Table of Contents
Chapter 1
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
At a Glance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Vijeo Designer's main tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Installing Vijeo Designer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 Uninstalling Vijeo Designer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Chapter 2
2.1
Creating a project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
At a Glance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . At a Glance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . The Application at a Glance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Starting Vijeo Designer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Basic settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Creating variables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Creating the "Water level settings" screen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . At a Glance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Creating the "Water level setting" screen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Creating lamps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Creating navigation buttons. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Creating an alarm display popup window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Creating the "Water level meter" screen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . At a Glance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Creating the "Water level meter" screen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Creating a tank . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Creating a conduit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Creating a navigation button . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Creating the "Water level data chart" screen . . . . . . . . . . . . . . . . . . . . . . . . . . . At a Glance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Creating the "Water level data chart" screen . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 22 22 23 27 27 30 33 33 34 39 43 46 53 53 54 57 62 66 67 67 71
3
2.2
2.3
2.4
Chapter 3
Project Download. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79
At a Glance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79 Validation / Building / Correcting errors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80 Simulation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82 Downloading data and exiting a project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
Index
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87
At a Glance
Document Scope This manual presents the basic concepts of the Vijeo Designer software application required for the development of an application. For a more detailed feature description, refer to Vijeo Designer's online help.
Related Documents User Comments We welcome your comments about this document. You can reach us by e-mail at TECHCOMM@modicon.com
September 2003
September 2003
I
At a Glance
Purpose of this section What's in this Part? This section presents the main functions of the software together with its installation.
September 2003
September 2003
General
1
At a Glance
Purpose of this chapter What's in this Chapter? This chapter describes the Vijeo Designer software application.
September 2003
General
Overview
About Vijeo Designer Vijeo Designer is a state-of-the-art software application that allows you to create Human Machine Interfaces (HMI). It provides all the tools needed to design a project, from the acquisition of data to the creation and display of animated drawings. The table below presents the configuration required to use Vijeo Designer:
Elements Processor Memory Operating system Web browser Characteristics Pentium II 400 MHz or higher 128 MB of RAM Windows 2000 (Service Pack 2) Windows XP Internet Explorer 5.0 or higher
Required configuration
10
September 2003
General
Main features
Re-use the data: Vijeo Designer uses two types of data: l Internal data created in the user application, l External data provided by the devices (PLCs, remote I/Os, etc.). Graphical objects, Scripts and panels created with Vijeo Designer can be saved in the Toolchest (See Vijeo Designer's main tools, p. 13). It can thus be reused in other projects. This is particularly useful when optimizing the development of new applications or standardizing screens when co-developing, for example. Connect to multiple PLCs: Vijeo Designer can be used to simultaneously communicate with a number of Schneider PLCs. Create screen pages: Vijeo Designer can be used to create dynamic screens quickly and easily. It combines various functions in a simple program, such as moving objects, zooms, level indicators, On/Off indicators, buttons or other special graphics. Animated symbols can be used to build and edit a graphical screen very simply. Use scripts: Vijeo Designer incorporates a function used to create scripts. Thus, a "building block" created by one application can easily be reused in other projects. Report: Vijeo Designer also incorporates an advanced function designed to simplify the management of variables used in the animation screens, such as: l Configuring or modifying the variables and characteristics of objects via the Inspector (See Vijeo Designer's main tools, p. 13) window. Multi-language: Vijeo Designer can store the alarm messages or text objects for the same application in more than 20 different languages. Thus, while running the user program, a simple selection from the animation screen switches the display to the selected language. Edit variables created by other applications: Vijeo Designer can import or export variables in a CSV file. Similarly, variables created in Vijeo Designer can be exported in other applications.
September 2003
11
General
The list below represents the different units that can communicate with Vijeo Designer: l XBTG2110, l XBTG2120, l XBTG2130, l XBTG2220, l XBTG2330, l XBTG4320, l XBTG4330, l XBTG5230, l XBTG5330, l XBTG6330.
12
September 2003
General
September 2003
13
General
Designer Vijeo
?
Graphical Panel
Designer Vijeo
Manual_V41 Target1 Graphical Panels 1: Configuratio 2: Tank 3 : Chart Application Scripts Alarms Popup Windows Languages Data Files IO Manager
Designer Vijeo
Order 1 2 3 4 5 6 7 8 9
Vijeo
Vij...
Designer
Project
Var...
Too.. Position 8 2 36 8 45 56 9 Calling romizer Romizer successful Total size of HMI Runtime files is 813 KB. (832,540 bytes). Downloading Downloading Target1... Download Complete - 0 error(s), 2 warning(s) Romizing
Object Name
Lamps\2-states
A A A A
LampO_000... LampO_000...
