49

BM

42

736.40

454.80

746.60

291.80

2.52

BM

35

636.29

403.04

704.23

324.24

2.44

BM

38

546.31

355.15

590.50

278.54

2.34

BM

40

716.14

437.18

725.05

291.00

2.48

Bulk Density For AC


1

AC

17

259.00

155.60

262.20

106.60

2.43

AC

25

451.60

272.40

453.40

181.00

2.50

AC

20

316.80

187.80

320.80

133.00

2.38

AC

27

522.00

315.60

542.60

209.00

2.50

AC

20

453.60

302.70

460.74

186.80

2.87

AC

20

322.80

298.10

420.08

151.04

2.64

AC

22

420.01

278.40

442.16

199.150

2.56

GEOTECHNICAL INVESTIGATION (CBR )


PROCTOR COMPACTION
TEST
(IS : 2720 (Part 8) : 1980)
CBR- TEST
(IS : 2720 (Part 16) : 1987)

Contd..
Proctor

2.05
2
Dry Density (gm/cc)
1.95
1.9
1.85
1.8
1.75
1.7
2

10

12

14

16

18

Moisture Content % (w)

Proctor Test (IS : 2720 (Part 8) : 1980)

OMC %

13.5

MDD (g/cc)

1.6

CBR:-(After correction to graph)

CBR of specimen at 2.5 mm


penetration
CBR of specimen at 5.0 mm
penetration

TEST-I

TESTII

Average

2.75

2.8

2.77

2.5

2.4

2.45

Contd..

PAVEMENT DESIGN
OVERLAY DESIGN (TWT) ON EXSITING CARRIAGE WAY PORTION
AS PER IRC-58-2001 & IRC-SP-76-2008
Table Summary of BBD Test Results & K Value for
Project Road
Sr
Road Name
Characteristic
K Value as
No.

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

Deflection Based per IRC SP-76


on BBD Study
2008
(mm)
(Kg/sqcm/cm)
Wadgaon Cha Raja
Panchali Sweets
RenukaNagari
Bhairawnath Foods
Sona Garden To SonaVihar
Sona Garden To Anad Terrace
Happy Colony
Nikhil Garden To Shree Ganga Place
Shelke Nagar
Narayan Bhag
Tejas Construction

2.46
2.34
2.15
2.45
2.95
2.68
2.54
2.66
2.89
2.74
2.22

6.2
6.2
6.2
6.2
6.2
6.2
6.2
6.2
6.2
6.2
6.2

Cumulative Repetition of Traffic: Design Life = 20 years, Traffic Growth


Rate, r = 0.075
Sr. Road Name
No.

CVPD

Cumulativ
e
repetition

Design Traffic
(25% of
Cumulative
repetition )

1.
2.
3.
4.
5.
6.
7.
8.

30
30
30
40
50
50
30
50

237093.13
237093.13
237093.13
316124.20
395155.22
395155.22
237093.13
395155.22

59273.28
59273.28
59273.28
79031.04
98788.80
98788.80
59273.28
98788.80

40
25
30

316124.20
205480.71
237093.13

79031.04
51370.18
59273.28

9.
10.
11.

Wadgaon Cha Raja


Panchali Sweets
RenukaNagari
Bhairawnath Foods
Sona Garden To SonaVihar
Sona Garden To Anad Terrace
Happy Colony
Nikhil Garden To Shree Ganga
Place
Shelke Nagar
Narayan Bhag
Tejas Construction

Proposals

Calculation for 50 CVPD:

Trail Thickness = 15 cm, Sub grade modulus = 6.2 kg/m2, design period = 20
yrs, modulus of rupture = 45 kg/m2, load safety factor = 1.2
Axle
load
(AL),
tonnes

AL
X 1.2

Stress,
Kg/m2

Stress
Ratio

Expected
repetitio
n, n

Fatigue
life, N

Fatigue
life
consum
ed

2.4x106
1.24x105
2.34x104

0.02
0.16
0.40

= 0.580<1

Single axle

10
12
14

12.0
14.4
16.8

22.00
24.75
27.50

0.48
54333.40
0.55
19757.60
0.61
9878.8
Tandem Axle
24
28.8
41.25
0.91
14818.20
Cumulative fatigue life consumed

The cumulative fatigue life consumed being less than 1, the design is safe from fatigue
considerations.
Edge
warping stress = = 0.664 kg/cm2

L = 100 cm, B = 100 cm, I = 60.36


L/I = 1.64
C = 0.0256 (from fig. 2- IRC: 58-2002)
The temperature differential was taken as 19C for the Maharashtra region.
Total of temperature warping stress & the highest axle load stress = 0.664+27.50 =
28.16kg/cm2 which is less than 45 kg/cm2, the flexural strength. So the pavement
thickness of 15 cm is safe under the combined action of wheel load & temperature.

Check for Conner Stress

Corner stress is not critical in a dowelled pavement. The corner stress can be
calculated value from the following formula:
Corner Stress:
The 98 percentile axle load is 14 tonnes. The wheel load, therefore, is 8 tonnes.
Radius of relative stiffness, I =
k = 6.2 kg/cm3
Tyre pressure = 7.2 kg/cm2
I=
= 61.08.
a = radius of area of contact of wheel.
Considering a single axle dual wheel,
a = [0.8521 x + () 0.5]0.5
a = [0.8521 x + () 0.5]0.5
= 27.66 cm.
Corner Stress =
= 39.02 kg/cm2< 45 kg/cm2.
The corner stress is less than the flexural strength of the concrete, i.e., 45
kg/cm2& the pavement thickness of 15 cm assumed is safe.

Proposed Plan for


Widening &
Strengthening

PROPOSED CROSS SECTION

ROAD SIDE FURNITURE'S


SIGN BOARDS - I

COST ESTIMATE
Name of Work :- Proposed Construction of UTWT Road at
Prabhag no -55, Vadgaon (B), Pune
RECAPITULATION SHEET

COST OF WORK PORTION


A.

Cost of UTWT Road work


TOTAL COST (A)
SAY RS

41486009
41486009
41486010

Thank You