You are on page 1of 1

Iruttukanam

powerhouse

Existing
SHP Project
4.5 MW
Turb 1

Turb 2

Turb 3
Outlet

Chainage
0.00 6.00
8.00 6.00
8.50 6.00
24.00 5.50
37.00 3.90
47.00 6.00
60.00 5.00
73.00 14.00
92.00 24.00

Width (Mtrs) Bed level


Remarks
577.15
C/L of 3rd unit TRC
577.10
TRC concrete Top
576.63
TRC concrete bottom

570.1 River Bank of confluence,


bed level of TRC thodu