Objects
Build
14
September 2003
General
View Info
?
3 Inspector Displays the selected object's parameters. When more than one object is selected, only those parameters common to the various objects are displayed. Lists all the objects appearing in the drawing, giving their creation order, name, position, animations and associated variables. The highlighted object in the list is selected in the drawing. Similarly, information is displayed for a group of objects (its order, name and position). You can display a list of the objects that make up the group by clicking +. Each object can be selected separately. Displays the progress and results of the error check, compilation and load. When an error occurs, the system displays an error message or warning message. To view the error location, double-click the message. A library of components (bar chart, timers, etc.) provided by the manufacturer or previously made by you. To place a component in the drawing, you must select the component and then drag it onto the drawing. Your own components can be exported and/or imported.
Data list
Feedback Zone
Toolchest
September 2003
15
General
16
September 2003
General
Installation procedure
Client Information
Enter the information. Enter your name, the name of the company for which you work and the product serial number. Username: VijeoDesigner Company name: Schneider SA Serial number
InstallShield
<Back Next > Cancel
Click "Next".
September 2003
17
General
Step 6
Input the KEY CODE made up of 15 alphanumeric characters and 2 hyphens, exactly as it appears on the back of the CD-ROM case.
KEY
InstallShield
<Back Next > Cancel
Click "Next". 7 8 9 10 11 If you accept the terms of the license agreement, click "Yes". Choose the installation folder (by default, this folder is "c:\Program Files\Schneider Electric"). Click "Next". Select Program Folder. Click "Next". Select "Yes" to create a shortcut icon on desktop. InstallShield will now install Vijeo Designer or one of its components. Click "Finish" when the installation is complete.
(1) Vijeo Designer's "Autorun" program will automatically start the installation program. If the installation does not begin automatically, click "Start \ Run" and then enter "x:\SETUP.EXE" in the "Open" box and click OK (x represents your CD-ROM's drive letter).
Note: At the end of the installation process, if the program ask to restart your computer, you must do it and so, all newly installed components are updated in the system. You mustnt restart the computer if the program dont ask to do.
18
September 2003
General
Use the "Add/Remove Programs" (Start \ Settings \ Control Panel menu), select Vijeo Designer and then select "Remove". Alternatively, you can select the Start \ Programs \ Schneider Electric \ Vijeo Designer \ Uninstall menu.
At the end of the uninstall process, you must restart your computer to take account of all the newly removed components.
September 2003
19
General
20
September 2003
Creating a project
2
At a Glance
Purpose of this chapter What's in this Chapter? This chapter gives a step by step description of how to produce a simple application using Vijeo Designer's main functions. This chapter contains the following sections:
Section 2.1 2.2 2.3 2.4 Topic Specifications Creating the "Water level settings" screen Creating the "Water level meter" screen Creating the "Water level data chart" screen Page 22 33 53 67
September 2003
21
Creating a project
2.1
At a Glance
Purpose of this subchapter What's in this Section?
Specifications
This subchapter describes Vijeo Designer's general features as well as the steps to create a sample project. This section contains the following topics:
Topic The Application at a Glance Starting Vijeo Designer Basic settings Creating variables Page 23 27 27 30
22
September 2003
Creating a project
September 2003
23
Creating a project
Settings screens
The water level must be set to display signals, alarms and error messages. The following diagrams present the "Water level settings (See Creating the "Water level setting" screen, p. 34)" screen. Water level setting
Water level Setting value
0
Esc
123
-- -7 4 1 8 5 2 . 9 6 3 Enter B6 +/Del
Next
Next
Click in this area to display the numeric keypad. Numeric Keypad: enter a value and press "Enter" to validate the input. Navigation button for accessing the "Water level meter" screen.
When the numeric value input by the user is outside the permitted range (0 to 100), three warnings are displayed: l An alarm array (See Creating an alarm display popup window, p. 46), l A red lamp blinks (See Creating lamps, p. 39), l An error message blinks (See Creating an alarm message, p. 41).
