INTRODUCTION

Managing the Licking County Road System (on a 2006 Budget)

WILLIAM C. LOZIER P.E, P.S. County Engineer

20 S. Second Street Newark, Ohio 43055 740-670-5280

LICKING COUNTY FACTS


Land Area: 688 SQ. MI. 3RD Largest Population: 166,000 17TH Largest 421 C/L Miles 419 Bridges 3,400 Culverts 8900 Signs 10 Railroad Crossings Current Employees: 43 (was 59 last year) 25 Townships

ENGINEERS RESPONSIBILITIES
Public Safety Road Maintenance Bridges on County (45%) and Township Roads (55%) Right Of Way Maintenance (ROW) Snow & Ice Removal Signs & Traffic Control Survey & Legal Description Approval County Petitioned Ditches & Clean Water Act Engineering & Surveying Support for Townships

OUTLINE OF FUNDING DISCUSSION

System Conditions

Bridges Pavements General maintenance

Local Revenue/Budgeting Grant Funding Operational Efficiencies Summary

BRIDGE CONDITIONS

BRIDGES
BRIDGE CONDITIONS (79 bridges in poor condition) Orphan Bridges Condition Trends Load Reduced Bridges Bridge Replacement Program

BRIDGE CONDITIONS
Refugee Rd.- Etna Twp. 45% Load reduction To be replaced 2013

BRIDGE CONDITIONS
Hofacker Rd. Perry Twp. 75% Load Reduction to be replaced 2013

BRIDGE CONDITIONS
Martinsburg Rd. Washington Twp. Replaced

BRIDGE CONDITIONS
Stone Quarry Rd. McKean Twp. Closed for Replacement

BRIDGE CONDITIONS
York Rd. Saint Albans Twp. 25% Load Reduction To be repaired 2013

ORPHAN BRIDGES

BRIDGES
Bridge Conditions ORPHAN BRIDGES Condition Trends Load Reduced Bridges Bridge Replacement Program

ORPHAN BRIDGES

2012 February = 2013 March =

Number of Bridges 10 < L < 20 ft L > 20 ft. 86 249 167 252 ORPHANS =

TOTAL 335 419 84

Subdivision Additions Large Corrugated Pipes Skewed Structures Multi-Barrel Structures

ORPHAN BRIDGES

ORPHAN BRIDGES

ORPHAN BRIDGES

ORPHAN BRIDGES

BRIDGE CONDITION TRENDS

BRIDGES
Bridge Conditions Orphan Bridges CONDITION TRENDS Load Reduced Bridges Bridge Replacement Program

BRIDGE CONDITION TRENDS


Bridges with General Appraisals of 4 and Less
100 90 80 70
2's 3's 4's Total

60 50 40 30 20 10 0

LOAD REDUCED BRIDGES

BRIDGES
Bridge Conditions Orphan Bridges Condition Trends LOAD REDUCED BRIDGES Bridge Replacement Program

LOAD REDUCED BRIDGES


Bridges with Legal Load Reductions
45 40 35 30 25 20 15 10 5 0 2007 2008 2009 2010 2011 2012
8 8 10

Load Rating Program Calc. of Safe Live Load Capacity Inspection Conditions Impacts on Commerce / Shipping / Hauling
17

39

16

BRIDGE REPLACEMENT PROGRAM

BRIDGES
Bridge Conditions Orphan Bridges Condition Trends Load Reduced Bridges BRIDGE REPLACEMENT PROGRAM

BRIDGE REPLACEMENT PROGRAM


Responsible Use of Bridge Funds
The use of grant programs (credit bridge, OPWC) allows us to

leverage our bridge replacement funds 2 to 1 over the next 6 years.

The next 6 years we have $6,941,250 worth of bridge

replacement projects planned and the countys portion is $3,127,876.


