You are on page 1of 14

N

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Imperial Wharf

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Local authority boundary

Order limits

Tunnel Main tunnel Shaft

London Borough of Hammersmith & Fulham

Mean low water

Ri v e rT h a me s

Br ig d e sC

o r ut

L m o b ad r R o d a

Y o r k

o a d

Falconbrook connection tunnel

London Borough of Wandsworth

Falconbrook
Y PumpingorStation k P l a c e
100m 0 100m

Scale 1:2500 at A1 1:5000 if reproduced at A3

FOR INFORMATION
hR g u o Pl
d a o

Location

Falconbrook Pumping Station London Borough of Wandsworth


Clapham Junction Document Information

Section 48 publicity Location plan Book of plans - section 10


S48-PP-10X-FALPS-000104 Mean low water July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

HW

Garage

Keyplan:

This drawing

York Gardens

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Bi rg de s C or ut C aP r ak r

Key:
Limits of land to be acquired or used (LLAU) + 105.40m
Pe n e n t h r on e Ho u e s

Existing levels (shown in metres above tunnel datum) Thames Water land

Bt at es re aC hp ae l

Thames Water buildings/structures

Car Park

Existing trees within surveyed area

s ok ad n Y r G re y ru d a go n u de t e l a vn r p

Thames Water access

Notes:
+ 103.44m 1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the + 103.87m Venturi building Falconbrook Pumping Station Advertising screen Gated Access drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used in the preparation of this drawing.

Work/ Industrial Building

West Elev.

Dis-used public toilet block + 105.27m

Gated Access

+ 103.06m

Work/ Industrial Building

Yo k r R o d a

Su s a b tt n i o

South Elev.

Lv ae ne dr Ra od

Work/ Industrial Building Bus stop

York Gardens public library and community centre

103.65

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

Y o r k P l a c e

103.93

103.97

Pl ac e

York Gardens

FOR INFORMATION

Yo r k

o d a

Location

c m o e nR

Falconbrook Pumping Station London Borough of Wandsworth


Document Information

Ne w

Section 48 publicity As existing site features plan Book of plans - section 10


S48-PP-10X-FALPS-000105 July 2012

hR g u o Pl d a o

Tr
c Thames Water Utilities Ltd 2008

Court
98

Orbis
HW

Wharf
Garage

98

El Sub Sta

B RD IG E S

C O U R T

54 to 72

53

36

t o

7 3

t o

8 7

1t o

9 5

Ho u e s

t o

1 8 2

8 8

9 6
Prices Court

1 0 3

Pe n e n t h r on e

t o

El Sub Sta

Su re g r y

York House
(site of)

Extent of area to be temporarily stopped up for construction of crossovers for site access

1 0 0

Ac
C o t t o n
7 3

1 0 1

R o w
4 5

t o

8 5

t o

El

Candlemakers

Sub Sta

o 1t 7

i gg er R

S qu ar e

a r dB d y

P LA C

CR

Y O

ME NR O

1 6

8 t o 1 4

P L A C E

AD

1 5

Y O R K

1 1 4

1 4

ou s e

NE WC O

1 7

o r ut

AD

Ga ne ly C

YO

2 5 3 1

2 3

52 to 72

M o l a s s e s

ow

Vicentia

Garage

York Gardens

Penge House

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

1 to 75
N

Penge House

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU) Route of temporary diversion of right of way
Battersea Chapel

Existing right of way temporarily stopped up Area of highway to be temporarily stopped up

Playground

Ap
El Sub Sta

Access to permanent works

Ac Notes:

Access to construction works

1. This plan does not show stopping up and diversions of limited duration (e.g. hoarding erection, minor utility diversions and minor highway works). 2. Only rights of way in or close to worksites are shown. The full extents of rights of way College are not shown where they cease to be relevant to the project.

10 4 t o 10 9 11 0

Ac

Fl n a o bo c ro k Pm i u p g n Sa ti tn o

4 6

t o

5 1

1 1 6

t o

1 2 1

1 2 2

t o

1 2 7

1 2 8

t o

1 3 3

t o 11 5
Community

El Sub Sta
2 0 1 8 8

Ap

2 4
2 2

Galleon

Ap
York Gardens

d e w r L e a u e Ho s

Centre

This part of York Gardens temporarily stopped up for construction of interception chamber, valve chamber and other works
At ru hr 1 t 9o 10m N w 5 e t 5 o H n os ue

40m

8 7

Scale 1:500 at A1 1:1000 if reproduced at A3

FOR APPROVAL

5 1 3

Location
8
1
3
1 1

Falconbrook Pumping Station London Borough of Wandsworth

Document Information
El Sub Sta

1 0
4 6

Section 48 publicity Access plan Book of plans - section 10


S48-AC-10X-FALPS-000009 July 2012

nc ii Cl

4 0

c Thames Water Utilities Ltd 2008

1 3 0 . 8 4

1 4 0 . 4 5

104.18
1 0 37 .8

1 41 0 .8

1 40 0 .4

Grass

Poplar g 1.3 s 4 h 15 Poplar g 1.6 s 4 h 15


Ash g 0.8 s 5 h 8

El Sub Sta
N Matchline: Sheet 2 Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

10 4. 25

1 3 0 . 8 2

1 4 0 . 4 3

1 3 0 . 6 5 1 3 0 . 7 6

Brick Setts
0 0. 14 3

104.39

h2 . 1

Gates

al l

I RF

CPS Fo t op ah t

Overgrown shrubs

Gate

RO AD

IF R

10 4. 02

I RF

104.33

h 2 . 1 1 1003. 3. 74 71

13 5 0. 7 7 .4 0 . 7 1 37 1 3 4 7 0 . 3 0 1 4 7 . 3 0 1

13 1 0. 8 1 0. 37 7

1 3 0 . 6 9 IF R h 21 .

4 1 . 4 0 1

1 4 0 . 4 5

1 2 0. 4 0. 14 3 14

1 0 38 .9

0 .4 1 41

Keyplan:

Co n W c

0 .1 1 40 C Dr 0 .7 1 39
0 .2 1 40 BW 0 .9 1 49

h1 . 5

1 0 3 1 . 7 0 4 3 . 7 1

13 0. 7 1

1 10 03 3. . 2 7 67

1 4 0 . 3 6

1 4 0 . 4 7

10 4. 01

YO RK

h2 . 1

1 38 0 .4

IF R

9 0. 13 3 9 0. 13 0

1 2 R IFh .

Gate
7 0. 13 4

1 3 0 . 6 5 1 3 0 . 7 5

7 0. 13 2

5 0. 13 7

5 0. 13 7

GV LP

1 3 0 . 8 5

LP
1 39 0 .6

IC CL103.84 IC CL104.00
IC CL103.97 LP

1 43 0 .8

8 0. 13 2

6 0. 13 7

1 10 03 3 3. . 5 36

H.Chestnut g 2.4 s 12 h 8

Gates

RG 103.43

13 0. 4 2

1 0 34 .7 1 0 34 .7

1 32 0 .9 1 33 0 .0

6 0. 13 9 8 0. 13 0

IC CL103.83
1 3 0 . 7 8 1 3 0 . 6 9

p k Si

8 0. 13 5

103.65
13 0. 7 3

13 0 0. 7

13 0 0. 6

B W

Stn 16A 103.358


1 33 0 .7

Grass
103.30

1 4 0 . 1 3 5 0 . 7 8 9

Sl i g Do in d o r

1 35 0 .0

Ov r e d eh a

1 01 1 .0

BUI L D

IC CL103.87

t c rk e Bi S t

Sl i g D in d o r o

1 32 1 0 .8 0 33 .0 Dr C

1 3 0 . 6 9 1 3 0 . 8 0

TJB

I l l u m

103.59

G t a s e

CPS Fo t op ah t

1 35 0 .3

ER

1 0 3 . 2 4

EJ B

IC IC CL103.59 CL103.59

1 32 0 .5 1 31 0 .9

RG 103.48

1 36 0 .4

IC CL103.60

13 7 o 0. C n 7 c 13 0 0. 6

IC 13 1 0. 8 C 13 L0. 8 4

1 31 0 .6 1 32 0 .2

1 0 4 . 6 9

JB

103.66
13 0 0. 9 14 2 0. 5

1 36 0 .9

1 39 0 .3

1 3 0 . 6 9

1 0 0

1 33 0 .2

1 3 0 . 2 0

G STATI ON

1 42 0 .2

Gr s a s

Co c n

Ta m a r c Fo op t1 36 tah 0 .8 Ov r e eh a d

1 44 0 .8

1 33 0 .3 1 59 0 .3

S ue D htr t or o
ER
13 1 0. 3

1 31 0 .6 1 31 0 .2

IC CL103.87

1 33 0 .0

CPS

Former pumping station substructure partially removed

RG 104.17

1 34 0 .6

G t a e

C n rt oc e e

1 38 0 .6

C n Wa oc l l

14 0 0. 1

1 36 0 .5

13 4 0. 8
LP

Ta m Fo r a o t p c a t h

103.92

1 35 0 .0

103.86

103.75

103.48

1 32 0 .8

103.77

103.60

103.52

13 7 0. 5

Conc Base 103.55

Tra am c Fo a ot t p h

1 43 0 .8

1 42 0 .0

IC CL103.93 13 2 0. 8

1 34 0 .3

14 5 0. 1 IC 18 2 0. 1 CL104.20 14 0 0. 2

13 4 0. 7

IC CL103.44

P M IG U PN S A IN T TO

1 36 0 .1

1 3 0 . 9 3

S 1 i 0 g n 3 b . 7 o 2 a r d C o 1 n 0 c 3 . 7 5

1 33 0 .4

1 0 3 . 8 5

Co c W n al l

i n a t e d

13 1 0. 1 6 0. 3 5 6 14 9 0. 1 13 2 0. 6

Stn 13A 103.617 13 8 0. 5 C S P

Cn oc 13 9 0. 2 13 4 0. 2 13 0 0. 6 0. 3 13 4 13 4 0. 4 Cn oc Stn 14A Wa l l 103.626 Si O eh a 13 2 v re d 0. li D d g o 6 n o r 14 2 0. 13 4 0. C 2 6 IC oc n CL103.61 IC 14 7 0. 1 IC 14 2 0. CL103.58 IC 2 CL103.33 CL103.58 IC IC IC Do or CL103.54 IC CL103.57 CL104.20 Stn 15A CL103.55 104.214
13 9 0. 4

IC CL103.30 LP

IC CL103.18

10 3. 29

EJB

13 0. 7 4 13 0. 6 5 Cn oc

1 01 1 .0

1m high boundary wall to be temporarily removed (railings on concrete upstand)

1 3 0 . 9 4

EJB

EJ B 1 3 0 . 7 3

FLO B AC N R O KP M O U PN S IG T T A IN O
1 37 0 .0

1 33 0 .1 1 32 0 .2

I RF h

IC CL103.89

13 8 0. 5 C n Wa oc l l RG 103.19 Tra am c

10 3. 36

Advertising screen to be removed

IG N

1 3 0 . 7 4

15 .

BW

1 32 0 .6

Co c n

t c rk e Bi S t

1 32 0 .1

18 0. 2 6

RG 103.55

1 33 0 .0

13 0. 6 7

1 34 0 .4

103.77

1 41 0 .5

W al l

103.31

Ta Fo r m ot ac pa t h

EJB

Creation of temporary site access will require removal of boundary fence. See note 1

1 4 0 . 5 8

13 8 0. 8

1 3 0 . 8 9

IC CL103.67

1 32 0 .8

O eh a v re d 13 9 0. 8

IC CL103.46

CPS Fo op t tah

1 38 0 .3

IC CL103.77 Stn 18A 103.824

9 0. 13 1

IC CL103.86

Stn 17A 103.807

13 5 0. 8

10 3. 40

8 0. 13 8

IC CL103.83

t c rk e Bi S t

PRF h 1 . 1 Co c e e n rt

P C S p h ot t Fo a

7 0. 13 6

oc Cn

8 0. 13 6

8 0. 13 4

1 33 0 .8 1 33 0 .6

1 2 R IFh . 8 0. 13 3

LP

Ta m a r c

1 4 0 . 5 3

1 0 3 . 8 5

BW

1 3 0 . 2 6

1 3 9 Co 0 .5 n W al c l

Ov r e eh a d

Co t i e n an r

I RF h 1 5 .