24
September 2003
Creating a project
The following diagram presents the settings screen with the warnings. Water level setting
Water level Setting value Alarm setting
123
2
03/01/08 19:04:20 The value of this setting
Next
Close
September 2003
25
Creating a project
Graphic representations
Water level changes can also be shown graphically. "Water Level Meter (See Creating the "Water level meter" screen, p. 54)" screen display: Water level meter
9
Next
"Water Level Data Chart (See Creating the "Water level data chart" screen, p. 71)" screen display: Water level data chart (History)
100 90 80 70 60 50 40 30 20 10 0
Back
26
September 2003
Creating a project
Basic settings
At a Glance Configuring your project correctly is essential before you begin to create a drawing. The following procedure does not describe how to configure the external inputs/ outputs, however. A project created in Vijeo Designer is a simple chain of information (database). Within a project, the target terminals are configured and organized in a hierarchical structure. Each target shows the hardware (PLC device) environment in which the project will be run.
September 2003
27
Creating a project
The following table describes the procedure to follow to create a project and select the remote device:
Step 1 Action This dialog box appears when Vijeo Designer is started. Click "Next" to continue.
Vijeo-Designer Welcome to Vijeo-Designer To create a project, click Next. To open the last project created, select "Open Last Project" and then click Finish. You can reconfigure the project settings in the following dialog boxes. Create new project Open Last project
< Back
Next >
Finish
Cancel
Note: If the above dialog box does not appear when you start Vijeo Designer, select the Navigator's "Vijeo-Manager" tab, then right-click "Vijeo-Manager" and select "New project".
28
September 2003
Creating a project
Step 2
Action
l Enter the name of your project and click OK (in our case, enter "Manual_V41"). l Select the XBT-G Target. l Select the required screen size.
New folders (screens, scripts, alarms, popup windows, languages, data files, etc.) are created.
Designer Vijeo
Manual_V41 Target1 Graphical Panels Application Scripts Alarms Popup Window Languages Data Files IO Manager
Note: To add another "Target" to the project, right-click "my project" then select "New project". 3 Save your project.
Vijeo
Vij...
Designer
Project..
Var...
Too..
September 2003
29
Creating a project
Creating variables
At a Glance A variable is a memory address indicated by a name. Vijeo Designer handles the following five types of variables: l Discrete, l Integer, l Float, l String, l Structure. Vijeo Designer uses the variables to communicate with the PLCs. You can also define internal variables that will only be used by Vijeo Designer. In our tutorial, since we will not be communicating with any PLCs, we will create only internal variables. The following table describes the procedure to follow for creating variables:
Step 1 Action Click the "Variables" tab in the "Navigator" window, then click right to select "New variable" and "Discrete".
Variable List: Sort By Target Name, Filter Target1 New Variable Paste Import Variables Export Variables Properties... Ctrl+V Ctrl+I Ctrl+E Alt+Enter Discrete Integer Float String Structure
30
Vijeo
Vije.
Designer
Project Variables
Toolchest
September 2003
Creating a project
Step 2
Action You will now change the name of the Discrete-type "Discrete01" variable to "alarm". Once the variable has been created, a properties window, "Inspector", will open.
Variable List: Sort By Target Name, Filter Target1 INT alarm
Repeat steps 1 and 2 to create integer-type variables called "sec" and "value". You have just created one Discrete variable and two integer variables.
Variable List: Sort By Target Name, Filter Target1 INT alarm INT sec INT value
Vijeo
Vij...
Designer
Pro...
Var...
Too...
Vijeo
Vij...
Designer
Pro..
Var...
Too...
September 2003
31
Creating a project
Step 4
Action In KeepHistorys parameter select "Disabled" for the "alarm" and "value" variable and select Enabled for the "sec" variable .
- Variable Name Description ArrayDimension DataType Source + KeepHistory + DataDetails + Alarm
32
September 2003
Creating a project
2.2
At a Glance
Purpose of this subchapter What's in this Section?
This subchapter describes how to create the first water level settings screen.
September 2003
33
Creating a project
123
Esc
-- -7 4 1 0 8 5 2 . 9 6 3
B6 +/Del
Enter
Next
Procedure
The following table describes the procedure to follow to create the first screen:
Step 1 2 3 Action Click the "Project" tab in the "Navigator" window and click on "Target1". Double-click "Graphical Panels" to open the folder. Rename "1:Panel1" as "1:Configuration" then double click on it to open the graphic screen window.
Designer Vijeo
Manual_V41 Target1 Graphical Panels 1: Configuration Application Scripts Alarms Popup Window Languages Data Files IO Manager
34
September 2003
Creating a project
The title of this screen is: "Water level setting". The following table describes the procedure to follow to create text:
Step 1 Action Click inside the graphic screen, and select the "Text" icon in the toolbar.
