You are on page 1of 28

(AN ISO/TS 16949:2009 Co.

41/21-21-22, SITE-4, INDL. AREA SAHIBABAD , GHAZIABAD (UP) -201010 PHONE No.0120-2896926,3265914 FAX: 0120-2897522 E-MAIL : splgandhi@ yahoo.com

PRODUCTION PART APPROVAL PROCESS PART NAME: STAY SUCT . HOSE PART NO: 146542 - 833

CUSTOMER M/S .SUBROS LTD.

P P A P INDEX
PART NAME PART No. BRACKET Customer Name S# 01 PSW 02 DESIGN RECORD 03 ECN DOCUMENT 04 CUSTOMER ENGR APPROVAL 05 DESIGN FMEA 06 PFD 07 PROCESS FMEA 08 LAYOUT INSP. 09 MATERIAL TEST REPORT 10 QUALITY LAB. DOCUMENTS 11 INITIAL PROCESS STUDY 12 CONTROL PLAN 13 CHECKING AIDS 14 M.S.A(R&R) 15 BULK MATERIAL REQUIRED LIST 16 SAMPLE 17 MASTER SAMPLE 18 RECORD OF CUSTOMER COMP. 19 CUSTOMER SPECIFIC REQ. 20 QUALITY PLAN 21 WORK INSTRUCTION SHEET DESCRIPTION YES

STAY SUCT. HOSE 146542 - 833 M/S SUBROS LTD.


NO N/R REMARKS

PREPARED BY: KAPIL TOMAR

APPROVED BY: VINOD ARYA

STPL
Part Name : STAY SUCT. HOSE

PART SUBMISSION WARRANT


( F-09-01) Cust. Part Number 146542 - 833 Org. Part Number: 0 Nil Yes Dated Dated No Purchase Order No. Dated

ISSUE REVISION DATE

Shown on Drawng No. Engineering Change Level Additional Engineering Changes Safety and/or Government Regulation Checking Aid No.

Weight (Kg)

STPL/ SUB / CA/ 833 Checking Aid Engineering Change Level

29/06/2013

ORGANIZATION MANUFACTURING INFORMATION

Organization Name & Supplier/ Vendor Code SPECIAL TOOLS PVT. LTD. Street Address 41/20-21-22,Site-4, Inds. Area City Region Postal Code Country Application Shahibabad Ghaziabad 201010 India MATERIALS REPORTING Has Customer-required Substances of concern information been reported?. Submitted by IMDS or other customer format Are Polymeric parts identified with appropriate ISO marking codes? REASON FOR SUBMISSION o Initial Submission o Engineering Change(s) o Tooling Transfer , Reaplacement ,Refurbishment or additional o Correction of Discrepancy o Tooling inactive > than 1 year REQUESTED SUBMISSION LEVEL (Check one) :

CUSTOMER SUBMITTAL INFORMATION SUBROS Customer Name / Division MANESAR Buyer / Buyer Code

o Yes

o No

o Yes

o No

o Change to Optional Construction or Material o Supplier or Material Source Change o Change in Part Processing oParts Product at Additional Location o Other-Please Specify below

o Level 1 - Warrant only (and for designated appearance items, an Apperance Approval Report ) submitted to customer o Level 2 - Warrant with product samples and limited supporting data to customer. o Level 3 - Warrant with product samples and complete supporting data submitted to customer. o Level 4 - Warrant & other requirements as defined by customer o Level 5 - Warrant with product samples and complete supporting data reviewed at organizatio's manufacturing location. SUBMISSION RESULTS The result for dimensional measurements material & functional test and Yes No appearance criteria Statistical process package

The result meet all drawing and spacifaction requirement :

(if "No" - Explanation Required)

Mold / Cavity / Production Process.. DECLARATION I affirm that the samples represented by this warrant are representative of our parts which were made by a procss that meets all Producion Part Approval Process manual 4 th edition Requirements. I further warrant these samples were produced at the production rate of _____ /_____hours. I also certify that documented evidence o such compliance is on file and available for below. I have noted any deviation from this declaration below. EXPLANATION/COMMENTS:. Is each Customer Tool properly tagged and numbered? Organization Authorised Signature. . Print Name : Title SANDEEP SHARMA PLANT HEAD Phone No. : Email o Yes o No Dated 9811556757 FAX No. : oNa

splgandhi@yahoo.com
Part Functional Approval : oApproved oWaived Date Customer Tracking Number (Optional)

For Customer Use only (If Applicable) Part Warrant Disposition : oApproved Customer Signature Print Name

oRejected

oother

:A : 01 : 24-11-2006

0.110

29/06/2013

oN/a

oN/a

Statistical process package

meets all Producion Part rate of _____ /_____hours. n from this declaration below.

PROCESS FLOW DIAGRAM


( F-09-02)

ISSUE REV DATE

: : :

A 0 01-11-01

Part No. Part Name Customer

146542 - 833 STAY SUCTION HOSE M/S SUBROS LTD.