Co t i n an r e

1 36 0 .6

1 38 0 .4

1 31 0 .5 1 31 0 .8

IC CL103.36

1 32 0 .4

1 38 0 .6

Sk i p

Flowerbed

1 43 0 .0

1 44 0 .6

CPS Fo op t tah

1 32 0 .7

Ta m a r c

B I IG UL N D

BW

RG 103.06

RG 103.11

1 3 0 . 1 4

IC CL103.66

1 31 0 .9

IC CL104.32

Tarmac

IC CL103.29

PUM PI N

1 33 1 0 .3 0 33 .4 Co c n Pi l e

103.205

103.21

1 44 0 .8

1 32 0 .0

Stn 12A

1 3 0 . 2 4

1 37 0 .2

1 38 0 .3

1 39 0 .4

Disused toilet block

1 42 0 .0

1 37 0 .1

1 42 0 .0

1 33 0 .0

1 31 0 .4

1 30 0 .7

1 30 0 .6 1 31 0 .4

1 30 0 .9

IC CL103.87

1 0 1 3 0 . 3 . 05 1 3 0 0 0 .4 0 1 29 0 .2

Ta m a r c Fo t a op t h

1 39 0 .8

1 44 0 .5

h 7

1 37 0 .7 1 35 0 .9 1 36 0 .5 Co c n 1 35 0 .4 1 35 0 .4 1 35 0 .1

1 30 0 .4 1 31 0 .3

1 31 0 .2

1 32 0 .5

1 32 0 .4 1 33 0 .4

h03 .

Holly g 0.6

s 6 h 9

13 4 0. 4
IC Grass
13 6 0. 6

1 3 0 . 7 6 1 3 0 . 9 0

s 3

PRF

IC CL103.66

13 0 0. 3
104.86

13 1 0. 7 13 3 0. 5

LP 1 0 3 . 1 0 0 5 3 . 1 4

RG 103.06

13 9 0. 1 13 0 0. 3

IC CL103.19

103.35 LP LP

13 2 0. 2 13 3 0. 3

. 1 4 13 8 0. 2

13 6 0. 2 13 1 0. 4

1 34 0 .7

8 6 . 3 0 1

1 34 0 .2

Creation of site access will require temporary removal of boundary fence and removal of trees and vegetation. See note 1

1 37 0 .8

1 38 0 .7

Trees and Shrubs Cherry g 0.4 Cherry

IC CL103.39

13 3 0. 4 13 5 0. 3

12 0 0. 9
IC CL103.04 RG 102.92

IC CL103.07

1 32 0 .7

104.54

PRF h 0 . 3

13 3 0. 6 13 2 0. 5

12 5 0. 9 12 4 0. 9

13 1 0. 1

Grass

IF R

104.65

G as rs

C SF o P ot t p h a B 13 9 0. B 0 B B B 13 7 0. 0

h1 . 5

13 8 0. 1 B B

Br k Se i c t t s

Possible realignment of existing kerb. See note 1

1 31 0 .3

Bin

G t a e Tra am c Fo a ot t RG p h 104.18 14 5 0. 0 14 6 0. 4 14 9 0. 3 oc 14 6 0. 4 SP C n Wa l l Holly 9 IC g 0.9 9 . 3 CL104.20 0 s 5 Plum 1 g 0.6 h 7 Plum s 6 g 0.8 h 5 s 6

1 39 0 .7

Col 1 3 103.92 0 . 6 13 2 0. 5 8

Portable WC 13 2 r 0 . DC 2

RG 103.05

IC CL103.11

1 31 0 .6

1 30 0 .6

14 8 0. 0

13 7 0. 3
13 1 0. 9

13 0. 1 DC 1 3 2 r 0. 0 9

IC CL103.13

IC CL103.14

1 41 0 .5 Co c n

IFh . R 2 1

1 30 0 .1

IC IC CL103.97 107.31 CL103.91 14 5 0. 1

1 38 0 .4

SP

1 32 0 .4 1 62 0 .4

1 3 0 . 3 1 3 2 0 . 3 2 1 3 0 . 2 4

LP

RG 103.06

IC CL103.17

1 31 0 .2

1 30 0 .9

13 3 0. 2
IC CL103.88
1 0 3 . 1 9 13 2 0. 3 13 7 0. 2

Gates

Ta m a r c

Co c n W al l

1 36 0 .6 1 36 0 .3

1 4 0 . 4 I 1 RF h 1 . 5

104.66

h 6 104.19 Cherry g 0.55 s 4 h 6

s 12 h 10

13 0 0. 4
IC CL103.34

IC CL103.37

13 3 0. 3

Tra am c

LP RG

1 33 0 .5

IC CL103.27

13 9 0. 1

13 3 0. 2 13 1 0. 1

103.53

1 34 0 .0

13 5 0. 1

Cherry g 0.9

3 6 . 3 0 1

13 6 0. 6

C S P Fo a ot t p h

13 7 0. 2 13 9 0. 3

13 7 0. 0 13 2 0. 1

13 8 0. 1 13 3 0. 3

Tra am c

Bs T r am c ra Rm a p Bs r

1 0 1 35 0 .9 3 . 4 5

CPS

1 3 0 . 9 6

1 4 0 . 4 3

1 36 0 .3

h 5 104.26 Cherry g 0.5 s 5 h 7

CL103.46

13 0. 3 7 13 0. 4 9

9 5 . 3 0 1 4 5 . 3 0 3 1 13 9 0. 5 1 36 0. 13 4 7 GP 0. 4 4 0. 13

1 37 0 .0

BW

RE
13 2 0. 6

1 37 0 .6

IC RE

103.43 IC CL103.55

1 35 0 .8

1 36 0 .2

CL103.72 14 4 0. 9 13 1 0. 5 2x Vent Pipe

g 0.7 s 6 h 6 103.74

1 37 0 .9

1 31 0 .1

1 37 0 .4

1 35 0 .7

IC CL103.94

1 31 0 .4 1 32 0 .6

IC CL103.67

RG

H.Chestnut g 2.6 s 12 h 12

Cherry g 1.1 s 8 h 8

g 1.3 s 10 h 8

104.10

1 0 3 1 . 0 4 3 1 . 5 5

T am r a c

IC CL103.45 GP

1 3 0 . 9 9

1 4 0 . 4 6

Possible realignment of existing kerb. See note 1


IC CL103.95

Cherry g 0.9 s 7 h 10 104.42

CPS

103.34

1 37 0 .5

PRF h 0 . 3 1 36 0 .9 RG

1 37 0 .0

1 36 0 .2

1 37 0 .9

Cherry g 0.8

1 34 0 .4

Possible modifications to kerb alignment & northern section of York Gardens to enable set up of construction 104.49 site