Graphical Editor
Click on the panel window where you want the text zone top left corner to be placed. Release the mouse button. Move the mouse to the position where you want to place the text zone right bottom corner. Click to enter the position. When the "Text Editor" window appears:
l Enter "Water level setting" l Select "Vijeo Sans Serif" as the font l Select "16" as the font size l Select "Normal" as the font style l Click OK Text Editor Language: Font: Font Style: 1: Language1 Vijeo Sans Serif Normal Font Width: 16 Font Height: 16
OK
Cancel
September 2003
35
Creating a project
The "#" text is used to enter numerical data, while the "Water level setting" text is used as the title. Note: Only use the "#" text to configure data in the animation. Do not press the "Enter" key after the "#" character. Doing so will invalidate the data animation settings. The following table describes the procedure to follow to create the "#" text:
Step 1 Action Create a "#" text object. To do so, refer to steps 1 and 2 in the "Create a title" table (See Create a title in the screen, p. 35), and configure the text properties as shown in the following screen:
Text Editor Language: Font: Font Style: 1: Language1 Vijeo Gothic Normal Font Width: 32 Font Height: 32
OK
Cancel
36
September 2003
Creating a project
Step 3
Value
Display Digits: Zero Suppress Keypad/Keyboard Input Display Popup Keypad Interlock Input Status Variable Group No.: Unassigned Order No. 0 Format: Dec.
Beep on Touch
Cancel
OK
Apply
In the "Animation Properties" dialog box, click the "Value" tab and check: l "Enable Value Animation" l "Keypad/Keyboard Input" l "Display Popup Keypad" l "Zero Suppress" Click the icon then:
l Select the "Value" variable l Enter 3.0 in the "Display Digits" field l Select "Integer" in "Data Type" field l Click OK
September 2003
37
Creating a project
Step 5
Action Next, create the "Water level, Setting value" text. Repeat steps 1 and 2 above with the following configuration: l Enter "Water level" and "Setting value" l Select "Vijeo Gothic" as the font l Select "16" as the font size l Select "Normal" as the font style l Click OK
Text Editor Language: Font: Font Style: 1: Language1 Vijeo Gothic Normal Font Width: 16 Font Height: 16
OK
Cancel
Click OK
Note: You can access and modify an object's settings in the "Inspector" window.
38
September 2003
Creating a project
Creating lamps
At a Glance "Animated symbols" are used to create lamps that light up when an error is detected. Water level setting
Water level Setting value Alarm setting
123
Vijeo
Vij...
Designer
Pro...
Var...
Toolchest
September 2003
39
Creating a project
Step 2
LampO_000...
LampO_000...
LampO_000...
LampO_001... LampO_001...
LampO_001...
...
Lamp2StO_0015_01 2-state lamps 0015 V4.0 120 240 40 40 alarm (0,255,0) (255,0,0) Select an item alarm _Minutes _Months _Seconds _SystemLanguage _UserApplicationLanguage _Year2 _Year4 alarm Value
(0,0,0) (102,102,102)
40
September 2003
Creating a project
You will now create text that blinks when the user enters an incorrect value or an error is detected. The following table describes the procedure to follow to create an error message that blinks:
Step 1 Action Create the "Alarm setting" text. Repeat steps 1 and 2 (See Create a title in the screen, p. 35) using the following settings:
Text Editor Language: Font: Font Style: 1: Language1 Vijeo Gothic Normal Font Width: 16 Font Height: 16
Alarm setting
OK
Cancel
In the "Inspector" window, enter: l "red (255,0,0)" for the TextColor l Set: l The BackColor to "transparent" l The LineColor to "transparent"
September 2003
41
Creating a project
Step 3
OK
Cancel
Apply
check boxes.
l Click the l Click OK.
42
September 2003
Creating a project
Next
Vij...
Designer
Pro...
Var...
Toolchest
September 2003
43
Creating a project
Step 2
SwSpO_000... SwSpO_000...
SwSpO_000...
SwSpO_001... SwSpO_001...
SwSpO_001...
In the "Inspector" window, enter 2 on ID. The number 2 on ID represents IDs screen who will be open when click on the button:
Inspector
Smart Part Width Height Operation ID ForeColor Label TextColor Interlock Buzzer Pattern BackColor FrameColor RestoreDefaults Animation FALSE TRUE 1 : SOLID (0,0,0) (153,153,153) (0,0,255) 80 40 Change Panel 2 (0,255,0)
44
September 2003
Creating a project
Step 4
"Text Editor" dialog box and configure each field as shown below:
Text Editor Language: Font: Font Style: Language1 Vijeo Sans Serif Normal Font Width: 8 Font Height: 16
Next
OK
Cancel
September 2003
45
Creating a project
Close
46
September 2003
Creating a project
The following table describes the procedure to follow to create a popup window:
Step 1 Action Click the "Project" tab in the "Navigator" window and right-click "Popup windows" in order to select "New popup window":
Designer Vijeo
Manual_V41 Target1 Graphical Panels 1: Configuration Application Scripts Alarms Popup Windows New Popup Window Languages Paste Popup Window 1: All Popup Windows... Delete Language1 2: Language2 Properties Data Files IO Manager Insert Ctrl+V Delete Alt+Enter
Rename "1:Window" as "1:AlarmWindow" and "10001:Panel4" as "10001:Alarmarray". Click "10001:Alarmarray" to open the drawing.
