Professional Documents
Culture Documents
Logo
Project Name
1
Company
Introduction Logo
Organization Name:
Deptt.:
Theme:
Need:
Team Facilitator :
Team Leader :
Team Members :
2
Company
Project Theme vs Methodology Logo
Quality DMAIC
Productivity DMAIC/PDCA
HR PDCA
Maintenance PDCA
Methodology DMAIC
1 Define Scoping tree Historical Pareto Analysis Cost estimation
trend
2 Measure SIPOC PFD Input-Output Process
Diagram Analysis Sheets Capability study
With VA and MSA
and NVA
3 Analyze Cause and Cause and Cause validation
Effect effect and FMEA
Diagram Matrix
4 Improve Implementation of countermeasure and trials
Methodology DMAIC
1 Define Historical Scoping Target Setting Cost Saving
Trend tree estimation
2 Measure PFD Analysis Cycle time Operator SWCS
With VA and study/setu utilization study
NVA p
changeov
ers study
3 Analyze 4M Analysis Kaizens Lay outing/
Automation/
Methodology PDCA
1 Plan TEI check Prioritizing Activity Plan and Cost Saving
sheet areas Target Setting estimation
2 Do Current Gaps in Measure KPI’s Act on decided
system current related to areas(Kaizens)
system current system
Methodology PDCA
1 Plan Scoping Tree Prioritizing Activity Plan and Cost Saving
and pareto areas Target Setting estimation
Analysis
2 Do Cause and Cause Act on root
Effect validation/ cause (Kaizens)
Analysis C-E Matrix
Content- Quality
1 • Identification of Problem
3 • Define Phase
4 • Measure Phase
5 • Analyze phase
6 • Improve Phase
7 • Control phase
8
Company
Logo
Content-Productivity
1 • Identification of Problem
3 • Define Phase
4 • Measure Phase
5 • Analyze phase
6 • Improve Phase
7 • Control phase
9
Company
Logo
Content-HR
1 • Identification of Problem
3 • Planning phase
4 • Doing Phase
5 • Checking Phase
6 • Acting Phase
7 • Results
10
Company
Logo
Content-Maintenance
1 • Identification of Problem
3 • Planning phase
4 • Doing Phase
5 • Checking Phase
6 • Acting Phase
7 • Results
11
Scoping Tree- Example Company
Logo
CCTHERMO-MARUTI-C CCP-SENSOR-C
12
Company
Historical Trend of Non-filling in CCP Sensor- Example Logo
120000
100000 100502
80000
PPM
63429
60000
48099 47981
40000 41795
34875
20000
0
Apr'16 May'16 June'16 July'16 Aug'16 Sep'16
Time Period
13
Company
Defect wise Pareto- Example Logo
Selected for
Project
14
Company
Logo
15
Company
SIPOC- Example Logo
Start End
RM High
Inspection Melting Pressure Shot Packing
Receiving Inspection Machinin Inspection
Die casting Blasting
g
START END
Storage of Raw
100 % final
material
Inference of PFD inspection
materia
l
Transfer
of metal Transfer of
to metal to
Melting of HPDC Die Casting 100% casting
Central metal M/C Process Fettling Shot Blasting
insp.
melting holding
Furnace furnace
17
Company
Input-Output Sheet- example Logo
Operator
Die Pm NVA Manual N/A C Skill level Min Level 2 OK
pm check sheet
safety door
NVA Manual Mould start closing speed medium speed N/A C Die coat As per WI 016-712 OK
closing
VA CP Die casting full shot visual ok as per ops N/A C Machine Name 250 Ton OK
Die casting appearance C origin position 346±5 mm 346
shot weight C v1 speed 0.22±0.05 m/s 0.25
C v2 speed 3±0.5 m/s 3.04
C s1 position 260±5 mm 260
Machine
intensification pressure
C 5±1 sec 6
hold time (in sec)
Accumulator
C 95±10 kg/cm2 95
pressure (kg/cm2)
C Metal Temperature 660±10 °C 670
C Die open time 10±2 sec 8
C Plunger return time 10±5 sec 8
C Ejection delay time 1.5±1.0 sec 0.5
C Ejection return time 1.5±1.0 sec 1
C Biscuit thickness 20±5 mm 17
C Die temp fix 170±50 °C 171
C Die temp moving 170±50 °C 170
C RM Grade ADC 12 ADC 12
Raw Material
C Metal Melting temp 700 °C
C Spectro sample As per Spectro OK
N2 degassing for
N vacuum sample
as per WI ok
c Size As per model OK
VA :- Value added Die /Mould C Die life 1.25 Lac OK
NVA :- NON value added N Oily OK
C :- Controlled
N :- Non Controlled N Dusty OK
18
Company
Process Capability study - example Logo
D
M A
I
C
Inference: Low Cp because of high
process spread, low Cpk because of
shift of mean towards LSL.
Company
Cause & Effect Analysis - Example Logo
D
Die Leak
Slide Wrong Machine
overheat
M A
Selection
Skill
Non
Filling
I
Silicon Percentage Hydraulic Biscuit thickness
High Pressure low Less or High
C
Gas impurity Low Die Chill Vent Jam
in molten temperature No Over flow or vent at Last
metal Low casting fill Point
pressure
Low metal temp
Casting Pre filling
2-MATERIAL 4-METHOD
20
Company
Cause Validation sheet- Example Logo
D
5 Slide over heat Ok
spray
6 N2 gas leak Checked and found 70 kg /cm2 As per ops found ok Ok
M A
Wrong machine selection
7 Die run on Hpdc 250 ton As per control plan ok Ok
Silicon percentage high As per chemical composition
8 Found ok Ok
report
Gas impurity in molten metal Found no gas type impurity in molten
9 After degassing vacuum sample Ok
I
metal
10 Hydraulic pressure low Hydraulic pressure found 145 kg/cm2 As per ops Ok
C
Actual see the die temperature by lesser
11 Die temp. Low As per ops Ok
gun
12 Casting pressure low Casting pressure found 845 kg/cm2 As per ops Ok
Biscuit thickness variation in part ± 5 mm
13 Biscuit thickness low or high As per ops Ok
No overflow or vent at Last fill On machine A oil shot taken found last fill
14 Gemba and fill test Ng
point point.
15 Metal temp. Low Metal temp. Found 665 °C As per ops Ok
16 Casting prefill Check practical and found ok By Gemba Ok
21
Kaizen For Filling Pattern- Kaizen sheet Company
Logo
Example
Company: Result: Reduce Blow
Deptt.: Hpdc
hole and Leakage Month of Report Nov’16
Production
rejection
Subject :- To reduce Blow hole and Leakage rejection Part No.: CCP Sensor Process: Die Casting
Quality
D
Cost
M A
Delivery
Safety
Morale
I
5S
C
Others
COMMENTS : COMMENTS: Cost 6.8 lac
In this pattern, filling is opposite from In this pattern, filling is done from side saving/Year Approx.
tube area . wards to tube area.
Date of Imple. 25/11/2016
D
M
A
I
C
23