1 36 0 .3 CPS

1 33 0 .0 1 31 0 .7

103.56

g 0.8 s 6 h 7

104.02

1 0 3 . 4 1 3 0 3 . 5 8

6 4 . 3 0 7 1 5 . 3 0 1
13 8 0. 4 13 0 0. 6

GP

1 3 0 5 1 3 .9 0 . 5 2

13 7 0. 1

1 32 0 .8

2 6 . 3 0 1

13 0 0. 5 LP

Temporary removal of 3m high site southern & western brick boundary wall (to be reinstated) 13 0

B 13 3 0. 3 13 1 0. 2

13 8 0. 2
RG 103.29

1 3 0 5 1 3 .4 0 . 4 7

1 3 0 . 5 3

RG 1 37 0 .9

1 4 0 . 0 1

1 36 0 .4

h1 . 1 5 0 44 .7

IC CL103.89

RE

Cherry g 0.9 103.83 s 8 h 12

Tarmac

13 1 0. 4

13 0 0. 4

.9 40 0 1

1 0 37 .9 1 0 38 .8

1 34 0 .1

Trees and Shrubs

1 34 0 .9

Cherry g 1.6 s 10 h 10

al l

1 38 0 .2

LP

PRF h 0 . 3

103.58

104.23

1 4 0 . 4 8

Bu sS h et l r e O/ H Bu sS h et l r e

1 36 0 .9

1 4 0 . 5 0

1 35 0 .7 CPS Fo t a op t h 1 34 0 .7

1 36 0 .4

1 4 0 . 0 2

1 4 0 . 5 1

1 40 0 .6

h0 . 3 1 44 0 .6

1 0 42 .1

1 36 0 .8

s 6 h 7

13 0 0. 8

14 6 0. 9
CPS

1 35 0 .8

14 6 0. 9

er be d

Cherry g 0.5

LIBRARY / COMMUNITY CENTRE

0. 1 3 61 3 1 0. 7 7 15 3 0. 6

104.27

g 0.7 s 3 h 6

.3 37 0 1

1 37 0 .0

Grass Bank

1 37 0 .0

Sub Sta

IC RE CL103.76

103.56

er be d

IC CL103.89

14 0. 4 8

CL103.78

1 0 4 . 1 5

El

So l i

Existing bus stop to be relocated. See note 2

Cherry g 0.9 s 8

1 36 0 .4

CPS h 10 IC

Tarmac

104.57

.1 41 d 0 e 1 t b et B n h ec r S e k c i r o lw B F .2 40 0 h 1 c t n et e S B k c i r B .3 39 0 1 .4 38 0 1

1 36 0 .9

F w l e o r bd e 13 0. 9 8
ec B nh
13 8 0. 7
13 0. 8 9

1 0 40 .2

Grass Bank

1 0 3 . 7 3 1 0 3 . 6 8

LP IC CL103.54 SP 103.57

.6 35 0 1

10 3. 50

CL103.74

1 34 0 .0

Co n W c

CPS

IF R

F l ow

RG

Be nc h

PR F

1 37 0 .4

1 4 0 . 5 3 Tr e s e a 1 4 0 . n S 4 d 1 hu rb 1 4 s 0 . 5 2 1 4 0 . 4 8

Stn 20A 103.897

104.48

13 4 0. 7 14 4 0. 9

LP

Fl ow

So l i

AD

1 0 37 .4 1 0 38 .5

1 38 0 .0

1 4 0 . 1 4

1 4 0 . 0 4 1 3 0 . 9 2

o d a

Sapling

1 4 0 . 0 4

RE

Gr a s s

Bi rk c

Bin

Yo r R k

al l

h1 . 5

1 36 0 .3

CPS

Be n h c

103.98

Grass

1 36 0 .3

s 11 h 14 103.90 103.94 Grass 103.96 LP

1 3 0 . 8 5

Bu h s

d e b r e w l Fo

CPS

Co n cW

1 44 0 .8

1 37 0 .6

CP SF o op ta t h

1 39 0 .2

IF R

13 2 0. 7

0 .1 1 39

g 0.7 s 4 h 7

1 0 3 . 8 5

1 0 3 . 8 3
t et S k c i r B

1 38 0 .0

1 37 0 .2

YO

g 0.7 s 5 h 5

h0 . 3

1 37 0 .6

CL103.63 RG IC CL103.67

Fl we Be o r d

1 37 0 .9

PRF

1 0 37 .1 1 0 38 .4

1 4 0 . 0 4

1 4 0 . 5 8

1 36 0 .5

1 37 0 .1

s 4 h 5

1 36 0 .9

1 38 0 .7

10 4. 47 10 3. 73

1 44 0 .3

1 36 0 .9

10 4. 51

1 36 0 .8

10 4. 09

1 37 0 .2

10 4. 53

Be c n h

g 0.7 s 6 h 6

De s Ve e a n e g tt n i o

WV

RG

1 37 0 .2

1 36 0 .6

1 36 0 .9 1 36 0 .9

1 3 0 . 7 0 1 3 0 . 7 9

I RF Ga e h t 12 .

1 41 0 .4

1 45 0 .6

1 37 0 .7

1 37 0 .8

. CBF h 3 3

.8 35 0 1 .8 35 0 1

Brick Setts

103.74

This drawing
103.50 LP
IC CL103.51 Poplar g 3.1 s 15 h 20

Possible realignment of existing kerb. See note 1


93 3. 10
WV EJB
g 0.4 LP WV IC CL103.95 SB IC CL103.88

PLAYGROUND
103.70
1 2 R IFh .

SP SP
8 0. 13 1

7 0. 13 2

GP

104.29

8 0. 13 5

8 0. 13 3

Public access temporarily diverted via York Gardens to footpath north of community centre
5 0. 13 8 6 0. 13 4

6 0. 13 4 5 0. 13 9

IC CL103.63

RG 103.64

0 .3 1 40
8 7 0 . 1 3

103.39

103.39

4 0. 13 6 5 0. 13 3
P C S p h ot t Fo a

7 0. 13 7 7 0. 13 9 13 9 7 0.