Vijeo
Vij...
Designer
Project
Var...
Tool...
September 2003
47
Creating a project
The following table gives the procedure to create an alarm display table:
Step 1 Action Click the "Alarm Summary" drawing icon to create the "Alarm" object.
In the "Inspector" window, change the following settings: l Enter "16" in the "FontHeight" field. l Enter "16" in the "FontWidth" field. l Enter "(white) 255,255,255" in the "BackAreaColor" field. l Set the "Frame" property to "Enabled". l Enter "(orange) 255,102,0" in the "Line Color" field. Next, set "Ruler" to "Enabled", and "Line Color" to "(dark blue) 0,0,153".
Inspector
Alarm RTNBlink FontHeight FontWidth BackAreaColor ShowColumnTitles Frame LineColor LineStyle LineWidth BackAreaColor Ruler LineColor LineStyle LineWidth BackAreaColor 1 (0,0,0) Enabled (0,0,153) 0 : SOLID 1 (0,0,0) No 16 16 (255,255,255) FALSE Enabled (255,102,0) 0 : SOLID
48
September 2003
Creating a project
After an error is detected, an alarm message is displayed in the "Alarm display" array (see "Displaying the alarms" above). The following table gives the procedure to create an alarm message:
Step 1 2 Action Click the "Variables" tab in the "Navigator" window in order to select the "alarm" variable. In the "Inspector" window, change the following settings: Set "Alarm" zone to "Enabled".
Inspector
Variable Name Description ArrayDimension DataType Source KeepHistory DataDetails Alarm AlarmMessage alarm alarm 0 Discrete Internal FALSE Enabled
Click the
In the "Alarm Message Editor" window, enter "The value of this setting exceeds 100" in the dialog box and then click OK.
Alarm Message Editor Language: 1: Language1
OK
Cancel
September 2003
49
Creating a project
Click the "Touch" tab and then click "Enable Touch Animation" check box.
Animation Properties Color Fill Size Position Rotate Touch Visib.
Add
Insert
Delete
OK
Cancel
Apply
50
September 2003
Creating a project
Step 6
Action
l Double click the "Operation" property to call up the "Function Setting"
dialog box.
l Select "Popup Panel" from the "Function" drop-down list, then click "Close
Popup Panel".
l Select "10001:Alarmarray" from the "Panel Name" drop-down list, and click
OK.
Function Setting Function Popup Panel Open Popup Panel Close Popup Panel
X 0
Y 0
Click the "Text" icon and create a text object named "Close", and enter the following settings:
Text Editor Language: Font: Font Style: 1: Language1 Vijeo Gothic Normal Font Width: 16 Font Height: 16
Close
OK
Cancel
September 2003
51
Creating a project
Step 8
Action
l Enter "(red) 255,0,102" in the "TextColor" field. l
Check the "Transparent" check box in the "BackColor" and "LineColor" fields.
52
September 2003
Creating a project
2.3
At a Glance
Purpose of this subchapter What's in this Section?
This subchapter describes how to create the second "Water level meter" screen.
September 2003
53
Creating a project
Next
54
September 2003
Creating a project
Procedure
Designer Vijeo
Designer Vijeo
Manual_V41 Target1 Graphical Panels New Panel 1: Confiion Report... Paste Panel ApplicationDelete All Panels... Scripts Alarms Properties Popup Windows Languages Data Files IO Manager Insert Ctrl+T Ctrl+V Delete Alt+Enter
Rename "2:Panel2" as "2:Tank" to open the graphical screen window. In the "Inspector" window, change the back area color by entering (yellow) "255,255,153".
Vijeo
Vij...
Designer
Project
Var...
Too...
September 2003
55
Creating a project
Here, we will create the following title: "Water level meter". The following table describes the procedure to create text:
Step 1 Action Click inside the graphic screen, and select the Toolbar's "Text" icon to draw an area on the screen where the text will be placed.