6 YEAR PLAN REPLACES 46 BRIDGES, BUT 48 BRIDGES

BECOME DEFICIENT

BRIDGE REPLACEMENT PROGRAM


The Problem
6 yr. bridge program replaces 46 bridges, but 48 bridges become deficient 39 load reduced replacement cost $4,820.483 79 deficient bridges replacement cost of $9,726.705

Even with grant funding Not able to make progress towards the backlog of deficient bridges Need to replace 17 bridges a year for 10 years to catch up Currently only able to do 7 per year

OUTLINE OF FUNDING DISCUSSION

PAVEMENTS

PAVEMENT CONDITIONS
PAVEMENT CONDITION RATINGS (0-30 SCALE) 30.0 25.0 20.0 15.0 10.0 5.0 0.0 24.3 20.4 17.6 24.6 22.2 21.8

PAVEMENT CONDITIONS
MILES OF ASPHALT PAVEMENT
60

50

40

30

ASPHALT PROPOSED ASPHALT

20

10

PAVEMENT CONDITIONS
AVERAGE COST OF ASPHALT PER TON
$70.00

$60.00

$50.00

$40.00 AVERAGE COST PER TON

$30.00

$20.00

$10.00

$0.00

Pavement Conditions

80 70 60 50 40 30 20 10 0

MILES OF CHIP SEAL

CHIP SEAL PROPOSED CHIP SEAL

OUTLINE OF FUNDING DISCUSSION

MAINTENANCE

Maintenance
Geographically organized due to land area MMS developed with 300K HSIP grant through CEAO

MAINTENANCE MANAGEMENT SYSTEM

MAINTENANCE MANAGEMENT SYSTEM


Guardrail Deficiencies
SE 12% NW 24% NE 16%

Sign Deficiencies
SE 18% NW 18% NE 24%

Sign Support Deficiencies


NW 31% NE 8% CN 8% SW 53%

SW 36%

SW 37% CN 3%

CN 12%

Roadside Hazards
SE 11% NW 15% SW 27%

No Passing Zone Deficiencies


SE 21% NW 18% SW 32%

Curve Safe Speed Signing Deficiencies


SW 14% SE 46% CN 14% NE 23%

NE 29%

CN 18% NE 18%

CN 11% NW 3%

MAINTENANCE MANAGEMENT SYSTEM

MAINTENANCE MANAGEMENT SYSTEM

OUTLINE OF FUNDING DISCUSSION

MOTOR VEHICLE & GAS TAX REVENUE

ENGINEER OFFICE REVENUE

$7,000,000.00 $6,000,000.00 $5,000,000.00 $4,000,000.00 $3,000,000.00 $2,000,000.00 $1,000,000.00 $2006 2007 2008 2009 2010 2011 2012 Reimbursements & Refunds Permissive Tax Fines Gas Tax Motor Vehicle Tax

2006

2007

2008

2009

2010

2011

2012

Motor Vehicle Tax Gas Tax Fines Permissive Tax Reimbursements Total

$ 3,816,604.47 $ 2,431,438.73 $ 399,192.97 $ 421,354.10 $ 104,357.05

$ 3,772,979.63 $ 2,396,839.15 $ 414,258.67 $ 426,460.44 $ 76,207.95

$ 3,706,881.01 $ 2,547,125.41 $ 377,524.13 $ 423,250.89 $ 116,899.02 $ 7,171,680.46

$ 3,591,820.38 $ 2,202,007.52 $ 235,434.72 $ 426,786.74 $ 458,931.95 $ 6,914,981.31

$ 3,661,848.51 $ 2,368,958.14 $ 244,999.81 $ 438,616.44 $ 36,467.10 $ 6,750,890.00

$ 3,671,802.82 $ 2,299,276.49 $ 285,969.67 $ 436,407.60 $ 82,082.64 $ 6,775,539.22

$ 3,725,542.98 $ 2,309,182.25 $ 234,275.70 $ 441,669.33 $ 48,481.67 $ 6,759,151.93

$7,172,947.32 $ 7,086,745.84

BUDGET REALITIES
LICKING COUNTY ENGINEER OFFICE OPERATING BUDGET
2012 2013
WAGES / BENEFITS EQUIP / FACILITIES ROAD SALT FUEL MATERIALS CONTRACT BRIDGE CONTRACT PAVE MISC RETIREMENT BUYOUT PROFESSIONAL SERVICES TOTAL(includes previous year carryover) $4,144,750 $447,000 $280,000 $380,000 $800,000 $300,000 $365,000 $174,147 $0 $295,000 $7,185,897 57.7% 6.2% 3.9% 5.3% 11.1% 4.2% 5.1% 2.4% 0.0% 4.1% 100.0% $3,615,000 $461,500 $280,000 $380,000 $956,000 $425,000 $425,000 $101,698 $405,000 $230,000 $7,361,198 49.1% 6.3% 3.8% 5.2% 13.0% 6.8% 4.8% 1.4% 5.5% 4.2% 100.0%