RG 103.77

LP

5 0. 13 5

13 4 0. 13 3 0. 4 5 GP IC Tarmac CL103.46 Footpath 13 6 0. 3 4 0. 13 4 13 4 0. 4

Ash g 1.0 s 4 h 7

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

s t c i Br k Se t

IC CL103.34

Key:
Limits of land to be acquired or used (LLAU) Trees to be removed Above ground structures to be removed Below ground structures to be removed or infilled Structure to be removed and relocated or reinstated

13 2 0. 6

13 8 0. 3

RG 103.30

13 5 0. 2

IC CL103.35

103.18

Ash g 1.2 s 10 h 12

Notes:
1. Construction access off York Road. Formation of associated vehicle crossover and realignment of kerbs are temporary. Vehicle crossovers to be removed and existing kerb alignment to be reinstated upon completion. 2. The existing bus stop may be relocated for the duration of the works. The exact location for the
104.35

IC CL103.45

Cherry g 1.7 s 10 h 8

103.41

Screening chamber structure

103.15 Cherry g 1.1 s 4 h 7

LP

bus stop relocation if required is currently being agreed with TFL. 3. Minor items to be removed (e.g. barriers, bollards etc.) are not shown. 4. General activities of site clearance such as

IC 103.21CL103.21

103.17

IC CL103.13

IC CL103.20

IC CL103.26

Grass

removal of hardstanding and foundations, stripping of topsoil and clearance of minor vegetation not shown.

1 1 0 0 3 3 . . 2 6 6 3

B W 13 0. 1 4 Bi S rk e c t t

13 2 0. 1
13 3 0. 1 13 6 0. 0

IC CL103.10

RG IC 13 0 0. CL103.11103.05 1 13 7 0 . DC 0 r 1 . 0 DC 0 3 3 r13 1 . 2 2 13 8 0. 0 B W 13 2 0. 1 G 13 4 0. a t 0 e IC B CL103.08

104.21 LP 103.13

H.Chestnut g 1.2 s 10 h 8

g 1.0 s 10 h 9

8 0 . 3 .8 0 30 1 0 1

13 6 0. 0 C SF o P ot t p h a 13 1 0. 0 LP 12 9 0. 9 12 2 0. 9

Bi S rk e c t t

g 1.0 s 10 h 5

Sheet layout

98 2. 10 94 2. 10

13 4 0. 0 12 6 0. 9

s 5

g 1.1

IC CL103.07

13 4 0. 1 13 3 0. 0

g 1.2 s 10 h 10

g 1.3 s 10 h 10

Sheet 2

LP

13 0. 5 0 13 0. 5 9

Sheet 1

RF I 5 . h1

.6 35 0 1

2 2 . 3 0 1

ac h m t 8 ar pa 3 T ot . 3 o 44 0 F 3. 1 C 10 I L C 58 3. 10

3 1 0 . 1 3 3 2 0 . 1 3

42 3. 10
RF I h

10m

10m

5 1.

104.28

104.19 104.28 104.22 104.02

103.57

s 6
h 9

13 8 0. 2 13 8 0. 3

Grass

IC

13 7 0. 2 13 3 0. 3 C n rt oc e e

I 1 0 RF 3 . h 5 5 1 . 5

Scale 1:200 at A1 1:400 if reproduced at A3

ac h m r at p Ta ot Fo

14 0. 0 4

Sapling

Fo lw e r b e d

1 0 3 . 9 4
103.85 LP 103.65

103.85

FOR APPROVAL

IF R h 1 . 2 104.41 1 3 0. 7 3

RE

Cherry Bike g 0.9 Racks s 8 h 10

6 0 . 4 0 1
7 9 . 3 0 1

h c n e B 7 8 . 3 0 1

t et S k c i r B

B e n c h

1 0 1 3 0 . 3 8 . 5 7 5 Bin

LP

1 6 . 3 0 1

Location
Sapling

h c n e B

5 6 0. 13

1 0 3 . 7 5 1 0 3 . 7 9

15 3 0. 6 B W 103.63 13 2 0. 8 104.94 G t a e 103.64 103.80

d e b r e w l Fo

d 1 0 e b 3 r e . 7 w 0 l Fo

Falconbrook Pumping Station London Borough of Wandsworth


Document Information

Sapling

0 7 0. 13

104.88 Cherry g 1.0

g 0.7 s 4 h 7

3 7 0. 13

Section 48 publicity Demolition and site clearance Sheet 1 of 2 Book of plans - section 10
S48-PP-10X-FALPS-000106 July 2012

13 2 0. 7

IC

Cherry g 1.0 s 7 h 6

g 0.8 s 5 h 6

103.64 RG 103.67 S.Birch g 0.9 s 10 h 12 S.Birch g 0.4 s 4 h 4 RG 103.63

3 9 0. 13
Cherry g 0.8 s 5 h 6

Bricks

S.Birch g 0.6 s 5 h 6

103.86

7 9 0. 13

RG 103.63

7 6 . 3 0 1

LP
.0 37 0 1

Trunk g 0.3 h 3

Bricks

13 0 0. 7

CPS

.3 37 0 1

103.82 13 3 0. 8 RE IC

W B

.4 49 0 9 1 9 . 3 0 1 .8 39 0 1

.8 39 0 1

RG 103.98 IC CL103.97

RE RE
13 5 0. 9

CPS

Rubber Matting

e g d e H

Stn 11A 103.870

Bricks

8 9 0. 13

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

York Gardens

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU)

Notes:
1. Construction access off York Road. Formation of associated vehicle crossover and realignment of kerbs are temporary. Vehicle crossovers to be removed and existing kerb alignment to be reinstated upon completion. 2. The existing bus stop may be relocated for the Area for potential bus stop relocation. See note 2 Site clearance of the entire area illustrated will not be required. Local site clearance will be required to enable construction of bus stop. duration of the works. The exact location for the bus stop relocation if required is currently being agreed with TFL. 3. Minor items to be removed (e.g. barriers, bollards etc.) are not shown. 4. General activities of site clearance such as removal of hardstanding and foundations, stripping of topsoil and clearance of minor vegetation not shown.
1 0 4 . 1 0

