Professional Documents
Culture Documents
Invest in
THE COLUMNS
LEGAZPI VILLAGE
Excellent Location = Distinct
1 Lifestyle
Ortigas
(approx. 30 mins.)
Fort Bonifacio
(approx. 10 minutes)
Alabang
(approx. 45 minutes)
Offers all these
conveniences
OTHER
HOTELS
CHURCHES
SCHOOLS
HOSPITALS/
OTHER MAJOR
CLINICS
SPAS/FITNESS CENTER
LANDMARKS
Hotel
Ateneo
Makati Intercon,
MALLS/RESTOS/SHOPS
St. Andrew, Shrine
Business
Medical of
School,
Center,
Live
BUSINESS
The
Oakwood
AIM,the a
Spa (Bel-Air
Sacred
Colegio
Ayala
Ospital
Ayala
Gold’s
few
DISTRICTS
and
Premier,
San
Center,
Gym
RCBC),
Heart,
Agustin,
Avenue,
ng Makati,
at Rustan’s,
Glorietta
Bonifacio
Shangri-La
Sanctuario deGlobal
International San City, 3,
Makati,
Antonio,
School,
Fitness
DonThe steps from
Buendia
Makati
Theat
First
Makati
JGAvenue,
Medical
Landmark
Ortigas
Peninsula
Bosco,
Tower,
Summit
Manila,
Assumption
Assumption
Post
Bldg.,
Chapel,
College,
Makati Golf Office,
FortMed Club
everything
Mandarin
Greenbelt
Makati
San
Don
Fraser
Agustin
Philippine
Oriental,
Fire
Stock
Chapel,
Bosco
Station,
Place
Chapel
Exchange
2 Distinct Architecture
Giant Bamboo Artwork Exemplifies
Distinction
• Draws inspiration from nature and
contemporary Filipino artistic photography
City Club-like
Amenities:
3 The Recreational
Club
Property Portfolio:
Ferndale Homes ● One Roxas Triangle ● One Salcedo Place ● Pineridge ● The Asia Tower
● The Regency at Salcedo ● Three Salcedo Place ● Twin Towers ● Two Salcedo Place
6 Alliance with MDC
ACCOMPLISHED CONCRETE
ON GOING REBAR WORKS
POURING OF SLABS AND
INSTALLATION OF SLABS AND
BEAMS IN ZONE 2 @ 31ST FLOOR
BEAMS IN ZONE 1 @ 31ST FLOOR
ON GOING REBAR
AND FORM
WORKS
INSTALLATION
OF SLAB AND
BEAMS IN ZONE 3
@ BASEMENT
LEVEL 2 AREA 2
The Columns Legazpi Village
Architectural / MEPFS
The Columns Legazpi Village
Acotec Installation
ON-GOING
INSTALLATION
OF 140mm AND
100mm ACOTEC
PANELS IN ZONE
2 @ 11TH FLOOR
ON-GOING INSTALLATION OF
140mm AND 100mm ACOTEC
PANELS IN ZONE 1 @ 10TH
FLOOR
ON-GOING
INSTALLATION
OF 140mm AND
100mm ACOTEC
PANELS IN ZONE
2 @ 14TH
FLOOR
The Columns Legazpi Village
Fire Protection and Electrical Works
ACCOMPLISHED INSTALLATION OF
FIRE HOSE CABINET IN ZONE 2 @
9TH FLOOR
ON-GOING
INSTALLATION
OF FIRE
PROTECTION
PIPES AT 2ND
FLOOR
ON-GOING INSTALLATION
OF FIRE PROTECTION
PIPES IN ZONE 1 @ 3RD
FLOOR
ON-GOING INSTALLATION
OF CONDUIT PVC PIPES IN
ZONE 2 @ 10TH FLOOR
The Columns Legazpi Village
Fire Protection and Electrical Works
ON-GOING INSTALLATION OF
25mm dia. WATER LINE AND
CONDUIT PVC PIPES ON
NOTCH WALL IN ZONE 1 @
11TH FLOOR
ON GOING INSTALLATION OF
FIRE PROTECTION PIPES IN
ZONE 1 @ 12TH FLOOR
ON GOING
INSTALLATION
OF FIRE
PROTECTION
PIPES, AND
SANITARY PIPES
(T&Bs) IN ZONE 1
& ZONE 2 @ 12TH
FLOOR
The Columns Legazpi Village
Mechanical and Fire Protection Works
ON GOING
INSTALLATION
OF FIRE
PROTECTION
PIPES IN ZONE 2
ON GOING INSTALLATION OF @ 15TH FLOOR
AIR DUCTS IN NOTCH WALL 8
IN ZONE 2 (CURRENTLY @
25TH FLOOR)
Payment Terms
• Cash 30
• Cash 60
• Deferred 20-80
• Deferred 30-70
• Deferred 50-50
• Deferred 10-10-80 (12mos)
• In-House 10-90 Catch-up
Site Manager
• For inquiries, site tripping and sample
computation request, please contact: