Internship

MID TERM REVIEW


Shubham Saurabh
Section- A, Group- 2, Sub Group- 2
Learnings
• Scope Identification
• Estimation
• Shuttering Process and Execution
• Reinforcement Process and Execution
• Road Drain Process and Execution
• Plastering Process and Execution
Scope Identification
This is a process of identifying scope of work for
the project which involves studying of drawing
and identifying the works that has to be
constructed within the project.
Estimation
It is the process of estimating the quantities that
is required to construct the project, it is being
done by studying the drawing of the structures
and calculating the quantities as per the
dimensions.
Shuttering
The Process of shuttering is identified as:
Support Beam bottom Beam side Slab
Execution:
• Shuttering is being executed as per the sequence
identified.
• Support is checked properly for strength.
• Leveling work is done to level the shuttering work.
• Any gap has to be filled to arrest the slurry leakage.
Reinforcement
The Process involved in reinforcement is:
Cutting Bending Binding
Execution:
• First step is preparing the bar bending schedule as
per the drawing.
• Next is to cut the bars as per the schedule.
• Next step is to bend the bars as per the schedule.
• Last step is to bind the bars as per the drawing.
Road Drain
The Process involved in Road Drain Construction is:
Marking Excavation PCC Brick Work Plastering
Execution:
• It is being done as per the sequence identified
Plastering
The Process involved in Plastering is:
Hacking Mesh Fixing Bull Fixing Plastering
Execution:
• First step is hacking on concrete surface.
• Mesh fixing is done to reduce cracks by thermal effect,
which is done at the joint of brick work and concrete.
• Bull fixing is done to make a uniform thickness of the
plaster.
• Plastering is done on layer wise and checked for any
undulations and that has to be rectified if any.