The
NAVIGATOR WATCH will be boon to those who wants to live life on the edge. It will specifically
complement those who are in adventure and travelling. The specification on which the watch
is designed is as follows:
The LCD display- The age of liquid crystal display has given tremendous opportunity to
manipulate a lot of information that can be displayed at a time. It will enable us to display real-
time display of – Temperature, Altitude, Pressure, GPS data with latitude and longitude of a
particular place. It is water resistant having a synthetic coating.
The Strap of the watch will give it the complete design and will make it look fashionable and
sporty.
On-Board electronic sensors will display the time, altitude, temperature, GPS information,
Pressure at a go. This will be an indispensible gadget for military usages also. GPS device will
be customizable as there will be service providers who will be dealing with the GPS
information upload in the watch.
WATCH SPECIFICATION
Mass 76 g
Casing Composite
Color options Black + Silver
Battery type Li-Ion
BATTERY
Display type LED
Alarm/clock Yes
Timer Yes
EXTRAS
Altitude alarm Yes
SCREENING
PRELIMINARY DESIGN
PROTOTYPE
We have selected 3 locations for the plant setup- Kolkata, Mumbai, vizag.
For MUMBAI :-
For VIZAG :-
A B C
D E F G H I J K
Work Description Immediate Time (hour)
Element Predecessor
A Distribution of Raw Material None 6
B Body Molding A 1
C Strap fitting B 1
D Painting of body A 1
E Fitting in Time D 0.5
synchronization module
F Fitting GPS module E 1
G Fitting electronic Altimeter F 2
H Fitting infrared temp. device G 1.5
I Install of Digital Barometer H 2
J Connecting all components I 3
to LCD display
K Quality check and display J,I,H,G,F,E 4
check
MANUFACTURING CAPACITY PLANNING
1. Mapping the demand projection of all the styles to
the available production capacity CAPACITY PLANNING-BASIS
2. As some of the components are bought from
vendors, the company will maintain what it calls its
'supplier network planning' (SNP). Through a portal for
its vendors, orders can be placed keeping lead-times in CONTINUO
mind. Vendors will upload information daily on this US FLOW
portal, helping the company keep track of the TYPE
production in real time. MA SS
3. He demand for each watch variant will be matched PRODUCT
with the capacity within each of the company's ION TYPE
manufacturing shops, as well as those of its vendors. In
case the two do not fit advantageously, the forecast will
BATCH
get modified till a concrete production plan emerges.
TYPE
4. Reduce the idle time of machines and doing parallel
projects in the machine that will reduce the idle time
JOB-SHOP
and more utilization of capacity.
In case of the DATA WATCH as the operations volume is relatively high and the output variety is relatively low, continuous flow
type of production can be employed.
DOVETAILING OF PLANS
PLAN III
PLAN
II
TIME
Dovetailing of plans is thus necessary for attaining operational efficiency. From the table, it is evident that plan III is most
economical. However the production plan has to be in sync with the market forecasts. It is to be noted that if delay in
delivery is a very important factor and might result in loss of business then the company has to follow Plan I. This is where the
trade-off lies.
AGGREGATE PLANNING
Production planning in intermediate range less than a year for the company is as follows:
Inventory in hand
example: no of electronics that the watch needs
Relevant costs in aggregate planning
Basic production costs
fixed costs
variable costs
direct and indirect labour costs
Aggregate Planning is very vital for a company. It defines a company’s production rates, workforce levels
and inventory position with respect to market demand and available capacity. It balances the market
demand and the production rate of the organization.
FACILITY LAYOUT
The facility layout designed for the watch manufacturing plant has
been done to keep in mind the best utilization of space and
resources. As it is watch manufacturing so, we have decided to give
it a Product-layout design. Because in product –layout machines are
arranged according to the progressive steps by which a product is
made.
Defect prevention is preferable to The second principle is based on the observation that it is
nearly always less troublesome, more certain and less
quality inspection and correction expensive to prevent defects than to discover and correct
them.
Zero Defects is the quality standard The third is based on the normative nature of
requirements: if a requirement expresses what is
genuinely needed, then any unit that does not meet
requirements will not satisfy the need and is no good.
.Quality is measured in monetary Phil Crosby believes that every defect represents a cost,
which is often hidden. These costs include inspection
terms – the Price of time, rework, wasted material and labor, lost revenue
and the cost of customer dissatisfaction. When properly
Nonconformance (PONC) identified and accounted for, the magnitude of these
costs can be made apparent, which has three advantages:
1.cost-justification
2.measure progress
3.Decisions analysis
OPERATION CONTROL
Here we have two parts firstly the proposed design and secondly the
acceptable design which will be approved after undergoing all the steps
The proposed design:
The first step would include estimating the manufacturing
cost. this includes estimating the cost of all the components
for the original product as well as the equipments needed
to produce it(include prices)
CHECKING THE
COMPONENTS FOR
QUALITY
SPECIFICATION
ASSEMBLING THE COMPONENTS IN THE WATCH
AND FIXING THE COMPONENTS TO THE LCD
IF “NO”
DISPLAY PANEL
MARKETING AND
PACKAGING AND QUALITY CHECK AND QUALITY ASSUARANCE
SHIPPING THE
WATCHES AS PER LABELLING THE WATCHES
ORDER