Sheet layout
10 4. 00

Sheet 2
10 4. 05
IC CL104.22

Sheet 1

1 0 4 . 2 2

Brick Setts

FH WV FH

LP

14 7 0. 1

1 0 4 . 2 8

104.14 104.88 104.34 Brick Setts

B W

6 1 . 4 0 1

1 0 4 . 2 8

Br ik c W

104.61 CPS

10 4. 88 H

ed ge

al l

104.12

1 0 41 .6

B e n c h

104.13 IC Bush FB CL104.14

IC CL104.22 FH IC CL104.16 Bushes 104.58 104.14 104.90 104.14 104.34

1 0 40 .2

1 0 40 .1

1 0 41 .3

.2 42 0 1

1 0 40 .2

B W

1 0 4 . 2 5

T am r a c

10m
10 4. 14 10 4. 00

10m

IC

LP 1 0 41 .9

Brick Setts

CL104.12

WV

Scale 1:200 at A1 1:400 if reproduced at A3

14 0. 1 0
RG 103.85

1 41 0 .1

14 0. 1 7

Tr am a c 14 0. 1 9

14 0. 0 0

1 0 40 .7

Brick Setts

1 0 39 .8
1 0. 14 7

1 0 4 . 2 6
1 0 4 . 1 0

1 0 38 .7

Gravel

.7 41 0 1

1 3 0 . 8 9

0 .7 1 38 C Dr 0 .4 1 39

104.25 104.10

.6 40 0 1

FOR APPROVAL

Location

0 .3 1 41

Falconbrook Pumping Station London Borough of Wandsworth


.7 40 0 1

Brick Setts

1 40 0 .3

CPS

1 41 0 .6

Br k W a l i c l

1 40 0 .2

1 3 0 . 6 4 1 3 0 . 7 5

1 41 0 .7

1 3 0 . 8 4

1 4 0 . 4 5

1 41 0 .8

1 40 0 .4

Grass

Poplar g 1.3 s 4 h 15 Poplar g 1.6 s 4 h 15 Ash g 0.8 s 5

10 4. 25

1 4 0 . 4 3

1 0 37 .8

Fh CB . 33

0 .1 1 44

.9 45 0 1

Document Information

Section 48 publicity

0 .8 1 41

104.58

LP

Playground

Demolition and site clearance Sheet 2 of 2 Book of plans - section 10


S48-PP-10X-FALPS-000107 July 2012

0 .4 1 42

0 .4 1 41

BW
0 .2 1 42
0 .4 1 41

0 .7 1 41

1 0 4 . 1 8 1 0 4 . 6 0

Matchline: Sheet 1
104.18

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Zone within which Work No. 10c would be located


7 1

98

Garage

98

Fl n a o bo c ro k Pm i u p g n Sa ti tn o
Zone within which Work No. 10a would be located
Fl n a o bo c ro k Pm i u p g n Sa ti tn o

1 8 2

Ho u e s

1t o

Pe n e n t h r on e

1 0 0

1 0 0

Su re g r y

El Sub Sta
1 0 1

El Sub Sta Centre

a r dB d y

CR

(Scale 1:1000)
AD
1 5
5

York Gardens
10m 0 10m

Community Sub Sta Centre

NE WC O

ME NR O

1 4

Table 1
Above ground permanent structure Maximum height above finished ground level (Minimum heights are in brackets where applicable) 2.0m

Valve chamber

Ventilation column(s) serving the shaft Ventilation column(s) serving the interception chamber Ventilation structure(s)

Plan
(Scale 1:200)
c Thames Water Utilities Ltd 2008

Zone within which the interception chamber and ventilation column(s) serving the shaft and ventilation column(s) serving the interception chamber may be located

Garage

York Gardens

Playground

El Sub Sta

El Sub Sta
2 0

York Gardens
Community

Inset showing LLAU for bus stop

8.0m (4.0m)

6.0m

3.0m

1 3

Keyplan:

5
1 8

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located (those listed in Table 1) Zone within which required landscaping would be located Limits of permanent access

Notes:
1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.

Scale 1:200 at A1 1:400 if reproduced at A3

FOR APPROVAL

Location

Falconbrook Pumping Station London Borough of Wandsworth


Document Information

Section 48 publicity Site works parameter plan Book of plans - section 10


S48-PP-10X-FALPS-000108 July 2012

N
1 8 2 1t o 1 8 2
El Sub Sta El Sub Sta

1t o

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Zone within which Work No. 10c would be located

Fl n a o bo c ro k Pm i u p g n Sa ti tn o

Zone within which Work No. 10a would be located

Fl n a o bo c ro k Pm i u p g n Sa ti tn o

1 0 0

El Sub Sta

1 0 0

El Sub Sta

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located (those listed in Table 1)
1 0 1 1 0 1

York Gardens
Community El Sub Sta Centre El Sub Sta Centre Community

York Gardens

Zone within which required landscaping would be located Limits of permanent access

Notes:
1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.

CR

EN RO AD

CR

a r dB d y

a r dB d y

NE WC OM

1t o

Fl n a o bo c ro k Pm i u p g n Sa ti tn o

Fl n a o bo c ro k Pm i u p g n Sa ti tn o

1 0 0

1 0 0

1t o

1 8 2

1 8 2

El Sub Sta

El Sub Sta

NE WC OM

Zone within which the interception chamber and ventilation column(s) serving the shaft and ventilation column(s) serving the interception chamber may be located

EN RO AD

El Sub Sta

El Sub Sta

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

FOR INFORMATION
1 0 1 1 0 1

Location

York Gardens
Community El Sub Sta Centre El Sub Sta Centre Community

York Gardens

Falconbrook Pumping Station London Borough of Wandsworth


Document Information

Section 48 publicity Site works parameter key plan Book of plans - section 10
S48-PP-10X-FALPS-000109 July 2012
a r dB d y
a r dB d y

CR

NR OA D

CR

NR OA D

c Thames Water Utilities Ltd 2008

OM

OM

N
o d a

York Gardens Adventure Playground

Yo r R k

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing Zone within which Work No.10c would be located

Electrical & control kiosk to be located within existing pumping station. Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn. Existing pumping station Existing venturi structure

Work No. 10b 3.2m internal dia. connection tunnel

Key:
Limits of land to be acquired or used (LLAU) Existing sewers 0.225m internal dia. ventilation column, 6m high Proposed access cover 104.50 Proposed level (shown in metres above tunnel datum) Zone within which all permanent site structures would be located

Horizontal de-aeration chamber 3.9m internal dia.

