You are on page 1of 2

DO NOT FORGET TO CHECK FOLLOWING Daily Log Sheet Site: Site: visited: Area Area visited: Month: Month:

Items Checked Daily: Date: Date: 16 1 17 2 18 3 19 4 Daily Log Sheet Job No. Job No.Name of SOH/Engineer/Officer/Supervisor: SOH/Engineer/Officer/Supervisor: 20 Name 21 of 22 23 24 25 26 27 28 29 5 6 7 8 9 10 11 12 13 14 30 15 31 Remarks:

Remarks:

Items Checked Daily:( Safety shoes, Helmet, Full 1 PPE adherence body harness safety belt) 1 PPE adherence ( Safety shoes, Helmet, Full body harness safety belt) 2 Training to workers 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 Training to workers Site lay out at entry points and Location of access roads Site lay out at entry points and Location of access roads Display of escape routes & Assembly point Display of escape routes & Assembly Adequacy of toilet facilities to point avoid traveling at site across working areas. Adequacy of toilet facilities to avoid traveling at site across Officer/Supervisor working areas. Deployment of Safety by contractors Deployment of Safety Officer/Supervisor by contractors Hard barricading & shoring near deep excavations. Hard barricading & shoring near deep excavations. areas where welding cutting Barricading work in on at height and possibility of falling Barricading areas where welding cutting objects or molten metal. work in on at height and possibility of falling objects or molten material. Restriction of moving of heavy machinery near edge of excavation. Restriction of moving of heavy machinery near edge of excavation. Proper Electrical connection. Provision of ELCBs of proper rating. Double earthing. Proper Electrical connection. Provision of ELCBs of proper Double earthing. Validity of Liftingrating. appliances/machinery Validity of in Lifting appliances/machinery No entry areas identified and caution board placed No entry in areas identified and caution board placed Site Security System

13

DO NOT FORGET TO CHECK FOLLOWING 13 Site Security System

You might also like