Graphical Editor
OK
Cancel
56
September 2003
Creating a project
Creating a tank
Illustration The graphic below represents the object to create. Water level meter
Next
2 3
For each rectangle, change the fore color to "pale green (153.153.102)" and the line color to transparent. Click the "Ellipse" drawing icon, then draw three ellipses shown below: Ellipse 1
Ellipse 2 Ellipse 3 4
l Ellipse 1: Change the fore color to "grey (153.153.153)" and the line color to
transparent.
l Ellipses 2 and 3: Change the fore color to "pale green (153.153.102)" and the
September 2003
57
Creating a project
Step 5
Action Click the "Rectangle" drawing icon, then draw a rectangle at the center of the large rectangle:
New Rectangle
Change the previously created rectangle's fore color to "white" (255.255.255) and the line color to "white" (255.255.255).
58
September 2003
Creating a project
Step 7
"Animation" in the "Inspector" window in order to open the "Animation Properties" window, and then click the "Fill" tab:
Animation Properties Color Fill Size Position Rotate Touch Visib.
Enable Vertical Fill Animation _seconds Start Point: Top Value Range From: To: 0 59 Display Range Min %: Max %: 0 100
OK
Cancel
Apply
l Check the "Enable Vertical Fill Animation" check box. l Click the
l l
Set "Start point" to "Top". Set "Back Area Color" to 0,0,255. l Set "Value Range" from 0 to 59. Note: "_seconds" is a system variable. It is reserved and can only be used by Vijeo Designer. 8 Click the drawing icon, then draw a graduated scale:
Graduated scale
September 2003
59
Creating a project
Step 10 11
Action Click inside the graphic screen, and select the Toolbar's "Text" icon to draw an area on the screen where the text will be placed. When the "Text Editor" window is displayed:
Text Editor Language: Font: Font Style: 1: Language1 Vijeo Gothic Normal Font Width: 16 Font Height: 16
OK
Cancel
l Enter "#" l Select "1: Language1" as the language l Select "Vijeo Gothic" as the font l Select "16" as the font size l Select "Normal" as the font style
12
In the "Inspector" window, change the text color properties to "255,255,255" and the back area color and line color to "255,102,0".
60
September 2003
Creating a project
Step 13
"Animation" in the "Inspector" window to open the "Animation Properties" window. Next, click the "Value" tab:
Animation Properties Color Position
12
Value
Display Digits: Zero Suppress Keypad/Keyboard Input Display Popup Keypad Interlock Input Status Variable Group No.: Unassigned Order No. 0 Format: Dec.
Beep on Touch
Cancel
OK
Apply
l Check the "Enable Value Animation" check box. l Click the l Click OK.
September 2003
61
Creating a project
Creating a conduit
Illustration The graphic below represents the object to draw. Water level meter
#
Next
2 3
Change the line color to "transparent" and the fore color to "grey" (153,153,153). Click the "Polygon" drawing icon object: G and then draw the following the following
D Procedure: l Click point A. l Click point B. Repeat the operation until point G. l Right-click.
62
September 2003
Creating a project
Step 4
Action Change the line color to "white" (255,255,255) and the fore color to blue (0,0,255).
5 6 7
Click the "Selection" icon and then select the arrow created in step 4. In the main menu bar, select "Edit" then "Copy" and "Paste". Select this arrow and choose "Rotate Right" in the pull-down "Arrange" menu. The arrow should have rotated clockwise so that the arrow is pointing to the left:
Designer Vijeo
Designer Vijeo
Align Manual_V41 Rotate Left Target1 Rotate Right Flip Horizontal Graphical Panels Flip Vertical 1: Panel Application Scripts Alarms Popup Windows Languages Data Files IO Manager
Repeat step 6. Select this arrow and choose "Rotate Left" in the pull-down "Arrange" menu. The arrow should have rotated anti-clockwise so that the arrow is pointing to the right: Duplicate (using "Copy/Paste") two more left-facing and right-facing arrows.
Vijeo
Vij...
Designer
Project
Var...
Too...
September 2003
63
Creating a project
Step 10
Action Place the seven arrows created in steps 3 to 9 in the rectangles as shown in the figure below:
Note: You can drag any of these arrows or rectangles to increase or reduce their size.. 11 Select all the arrows. Select "Group" in the pull-down "Arrange" menu to create a group object.
Designer Vijeo
Designer Vijeo
Manual_V41 Target1
Rotate Left Rotate Right Flip Panels Graphical Horizontal Flip Vertical 1: Panel
Note: To select several objects at once, press and hold down the "Shift" key while selecting the objets.
64
Vijeo
Vij...
Designer
Project
Var...
Too...
