Introduction
Electric power generation with steam at the individual household level is making a comeback. Basic source of steam power generation is steam as the name implies but where to get it the prime objective that has to full fill in my allocated project . Basically here the project is leading to cyclic process that is production of steam will be obtained through waste gases from own plant expelled .
Briefings
Starting with the working & Principles as defined earlier plant will supply 17MW electric generation that is sufficient to run a single plant . Efficient way of production because there is no issue of Main power obtaining from water & power development authority. Saves electric utility sinking with wapda and consumes more power from steam power Grid station .
Room for machinery required for setting up steam turbine ,generators ,condensers etc and 30 canals land requirement is proceeded. Land requirement for Central control room requirement of 5 canals for central rooms including engineering station & operating station . Water development & storage cottage should be there so a vital need of land for water site so 10 canals land for this purpose will take the part.
Threats
High oil prices, growing concerns over energy security, and the threat of climate change have all stimulated investment in the development of alternatives to conventional oil. Lack of water resources is the basic problem everywhere The environmental impact of electricity.
Threats
Scalability and Timing construction of equipment and manufacturing processes for its production, output grows in a stepwise function only as new capacity comes online. Capacity factor One indication of intermittency challenges in electric power generation is the capacity factor, or the average percentage of time in a year that a power plant is producing at full rated capacity
Name Turbine Generators Motors Boilers Transformers(CTs & PTs) Automation equipments Condensers
Turbine is very first part of power generation machinery On the wings of turbine steam falls & in turn rotates . Cost varies with rpm(revolution per minute ) and power generated per kilo hour Generator converts mechanical energy into electrical energy . Possible sources of mechanical energy include steam engines, water falling through a turbine or waterwheel, an internal combustion engine, a hand crank.
Human resources
Those people who actually manages and operates the whole plant. Depending upon their designation organization has to pay salary to all of them. Engineers in engineering station in CCR and operators in operating station in CCR ,most of staff will be required for these stations.
Conclusion
Conclusion The steam power plant is efficient in providing power. It works on cyclic process. Through this plant we can increase the annual production and can get rid of extra charges of water and power development authority .