Zone within which ventilation column and ventilation structure may be located Existing screening chamber 0.7m internal dia. ventilation column of 4m minimum to 8m maximum height Valve chamber 103.90 103.10 Ventilation duct Ventilation structure 7m x 2.5m x 3m high

Zone within which the shaft would be located Zone within which permanent above ground structures would be located Limits of permanent access

Notes:
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or proposed site features plan. 4. Proposed hardstanding area replaces existing hardstanding. 5. Existing boundary wall to be reinstated. Design and positioning of gated access subject to development.

Yo k Ro d r a

Levels adjacent to the shaft to be reinstated to levels similar to existing

105.00

Existing electrical sub-station building Ventilation duct

103.80

Work No. 10a. CSO drop shaft (9m internal dia.) Alignment of existing compound wall. - see note 5.

Interception chamber

Zone within which Work No.10a would be located

Valve chamber

Levels within compound to be reinstated to existing levels. Valve chamber slab top level to be 104.5 (approx. 1.5m above adjacent ground level & integrated with boundary wall.)

Pumping station maintenance vehicle access to be relocated approx. 8m eastwards - see note 5

10m

10m

Scale 1:200 at A1 1:400 if reproduced at A3

York Gardens

ILLUSTRATIVE
York Gardens Library/Community Centre

Location

Falconbrook Pumping Station London Borough of Wandsworth


Document Information

Section 48 publicity Permanent works layout Book of plans - section 10


S48-PP-10X-FALPS-000110 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Car Park

Keyplan:

This drawing York Gardens Adventure Playground

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU) Zone within which permanent above ground structures would be located Zone within which required landscape would be located + 105.40m 103.70 105.40 104.80 104.20 Falconbrook Pumping Station West Elev. Electrical and control equipment to be located within pumping station Existing trees within surveyed area Existing levels (shown in metres above tunnel datum) Proposed levels (shown in metres above tunnel datum)

+ 103.65m

Existing venturi structure

+1 0 . 39 4 m

Thames Water access

Notes:
104.00 + 103.34m Ventilation column 6m high 1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic Ventilation column of 4m minimum to 8m maximum height 103.90
Su s a i b tt n o

Work/ Industrial Building


New public entrance

104.00

survey base, both of which have been used in the preparation of this drawing.

Raised planter bed upstand. Existing fencing to be removed along the raised planter bed. No soft landscaping over shaft access covers in this area Falconbrook Pumping Station compound wall to be demolished during construction and reinstated. Wall to this section to have openings to allow for visual connection during maintenance AA

Ventilation structure with brown roof of 3m height + 103.10m

Landscape key:
Hard Landscaping

+1 0 . 38 3 m

Soft Landscaping Valve chamber 104.80 104.25 103.80 104.50 Tree / Vegetation Canopy

Yo k r R o d a

103.70

Relocated gate access West Elev.

Grass / Planting Area

+ 103.19m 10m 0 10m

Scale 1:200 at A1 1:400 if reproduced at A3

INDICATIVE
Save for the layout of above ground structures which is illustrative

York Gardens

Location

Falconbrook Pumping Station London Borough of Wandsworth


York Gardens Public Library and Community Centre Document Information

Existing bus stop to be reinstated

Section 48 publicity Proposed landscape plan Book of plans - section 10


S48-PP-10X-FALPS-000111 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Proposed trees and vegetation Ventilation Column 4m minimum to 8m maximum height Raised planter incorporating the CSO shaft cover at +104.80 level

Substation Falconbrook Pumping Station Ventilation column 6m high Raised valve chamber Ventilation structure with brown roof 3m high

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Notes:
1. All dimensions and levels are approximate. 2. The purpose of this section is to illustrate the scale of the below ground infrastructure to be provided.

Section cut through retail outlet

York Road

Section AA

Valve chamber

Interception chamber

CSO drop shaft

10m

10m

Scale 1:200 at A1 1:400 if reproduced at A3

ILLUSTRATIVE

Location

Falconbrook Pumping Station London Borough of Wandsworth


A A

Document Information

Section 48 publicity Section AA


York Gardens

Book of plans - section 10


S48-PP-10X-FALPS-000112 July 2012

Y O R K

P L A C E

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Advertising screen Planter bed

Trees behind shown notionally Dis-used public WC Venturi building beyond

Screening building Falconbrook Pumping Station

Access gates

Pedestrian access gate to substation Substation

Keyplan:

This drawing

Metal fencing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Notes:
1. All dimensions and levels are approximate.

York Road

Existing landscaping and disused public WC

Falconbrook Pumping Station

As existing South elevation

New brick wall to match existing Falconbrook Pumping Station Maintenance access gates relocated Ventilation column within the pumping station 6m high Pedestrian access gate to substation Substation

Venturi building

Ventilation column 4m minimum to 8m maximum high

Shaft cover level raised above adjacent ground level. Raised levels to incorporated public seating Proposed trees Partial railing within wall to keep visual connection with the compound and the CSO shaft during maintenance New planting and vegetation Existing fencing shown beyond

1m

10m

Planter beds/ shaft

New open space

Scale 1:100 at A1 1:200 if reproduced at A3

Proposed South elevation

ILLUSTRATIVE

Location

Falconbrook Pumping Station London Borough of Wandsworth


Document Information

Section 48 publicity
S u Ee ot l a h vtn i o

As existing and proposed South elevation Book of plans - section 10


S48-PP-10X-FALPS-000113 July 2012

Y O R K

P L A C E

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 Venturi building Existing access Metal railings Falconbrook Pumping Station Screening Building This drawing Existing access
N

Keyplan: Dis-used public toilet block

Advertising screen

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Notes:
1. All dimensions and levels are approximate.