OUTLINE OF FUNDING DISCUSSION

DEFERRED MAINTENANCE

MAGNITUDE OF PROBLEM
Number of Licking County Bridge Load Reductions by Year
50 40 30 20 10 0

39

17 16 2012 Bridge Replacements: 8 10 8 8 Break even goal: 8 bridges/year (419 50 yr service life 8.4/yr) 10 Year catch up goal: 9 bridges /year 78 deficient bridges 10 8 bridges/year 10 YEAR BRIDGE NEEDS: 17.4/YEAR OR ADDITIONAL 1M/YR
3007 2008 2009 2010 2011

2012

MAGNITUDE OF PROBLEM
60.00 Miles of Pavement

2012 Asphalt Resurfacing: 13.57 Mi 20.00 Break Even Goal: 40 Miles 0.00 (280 miles, 7 year service life) 5 Year Catch Up Goal: 65 Miles/Year ($3.1 M annual shortfall) 2012 Chip Seal: 31.67 Mi. Break Even Goal: 50 Miles 80.00 (140 miles, 3 year service life) 60.00 3 Year Catch Up Goal: 75 Miles/Year 40.00 ($500K annual shortfall) 20.00 Other deferred Maintenance 0.00 BTW, Lic Co = no. 3 statewide in run off the road crashes TOTAL SHORTFALL: $ 4.6 M/YEAR

40.00

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

Miles of Chip Seal

2012

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

MAGNITUDE OF PROBLEM
Additional Yearly Revenue Needs Bridge Needs 1M Pavement Needs $3.1M Other Deferred Maintenance 500K Safety Improvements (Costs undefined) No 3 Statewide Run Off The Road Crashes (Costs undefined)

TOTAL SHORTFALL: $4.6M/ YEAR

MAGNITUDE OF PROBLEM

7 Contiguous Counties

MAGNITUDE OF PROBLEM
100 90 80 70 60 50 40 30 20 10 0
8/376 13/341 11/353 5/164 43/280 78/419 66/299 75/414

No. of Bridges with a GA 4 and less /Total No. of Bridges


Licking County Coshocton County Delaware County Fairfield County Franklin County Knox County Muskingum County Perry County

MAGNITUDE OF PROBLEM

100 90 80 70 60 50 40 30 20 10 0 1 0 46 39 31 53

No. of Bridges Currently Load Reduced

93

Licking County Coshocton County Delaware County Fairfield County Franklin County Knox County Muskingum County Perry County 18

MAGNITUDE OF PROBLEM

Percent of Bridges with GA Rating of 4 and less with County Permissive shown

25.0% 20.0% 15.0% 10.0% 5.0%


$5 $10

22.1% 19.1% 15.4% 18.2%

Licking County Coshocton County Delaware County Fairfield County Franklin County Knox County Muskingum County Perry County

4.8%
$10*

3.8% 3.1%
$10 ** $15 $15 $5

3.0%
$5

0.0%

*Delaware County also has sales tax for road and bridges

Amount Shown indicates County Permissive Tax

**Fairfield Co. also has road bridge levy

OUTLINE OF FUNDING DISCUSSION

Grant Funding

STRETCHING THE DOLLARS-OPWC


Ohio Public Works Commission (OPWC) Statewide Allocation 2013 SCIP: $132M ($26.4 M Loan, $105.6M Grants) LTIP: $55M Total: $187M OPWC District 17 (Lic,Fai,Mor,Kno,Del,Pic Counties) 2013 Allocation SCIP: $6.9M ($1.4M Loan, $5.5M Grant) LTIP: $2.9M Total: $9.8M OPWC Licking County Allocation 2011 grant: $1.9M County Engineer: $589,000 (31% of total) Brownsville Road Bridge (CR 668) Duncan Plains Road Bridge (CR 33) 2012 grant: $2.1M (24% of total)

County Engineer: $494,395 Loches Road 3 Bridges, 5 miles resurfacing (CR 202)

