Proposed Residence for Mr.

Shammer at Salem

Specification:
Construction as per plan enclosed with this agreement. The cost of further alteration and destruction is extra. If the Cost of Cement and/or Steel get increased then the cost for construction will be added to actual rate quoted in this agreement.

Mason Work:
All mason work such as Brickwork, all R.C.C works required for the construction, (Lintel concrete, Sunshade, Roof (10), Loft, Etc.,) Ceiling plastering, Wall plastering, Weathering course, Staircase arrangements etc., complete. All measurements and specifications are as per plan.

Centering Work:
All Centering works required for the construction using steel shutters, casilona posts and wooden planks as per standard specification.

Steel Fabrication Work:


All Steel Fabrication required as per standard specification.

Carpenter Work:
Making and fixing of all Door Frames, Windows, Window leafs, Ventilators with specified wood and fixing of specified doors, Glasses, Locking arrangements etc., complete.

Electrification, Water supply and Sanitary Arrangements:


Providing points at required spaces (as per plan). Outlet from overhead tank to required spaces, and required number of lines, with specified materials. Necessary sanitary lines, Inspection chambers at required spaces, fixing closets, gully traps, rain water line, and other extra works required as per plan.

Painting Work:
White washing one coat for ceiling, inside and outside walls. All doors, windows and window grills should be painted with two coats of synthetic enamel paint over one coat of primer with patty finishing. If any other polishing work required for other accessories, will be at extra cost.

Flooring:
Flooring finishing with Hydraulic Pressed Tiles using Cement Mortar (CM) 1:8 mix. CM 1:4 mix flooring for open terrace and portico top area.

Wall Tiles Work:


7 height at toilet walls and 3 height at kitchen wall over platform should be provided with specified tiles.

Mix Proportions:
Brick Work Ceiling Plastering Plastering R.C.C Work Laying Mosaic Tiles Wall Tiles Open Terrace Flooring 1:6 mix 1:3 mix 1:4 mix 1:2:4 mix 1:8 mix 1:6 mix 1:4 mix 1 bag of cement & 30 trays of sand 1 bag of cement & 15 trays of sand 1 bag of cement & 20 trays of sand 1 bag of cement, 10 trays of sand and 14 trays of 20 mm metal 1 bag of cement & 40 trays of sand 1 bag of cement & 20 trays of sand 1 bag of cement & 20 trays of sand

Reinforcement Details:
Lintel Beam 4 Nos. of 8 mm dia 6 mm dia stirrups @ 7 c/c Lofts and Sunshades Main rods 8 mm dia @ 7 c/c Distributers 6 mm dia @ 7 c/c Roof Slab Main rods 8 mm dia @ 7 c/c Distributers 8 mm dia @ 7 c/c Staircase Main rods 10 mm dia @ 6 c/c Distributors 6 mm dia @ 6 c/c Beam Main rods 4 no.s of 12 mm dia Distributors 8 mm dia @ 7 c/c Column Main rods 6 no.s of 12 mm dia Distributors 8 mm dia @ 7 c/c

Materials to be used:

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16.

Sand Cement Steel Bricks 20 mm metal Wood Window Grills Tiles PVC Pipes Wires Switches Closets Locking arrangements Doors Glass Paint

Karur Sand Ultratech, Chettinad TMT

Pillai marudhu, Sal Square rods with appropriate designs Asian, Bonzer 7, Kajaria 15 gauge 1st quality pipes (ISI) Kundan Kundan, Anchor Parry ware Lock, Aluminium Tower bolts, Aluminium handle and oxidized hinges Flush Doors, Pre Laminated doors for Bed rooms 3 mm IAG Pinned glass Janatha cem, Dulex or Asian Enamel

Area Calculation:
Outer Roof Measurement, Staircase measurement, Water Tank, Low Roof area, Balcony and other projections beyond 2. Summary: Ground floor area First Floor area Second floor area Terrace Floor Head room (Excluding Water Tank) Total Area Cost per Sq. ft Rs. 1350/Total Amount Rs. 38, 31, 300/1001 sq. ft 1037 sq. ft 700 sq. ft 100 sq. ft 2838 sq. ft

PAYMENT SCHEDULE:
1. 2. 3. 4. 5. 6. 7. 8. Advance Basement Level FF Roof SF Roof Inner Plastering Outer Plastering Final Completion Completion in all aspects 25% 10% 15% 15% 10% 10% 10% 5% Total Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. 9, 57, 825 /3, 83, 130 /5, 74, 695 /5, 74, 695 /3, 83, 130 /3, 83, 130 /3, 83, 130 /1, 91, 565 /-

Rs. 38, 31, 300 /-

Other conditions 1. Store room, water, electricity should be arranged by the building owner. 2. Curing should be done by the contractor. 3. Electrical and plumbing fittings will be at extra cost (Fan, light & Taps) 4. Kitchen platform, inside wall putty, Elevation work will be at extra cost.