York Gardens adventure playground

Venturi structure

Disused public WC

As existing West elevation

Venturi building Pumping Station

Ventilation column 4m minimum to 8m maximum high Removable bollards

Proposed trees and vegetation New brick wall to match existing

Proposed trees and vegetation Low height brick wall

Partial railing within wall to keep visual connection with the compound and the CSO shaft during maintenance

1m

10m

New public entrance

Scale 1:100 at A1 1:200 if reproduced at A3

Proposed West elevation

B RD IG E S

N
C O U R T

ILLUSTRATIVE
Playground

Location

Falconbrook Pumping Station London Borough of Wandsworth


Document Information

We t e s El v a in t o
York Gardens

Section 48 publicity As existing and proposed West elevation Book of plans - section 10
S48-PP-10X-FALPS-000114 July 2012

c Thames Water Utilities Ltd 2008

Court
98

Orbis
Wharf
Garage

98

El Sub Sta

B RD IG E S

C O U R T
LB

54 to 72

53

36

t o

7 3

t o

Security office
8 7

Ho u e s

t o

1 8 2

8 8

9 6
Prices Court

1t o

9 5

1 0 3

Pe n e n t h r on e

t o

Protection slab to be placed over existing sewer


El Sub Sta

Construction access, left turn in


1 0 0

Su re g r y

York House
(site of)

Crane Storage (open area or containerised)

Shaft

C o t t o n

4 5

t o

Crane

1 0 1

R o w

7 3

t o

8 5

El

Candlemakers Construction access, left turn in


4 6 t o
5 1

Sub Sta

o 1t 7

ow

i gg er R

a r dB d y

qu ar e

P LA C

CR

Y O

ME NR O

P L A C E

AD

1 5

Y O R K

1 1 4

1 4

1 6

NE WC O

1 7

o r ut

AD

2 5 3 1

2 3

Ga ne ly C

YO

Vicentia

Garage

York Gardens

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Penge House
N

1 to 75

Keyplan:

Penge House

This drawing

Construction of new temporary bus stop.

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU) Hoarding

Offices / welfare building (3 storey)

TCBs

Maximum extent of working area Route of temporary diversion of right of way

Battersea Chapel

Playground

Site access

Access / haul route Site power structure


El Sub Sta

Existing sewers

Notes :
1. These construction phasing plans have been prepared to illustrate possible site layouts for the principle construction phases. Contractors may choose to lay sites out differently during
College

10 4 t o 10 9 11 0 t o 11 5

Concrete batching plant and aggregate storage area


Fl n a o bo c ro k Pm i u p g n Sa ti tn o

construction depending on their preferred construction methods subject to any controls on layout imposed through the planning submission and approval process. 2. Traffic management plans for construction phases of the work would be submitted to the

52 to 72

1 1 6

t o

1 2 1

1 2 2

t o

1 2 7

El Sub Sta

Workshop buildings

2 0 1 8 8

appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown. 3. Utility supplies for the construction of the works
6 2 2

2 4

would be agreed with the relevant utility company.


1 to 14 4. Additional noise mitigation including noise

Galleon Court

barriers may be required but is not shown on this drawing.

York Gardens
Community

Excavated material storage and handling area Possible modification to York Gardens to maintain vehicle access to community centre and library Workshop buildings

LV A E N E D R

R A O D

d e w r L e a u e Ho s

Centre

10m
At ru hr 1 t 9o N w 5 e t 5 o H n os ue

40m

8 7

Protection slab to be placed over existing sewer

Scale 1:500 at A1 1:1000 if reproduced at A3

ILLUSTRATIVE
Bus stop to be relocated north of site on York Road

Location
5 1 3

Falconbrook Pumping Station


8
1
3
1 1

London Borough of Wandsworth


Document Information

9
El Sub Sta

Section 48 publicity
1 0
4 6

Construction phases - phase 1 Site Playground setup, shaft construction & tunnelling Book of plans - section 10
S48-PP-10X-FALPS-000115 July 2012

c Thames Water Utilities Ltd 2008

Court
98

Orbis
Wharf
Garage

98

El Sub Sta

B RD IG E S

C O U R T
LB

54 to 72

Security office
53 36 t o
Playground

7 3

t o

8 7

Ho u e s

t o

1 8 2

8 8

9 6
Prices Court

1t o

9 5

1 0 3

Pe n e n t h r on e

t o

Protection slab to be placed over existing sewer


El Sub Sta

Construction access, left turn in

1 0 0

Su re g r y

York House
(site of)

Storage (open area or containerised)

Shaft

C o t t o n

4 5

t o

Crane

1 0 1

R o w

7 3

t o

8 5

El

Candlemakers Construction access, left turn in


4 6 t o
5 1

Sub Sta

o 1t 7

ow

i gg er R

a r dB d y

qu ar e

P LA C

CR

Y O

ME NR O

P L A C E

AD

1 5

Y O R K

1 1 4

1 4

1 6

NE WC O

1 7

o r ut

AD

2 5 3 1

2 3

Ga ne ly C

YO

Vicentia

Garage

York Gardens

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Penge House
N

1 to 75

Keyplan:

Penge House

This drawing

Temporary bus stop.

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU) Hoarding

Offices / welfare building (3 storey)

TCBs

Maximum extent of working area Route of temporary diversion of right of way

Battersea Chapel

Site access

Access / haul route Site power structure


El Sub Sta

Existing sewers

Notes :
1. These construction phasing plans have been prepared to illustrate possible site layouts for the principle construction phases. Contractors may choose to lay sites out differently during
College

10 4 t o 10 9 11 0 t o 11 5

Crane

Fl n a o bo c ro k Pm i u p g n Sa ti tn o

construction depending on their preferred construction methods subject to any controls on layout imposed through the planning submission and approval process.

52 to 72

1 1 6

t o

1 2 1

1 2 2

t o

1 2 7

Piling rig
El Sub Sta
2 0 1 8 8

2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown. 3. Utility supplies for the construction of the works
6 2 2

2 4

would be agreed with the relevant utility company.


1 to 14 4. Additional noise mitigation including noise

Galleon Court

barriers may be required but is not shown on this drawing.

York Gardens
Community

LV A E N E D R

R A O D

d e w r L e a u e Ho s

Centre

10m Workshop buildings Protection slab to be placed over existing sewer


At ru hr 1 t 9o N w 5 e t 5 o H n os ue

40m

8 7

Scale 1:500 at A1 1:1000 if reproduced at A3

ILLUSTRATIVE

Location
5 1 3

Falconbrook Pumping Station


8
1
3
1 1

London Borough of Wandsworth


Document Information

9
El Sub Sta

Section 48 publicity
1 0
4 6

Construction phases - phase 2 Construction Playground of other structures Book of plans - section 10
S48-PP-10X-FALPS-000116 July 2012