September 2003
Creating a project
Step 12
icon to the
right of "Animation" in the "Inspector" window in order to open the "Animation Properties" window, and then click the "Visib." tab. Enter the following settings:
Animation Properties Color Size Position Rotate Touch Visib. Smart Part
OK
Cancel
Apply
September 2003
65
Creating a project
Next
Procedure
66
September 2003
Creating a project
2.4
At a Glance
Purpose of this subchapter What's in this Section?
This subchapter describes the procedure to create the third "Water level data chart" screen. This section contains the following topics:
Topic Creating the "Water level data chart" screen Creating a chart Creating a navigation button Creating a script Page 71 68 73 74
September 2003
67
Creating a project
Creating a chart
Procedure Here we will create a chart that will show the water level changes in the tank. The following table describes the procedure to create a chart:
Step 1 Action Click the "Chart" icon and then draw a chart on the 3:Chart screen.
68
September 2003
Creating a project
Step 2
Action In the "Inspector" window, enter the following settings: l "PlateColor" = sky blue (102,255,255). l "BorderColor" = green (0,153,0). l Click "+" to the left of "DataAxisLabel" and set the TextColor to "orange (255,102,0)". l Click "+" to the left of "Channel1" and enter the "sec" variable.
Inspector
TrendGraph Width Height Description PlateColor BorderColor GraphSettings RangeSettings ValueRange... ValueRangeTo... DisplayRangeMin DisplayRangeMax DataAxisLabel TextColor FontHeight FontWidth Decimals Spacing DataAxisScale DataAxisGridLine TimeAxisScale TimeAxisGridLine Channel1 Variable DisplayFormat Color Track Mark OutOfRangeColor 16 8 0 1 Enabled Enabled Enabled Enabled Enabled Sec Line Disabled Disabled Disabled 0 100 0 100 Enabled (255,102,0) 300 240 (102,255,255) (0,153,0)
September 2003
69
Creating a project
Step 3
Action Click the "Variables" tab in the "Inspector" window. Select the "sec" variable and set the "RecordRate [sec]" field to "1".
Vijeo
Vij...
Designer
Pro...
Variables
Too..
Inspector
Variable Name Description ArrayDimension DataType Source KeepHistory NumberOfDays RecordRate [sec] DataDetails Alarm Disabled 0 Integer Internal Enabled 1 1 sec
70
September 2003
Creating a project
Back
September 2003
71
Creating a project
As specified above, the title of this screen is: "Water level data chart (History)". The following table describes the procedure to create the title:
Step 1 Action Select the Toolbar's "Text" icon and draw an area on the screen where the text will be placed.
Graphical Editor
OK
Cancel
72
September 2003
Creating a project
"Text Editor" dialog box and set up each field as shown below:
Text Editor Language: Font: Font Style: Language1 Vijeo Sans Serif Normal Font Width: 8 Font Height: 16
Back
OK
Cancel
September 2003
73
Creating a project
Creating a script
At a Glance In Vijeo Designer, a script can be used to automate some tasks of a communication program. You can use a script to define a procedure that runs when a condition is met. You can then add a function that is not available in a drawing's properties.
74
September 2003
Creating a project
The following script is run when a predefined value is entered in screen 1. If that value is over 100, the alarm popup window is displayed (See Creating an alarm display popup window, p. 46). The following table describes the procedure to create the "Over_100" script:
Step 1 Action Click the "Project" tab in the "Navigator" window, then right-click "1:Configuration" and select "New script":
Designer Vijeo
Designer Vijeo
Designer Vijeo
Manual_V41 Target1 Graphical Panels 1: Panel1 Open In New Window Rename Panel Report... Application Scripts Cut Panel AlarmsCopy Panel Popup Delete Panel... Windows New Script Paste Script Languages Properties Data Files IO Manager
Vijeo Designer
Vijeo...
Project
Var...
Tool...
l Enter "Conditional" in the "Trigger" field. l Enter "value" in the "Trigger Variable" field. l Enter "On Data Change" in the "Trigger Condition" field. l Rename "Script 1" as "Over_100".
September 2003
75
Creating a project
Step 3
Action Click "Over_100" to open the script editor window and enter the following program: int a; a = value.getIntValue(); if (a>100){ alarm.write(1); AlarmWindow.open((short)10,(short)400); AlarmWindow.changePanel(10001); AlarmWindow.show(true); } else { alarm.write(0); } Note: When the value of the "value" variable is over 100, the bit corresponding to the "alarm" variable becomes TRUE and the "Alarm display" (See Creating an alarm display popup window, p. 46) screen is displayed. If the "value" variable's value is less than or equal to 100, the bit corresponding to the variable is FALSE.
