So, how do governors with the steady-state speed characteristic interact when there are multiple generators in a power system?
What determines the steady state system frequency after a load is added to the system?
Multiple Generator Governor Response Consider an isolated power system with three generators on-line and operating at 60HZ. The load is 360 MW and the generator outputs for units #1, #2 and #3 are 80MW, 120MW and 160MW, respectively. A load of 21MW (P) is added. What frequency does the system settle at? How much does each unit pick-up (MW)? Since R(p.u.)=( f(HZ)/60)/( P(MW)/Capacity), then (P/f)=(1/R) X Capacity/60). UNIT CAPACITY R (DROOP) P/f #1 300MW 0.100 (10%) 50MW/HZ #2 450MW 0.075 (7.5%) 100MW/HZ #3 600MW 0.050 (5%) 200MW/HZ Solution: Unit #1: P1=50 X f P1=50 X 0.06=3MW Unit #2: P2=100 X f P2=100 X 0.06=6MW Unit #3: P3=200 X f P3=200 X 0.06=12MW Pi=350f=21MW, check: Pi=21MW and f=21/350=0.06HZ Frequency=60-0.06=59.94HZ
The system frequency reaches steadystate at a value that causes the sum of the on-line generator output MW to be equal to the system load MW. With this type of governor, when the system load increases, the system frequency decreases and visa versa. How do we control frequency to 60HZ, no matter what the load is?
How does the addition of the speed changer to the governor facilitate the control of frequency? Hint: The system frequency reaches steady-state at a value that causes the sum of the on-line generator output MW to be equal to the system load MW.
From a central site, you increase or decrease the 60HZ set-points until the sum of the 60HZ set-points is equal to the system load. Then the frequency will stabilize at 60HZ. This form of supplemental control is called Automatic Generation Control (AGC) and more specifically, Load Frequency Control (LFC).
Primary Control Governor Control/Response Holds the system together as load changes occur and also as un-commanded generation excursions occur Provides the correct amount of mechanical input to turbines to match the electrical output of the corresponding generators Frequency/rotational speed of the turbine Fast - Seconds Local within the Units/PGCsA QSE has no direct control over governor response. Having more governors on-line (with a given droop characteristic) will minimize the magnitude of frequency deviations Steady state speed characteristic (droop), governor dead-band, first stage boiler pressure (steam units) and head (hydro units) If there ever is a governor response market, there will probably be bids, awards and settlement, but the market will never deploy the governor response. Initial governor response (to point B) is over completely by the time units start receiving secondary control signals in response to the disturbance.
Secondary or Supplementary Control AGC Control/Response Shifts generation between units to achieve security and economic objectives plus restores frequency to the rated value. Changes the 60HZ governor set-points of the units to achieve scheduled values established by the market. In ERCOT, the SCE for the portfolio of units Slower - Tens of seconds and minutes Centralized from ERCOT to Units via QSEs Having more units being controlled by AGC will minimize the duration of frequency deviations Base power schedule plus deployments of balancing energy, regulation energy, responsive and non-spinning reserve. AGC dead-band, gains and frequency bias term. Bids, awards, deployments and settlement through the Ancillary Service Market. Performance monitoring of individual Services is approximate and complicated. There needs to be recognition of governor response and coordination between RRS and RegUp deployments to insure smooth , rapid and sustained frequency recovery.
Function-Technical