You are on page 1of 2

Fiscal Year 2011/12 Project Report Project Name Hewa Khola Lower Piluwa Gamgad small hydropower project

Dhalkebar-Muzaffarpur double circuit transmission line Power Capacity(kW) 4455 kW 990 kW 400 kW 400 kV Remarks completed completed completed Cross-border interconnection between Nepal and India. Necessary ground works are now in place for taking off the implementation. Expected to be in operation by 2014

Rasuwagadhi HydroelectricProject Middle Bhotekoshi Hydroelectric Project Upper Sanjen Hydroelectric Project Sanjen Hydroelectric Project Upper Modi Hydropower Project Upper Trishuli Hydropower Project Hetaunda-Bharatpur Transmission Line Bhotekoshi Hydropower Project Kulekhani-3 Hydroelectric Project Chameliya Hydrolectric Project

111MW 102MW 14.8 MW 42.5 MW 47 MW 60 MW 220 kV 9 MW 14 MW 30 MW NEA and K-Water(S.Korea) with 20% NEA share ownership

Upper Trishuli 3A

60 MW

The Khimti Dhalkebar Double Circuit Transmission line Project

220 kV

Hetauda- Bharatpur Bardghat transmission line Syangja substation

220 kV 132 kV

Completion date September 13,2014 tunnel breakthrough on 12th May, 2012 Overall progress of civil works is 75% Construction of major works of the Project is to commence only after the issuance of Work Order by the Consultant. 95 % work completed the completion of the project is hampered due to obstructions created by local residents regarding the right of way issue Work is underway Almost complete and expected to be commissioned soon

Fiscal Year 2011/12 Project Report Dumre-Damauli-Marsyangdi 132kV transmission line Singati-Lamosangu 132kV transmission line Kabeli 132 kV transmission line Chapali 132 kV substation Pathlaiya 132 kV substation Matatirtha 132 kV substation extension Second circuit stringing of Butwal KohalpurMahendranagar 132 kV transmission line Second circuit stringing of Hetauda Kulekhani-II Siuchatar 132 kV transmission line Hetauda Dhalkebar Duhabi 400 kV transmission line project Upper Tamakoshi Hydro Power Company Limited (UTKHPL) 132 kV 132 kV 132 kV 132 kV 132 kV 132 kV 132 kV Substantial Progress Substantial Progress Substantial Progress Substantial Progress Substantial Progress Substantial Progress Substantial Progress

132 kV

Substantial Progress

400 kV 456 MW

Tanahu Hydropower Project

140 MW

Upper Trishuli 3B Hydroelectric Project

37 MW

Cross border power exchange with India NEA with 41% stake A Project Of National Pride Construction Works ongoing at full swing The detailed engineering study of the project is in the final stage of completion. Construction could begin by mid 2013 Under development

You might also like