76
September 2003
Creating a project
The following table presents the procedure to create the "Refresh_per_sec" script.
Step 1 Action Repeat step 1 of the "Create the Over_100 script" procedure. Click the "Project" tab in the "Navigator" window, then right-click "3:Chart" and select "New script": Select "Periodic" in the "Trigger" field and "1000" as the "Frequency":
Inspector
Panel Script Name Trigger Frequency [msec] Refresh_per_sec Periodic 1 000
3 4
Rename "Script 2" as "Refresh_per_sec". Click "Refresh_per_sec" to open the script editor window and enter the following program: sec.write(_Seconds.getIntValue()); Note: The value of the "_Seconds" system variable is assigned to the "sec" variable. Save your project.
September 2003
77
Creating a project
78
September 2003
Project Download
3
At a Glance
Purpose of this chapter What's in this Chapter? This chapter describes the different project build types and the various Project download modes. This chapter contains the following topics:
Topic Validation / Building / Correcting errors Simulation Downloading data and exiting a project Page 80 82 83
September 2003
79
Project Download
Local simulation Data produced by the built project* are stored locally for simulating the customer application during its fine-tuning phase.
* Data created using the "Build" function. Validating the target The project is validated using the main menu's "Build" command and then selecting "Validate all".
"Building" consists in building a program that can be run directly by the XBT-G from the project created with the Vijeo Designer graphical editor. Be sureto clean each target and/or project before you build. This is performed by choosing the main menu's "Build" command and selecting "Clean All". The clean command removes unnecessary files from the project folder. Choose the main menu's "Build" command and selecting "Build All" to build your target. Vijeo Designer can build a program in the following four ways:
Type Build Quick Build Start simulation Download Procedure Rebuilds the project completely and optimizes the results file. Although creation is quicker than when using the "Build" function. Only builds the data updated since the previous version was built, and optimizes the results file. Rebuilds the project completely and refreshes the resulting file. After the build the simulation starts. Before download, the target is validated and built. If no errors are detected, the user application files are transferred to the target machine.
80
September 2003
Project Download
Error correction
In each of the above four cases, the system displays "Errors" and "Warnings" in the "Feedback zone". In each case the "Feedback zone" window is automatically opens and "Errors" and "Warnings" are displayed. "Errors" are displayed in red and "Warnings" are displayed in yellow. When there are no errors or warnings, the result is displayed in green. Double-click an error or "warning" to view detailed information.
September 2003
81
Project Download
Simulation
Simulate your project Start Simulation The simulation function can be used to simulate your project on the PC, i.e. to display your project without downloading it to an XBT-G terminal. Use the following procedure to start the simulation:
Step 1 2 3 4 Action Click the "Project" tab in the "Navigator" window. Right-click "Target 1". Select "Start Simulation (Build)" to begin the simulation. After the build is completed, the main screen will appear. To stop the simulation, press the "Ctrl" and "Z" keys simultaneously or "Alt" and "F4" keys simultaneously.
82
September 2003
Project Download
September 2003
83
Project Download
Download procedure
2 3
If you select Ethernet as your download method, be sure to enter the following data. l IPAddress l SubnetMask l DefaultGateway If you select Serial as your download method, be sure to enter the following data. l COM Port l Baud Rate In the "Navigator" click on "Target1" then click right to select "Download".
84
September 2003
Project Download
Step 6
Action Check your XBT-G unit to see if the application is displayed correctly. Note: If an error message appears in the "Feedback zone", this means that the download has failed. After you have solved the problem try to download data again. If you double-click on an error displayed in the "Feedback zone", the error's position is indicated.
To exit Vijeo Designer, select "Exit" from the main menu bar's "File" menu and save your project.
September 2003
85
Project Download
86
September 2003
Index
B C
Graphic screen, 37 Graphical panel, 11 Graphical screen, 57, 59, 63
A
Animation, 59, 63
B
Blinking lamp, 41 Building, 82 Button, 45, 68
H
HMI, 10
I C
Conduit, 63 Configuration, 29 Connection, 11 Create a graphic, 70 Installation, 17
L
Level indicator, 59
D
Data transfer, 82 Download, 85
M
Multi-language, 11
R E
Edit variables, 11 Ethernet, 82 Report, 11 Re-use the data, 11
S G
Generation, 82 Graduated scale, 59 Graphic, 70
September 2003
87
Index
T
Tank, 59 Target devices, 12
U
Uninstall, 20
V
Variables, 32, 63
88
September 2003