CONSTRUCTION OF WATER CARRIERS FROM LBOD TO NABISAR

WEIR
LBOD Spinal Drain FLOW

PS-02

Pumping Station-01
For raw water

Brine Water
Channel Carrier Channel

Raw Water Reservoir

RO Plant

Treated Water Reservoir


OBJECTIVES OF PROJECT

 Introduction
 Energy is the life line of any developed and developing society. It plays a vital role
in the economic development. Like other developing countries Pakistan is also
facing acute energy crisis specially shortage of electricity in country. Which affects
the Pakistan’s socio economic activities and Industrial development, for this creates
many problems like unemployment, poverty, mental stress and hunger.
 To face such crisis there is need for huge power generation in the country to fulfill
the required requirement.
 Power generation through coal is the cheapest way.
 Fortunately Sindh Province is rich in the coal reservoirs.
 About 175 Billion metric tons coal reservoir located in Thar in Sindh province.
 About 100,000 MW of electricity may be generated from this reservoir, which will
address the country’s power requirement up to several decades.
 About 5.62 Billion Rs: as Revenue will be generated yearly.
 5-6 cusec water is required to generate 100 MW of Electricity.
 Phase-II designed for 35 cusec for generation of 660 MW
SILENT FEATURES OF
EXSISTNG SCHEME

Pumping station Brine water Channel


 Discharge: - 100 Cusec.
 Capacity : 30 cusec
 No Of Pumps: 5 Pumps  Bed width: 4.0 ft
 Capacity of Pumps: 25 Cusec each  Depth: 3.40
 1 Pump as Stand by.  Free Board : 1.0ft
 Hydraulic Gradient: 1:12,500.
Carrier Channel  Length: 79,000 ft. (79 RD)
 Discharge: - 100 Cusec.
 Bed Width: 10.0ft.
 Depth: 4.5ft.
Pumping Station Brine water
 Free Board: 2.0ft.
 Discharge: - 30 Cusec
 Side Slope: 1.25:1.
 No Of Pumps: 3 Pumps
 Hydraulic Gradient: 1:12,500.
 Length: 76,200 ft. (76.2 RD)  Capacity of Pumps: 15 Cusec each
 1 Pump as Stand by.
Raw Water Reservoir
 Storage Capacity: 100 Cusec for
15 Days
Reverse Osmosis Plant
 Area : 150 Acres
 Capacity: 24 (US) MGD
 Depth: 20 ft.
 Volume: 3,000 Acre-ft.
 977.554 Million(US gallons)

Treated Water Reservoir Weir


 Capacity: 35 Cusec for 30 Days  Height : 3.0ft
 Area: 105 acres  Width: 150.0ft
 Depth: 20 ft.  Max. Discharge: 15,700 cusec
 Volume: 2,100 Acre-ft.
 684.288 Million (US gallons)
BRIEF NOTE

• It is to informed the Forum that the scheme Construction of Water Carrier with
Capacity 100 Cs from Spinal Drain RD-362 (LBOD) to Nabisar for Power
Generation Units were launched by Government of Sindh.
• The water Carrier channel is designed for 100 Cs, in the start it was decided that 35
Cs Treated water will be provided to Sindh Engro Coal Mining Company
(SECMC) block-II looking to this water carrier channel and its all other
components were designed for 35 Cs, but in future and passing time it will be
increased upto 100 Cs .
• It is clear understanding that all the quantum of water which is 100 Cs is only for
the block-II which is allocated to Sindh Engro Coal Mining Company (SECMC).
• Now a request is received for an other 40 Cs of water for block-I .It is required for
other company, separately other then 100 Cs the following items / components will
be required.
1. New pumping station cumulative discharge 60 cusecs.
2. Existing water carrier channel can be enhanced up to capacity 160 cusecs by
raising banks and C.C Lining of existing channel.
3. Existing Brine water channel will be same capability can be increased by raising
banks and C.C Line work.
4. Discharge capacity of Raw water reservoir and Treated water reservoir can be
increased by raising banks and depth.
5. RO Plant will be enhanced, from 24(US) MGD to 50 (US) MGD.
6. For extra 40 cusec new scheme is to be launched the PC-I will be prepared by new
consultants to be hired .