Maintenance:
Increase availability Improve reliability Increase efficiency Reduce the downtime / Failure rate of mill. Smooth operation Availability of mills for operation /
main deciding plant load factor
What is wearing?
Wear is directly proportional to:
COAL MILL
TUBE MILL
Troubleshooting:
Problem: Problem: Incorrect coal fineness Possible cause: Uneven deflector blade settings Worn or damage deflector blades Low or high spring compression Grinding process
Calibrate the blades properly. Inspect repair and /or replace deflector blades
as soon as Possible Check the compression and change as required. Inspect repair by patching the holes or replacing the cone as soon as possible.
Reject material on bowl Failed grinding roll Uneven spring pressure Heavy reject material
material. Stop the pulverize repair or replace the Journal assembly. Check the spring pressure and change if required(250 kg/cm2). Stop the pulverized and remove the material & Check the damage.
Overview of maintenance:
Daily maintenance Weekly maintenance Shutdown maintenance
Weekly checks:
Greasing of spring adjusting bolt Greasing of journal stop bolt. Check gear case oil for contamination
Shutdown (Checks after 6-8 months) 6 Oil level in journal and its quality(800mm) All internal clearances Greasing the gear coupling
Isolation of mill:
Hot air shut off gates Cold air shut off gate Seal air shut off valves Mill discharge valve should be closed Mill and feeder motor breakers are to be
left open. Disconnect the electricity
Preventive maintenance:
Grinding rolls and bull ring
segments(Clearance 1-1.5mm) 1Spring gap adjustmen(Between journal head and head of spring assembly) Check the spring tension. Check the condition and height of bowl extension ring(Approx:90-95mm) ring(Approx:90Check the Condition of cone (eroded / Punctured)
Preventive maintenance:
Check the condition of classifier Check the height and condition of venturi. Check the sealing arrangement at the
insulation plates (damages due to temperature difference). Check the clearance between the scrapper and insulation plate regularly.
Preventive Maintenance:
Check the condition of oil in gearbox and
level of oil(SP257/1050L) Flush the oil coolers if required.
Packaged overhaul:
Replace the bullring segments contd.. 5.After installing bull ring segments if gap exists use shims around the periphery.
Packaged Overhaul:
Servicing of journal assembly: Procedure:
4.Lift the assembly by sliding over journal head assembly 5.If unable to remove use jack and fixture assembly.
Packaged Overhaul:
Servicing of spring assembly(T624 and
T625 Thrust brg.) ( Hydraulic jack for adjusting spring tension) Replacement of cone Replacement of bowl extension ring and vane assembly Servicing of all Mechanical seal if required. Servicing of Worm shaft assembly
Capital overhaul
Disassemble the mill completely.. Go for complete overhaul
Donts:
the mill. Do not alter classifier setting ,spring compression setting, roll ring settings, ringring-roll clearance etc. Do not carry out maint. Work inside the mill with out proper personnel safety equipment Do not weld on the bowl or any part attached to it unless the welding m/c is grounded to the bowl to prevent arcing on surfaces.
Coal Feeders:
Coal feeder is installed at the bottom of
the coal-bunker coal Capacity to supply coal (Range:7.4T/hr 43.6T/hr) Speed (Range:2.7 RPM 16RPM) Feed is proportional to change in speed.