STRETCHING THE DOLLARS- FED FUNDS


Federal-Aid ongoing ($5,300,231) York Road Truss Bridge (95/5 funding split with Credit bridge funds. 350K Consulting fees) Credit Bridge Program (future of OTC?) Staddens Bridge Road Bridge (est. 45k consulting fees) Seven Hills Road Bridge (Design-build still est 30k consulting fees) Guardrail (including 19 Township and County Road Bridge ends-free!) Bridge Load Rating (free consulting!) 5 rounds, 10 consultants, 103 bridges, $706,040 Total (FREE MONEY!!) Pavement Marking (free!)-3 contracts, 900K Martinsburg Road Resurfacing(in-house design)- 850K Sign Sheeting (90/10 funding split)-3 contracts, 150K Blacks Road Intersection Improvement (HRRR program, consultant task order all project costs consulting, r/w, construction 90/10 federal/local!) Northridge Road widening (not so successful-PUNT!)

PAVEMENT MARKINGS
Thermoplastic Striping 49 MILES EDGE/CENTERLINE (free money!)

GUARDRAIL IMPROVEMENTS
Bridge End Treatments free money!
BEFORE AFTER

GUARDRAIL IMPROVEMENTS
Guardrail End Treatment Upgrades free money!

SIGN REPLACEMENTS
HSIP Sign Upgrade Projects- only 20% local share!
Improved Reflectivity & Visibility

OUTLINE OF FUNDING DISCUSSION

Controlling Operating Costs

STRETCHING THE DOLLARS


County General Funds ($395,000) Re-surfaced Sportsman Club Road with GRF in 2012 Operational Savings ($651,535/Year) Retirement Buyout (reduced employees from 59 to 43, or 27%) More than 80 employees during the 1980s Reduced snow routes from 25 to 22 Use pure salt for snow and information technology to improve snow and ice control Lease equipment? Greater use of pre-fabricated bridge elements Maintenance management system (300K consulting grant thru CEAO) Property surveys online

SUMMARY

Licking County Road System Conditions are worsening 78 deficient bridges(20% of total) 39 bridges with legal load reductions (10% of total) 156 miles behind in paving operations Other deferred maintenance Revenue is decreasing while construction inflation is increasing In 2006 Revenue was 7.2 M In 2012 revenue was 6.8M In 2005 Lic Co paid less than $29/ton for asphalt and $60/ton in 2012 Per CEAO since 2003 the costs for hotmix asphalt in place has risen from $27/ ton, to $74/ ton, a 270% increase; Redi-mix concrete has seen a 70% increase along with a 214% rise in reinforcing steel costs. Additional Yearly Revenue Needs Bridge Needs 1M Pavement Needs $3.1M Other Deferred Maintenance 500K Safety Improvements (Costs undefined) No. 3 Statewide Run Off The Road Crashes (Costs undefined) TOTAL SHORTFALL: $4.6M/ YEAR Solutions Continue operational efficiencies $5.3M in programmed federal funds Leveraging OPWC Township funds for bridge construction Additional Revenue

Questions/comments

10 YEAR SUMMARY OF REVENUE NEEDS AND SHORTFALL SCENARIOS ANNUAL PROGRAM NEEDS WITH 850K EXISTING FUNDING LEVEL ADDITIONAL REVENUE EXISTING FUNDING WITH 650K OPERATIONAL AND 650K LEVELS/SHORTFALL SAVINGS/SHORTFALL OPERATIONAL SAVINGS/SHORTFALL

Questions/comments

65 MILES ASPHALT PAVING (3.5M)

9 MILES - 425K/3.1M

15 MILES - 800K/2.7M

25 MILES - 1.3M/2.2M

17 BRIDGE REPLACEMENTS (1.4M + 400K GRANTS)

8 BRIDGES - 425K+ 400K GRANTS/1M

10 BRIDGES -600K+ 400K GRANTS/800K

12 BRIDGES - 800K+ 400K GRANTS/600K

MATERIALS (CHIPSEAL,PATCHING, BRIDGE REPAIRS) -1.4M

900 K/500K

1.0M/400K

1.1M/300K

PROGRAM TOTALS/SHORTFALL

2.2 M/4.6M

2.8M/4.0M

3.6M/3.1M