Report No. Date Of Issue Rev. Status 2) BRACKET

S.T.P.L/SUB./PFD 833 10/7/2013 0 3) BOLT

1) STAY SUCT. HOSE

FLOW

S.NO

PROCESS

FLOW

S.NO

PROCESS

FLOW

S.NO

PROCESS

STORAGE INCOMING INSPN. ( R/M) BLANKING + PUNCHING NOTCH BENDING BENDING CHILD PART WELDING

STORAGE INCOMING INSPN. BLANKING

STORAGE INCOMING INSPN.

3A

10 20

2A 2B

30

2C

BENDING

40

50

60 BOLT WELDING

70

POWDER COATING INCOMING INSPECTION FINAL INSPECTION PACKING PRE DISPATCH AUDIT

` `

80

90

100

110

120

DISPATCH

Transfer Storage Inspection Oeration cum Inspection Operation

Prepared By : NEERAJ SHUKLA

Approved By: VINOD ARYA

STPL
Prototype Pre-Launch Production Control plan number : STPL/SUB/CP/833 Product number / Latest change level :: 146542-833

CONTROL PLAN (F-09-04)


Key contact : Vinod Arya Phone Nos: 9560033352
Core Team: Mr.Vinod Arya, AMIT(Q.A).PANKAJ(podn.),Surander(Store),Sachin Kumar(Dispatch)

Page :
Date ( Orig. ): Date(Afact.) : 10/7/2013 10/7/2013

Customer Engineering Approval / Date(if Reqd.) :- Customer Quality Approval/Date (if Reqd.)

Product Name / Description : STAY SUCTION HOSE Supplier / plant: Special Tools Pvt Ltd.
Part Process No. M/c, Device, Jig, Tools for mfg., Customer Information

Supplier / Plant approval Date: Csupplier Code :


Characteristics

Other Approval Date ( if Reqd) : Specs/Char Class

-----

Other Approval Date (if Reqd.) :-----Methods

Process

Product

S. No

Process Name / Opn. Description

Product / Process Specs. Tolerance

Sample Evaluation Meas. Technique Size Freq. Control Method Error Proofing Reaction Plan Corrective Action

1 2 10 Incoming INSPN. 3

MATERIAL THICKNESS Appearance

SPCC - SD 3.20.20 No Burr No Dent No Scratch.

SPPLR. SPECTRO LAB

1Pcs n=5

Per Year PerLot IQIR

MICRO METER Visual

REJECT / STOP

Inform to supplier and quality head / Segregate the material

Power Press 50 - 100Tons Blanking + Punching Tool 1/3

1 THICKNESS 2 HOLE DIA 3 HOLE DIA 4 DIM 5 DIM

3.20.20

MICRO METER

5 Nos

F.M.L

Side Gauges and Stoper Pin

6.50.5 60.5 9.20.5 121 16.21 No Burr No Dant/Scr. No Blank Short

V.C V.C V.C V.C H.G Visual


Q.M.C

provided

20

Blanking +Punching

6 DIM Appearance

REJECT / STOP

Inform to rpoduction and quality head / rectify and tool / segregate the material

Power Press 30-60 Tons 30 Notch Bending


Bending Tool 2/3

1 ANGLE 2 DIM

140 14.31
No Dent/ No Scratch.

PP H.G

5 Nos F.M. L.
Q.M.C

stopper pin and gauges in tool

REJECT / STOP

Inform to rpoduction and quality head / rectify and tool / segregate the material

Power Press 60 -100Tons


Bending Tool 3/3

1 DIM 2 DIM 3 DIM 4 Appearance

25.70.5 81.400.50 27 No Crack No Dent/ No Scratch.

HG HG HG Visual

5 Nos F.M. L.

sttoper pin and gauges in tool

40

Bending

Q.M.C

REJECT / STOP

Inform to rpoduction and quality head / rectify and tool / segregate the material

CHILD BRACKET
1 2 2A Incoming INSPN. 3 MATERIAL THICKNESS Appearance SPCC - SD 1.2t No Burr No Dent No Scratch.
SPPLR. SPECTRO LAB

1Pcs n=5

Per year PerLot IQIR

MICRO METER Visual

REJECT / STOP

Inform to supplier and quality head / Segregate the material

STPL
Prototype Pre-Launch Production Control plan number : STPL/SUB/CP/833 Product number / Latest change level :: 146542-833

CONTROL PLAN (F-09-04)


Key contact : Vinod Arya Phone Nos: 9560033352
Core Team: Mr.Vinod Arya, AMIT(Q.A).PANKAJ(podn.),Surander(Store),Sachin Kumar(Dispatch)

Page :
Date ( Orig. ): Date(Afact.) : 10/7/2013 10/7/2013

Customer Engineering Approval / Date(if Reqd.) :- Customer Quality Approval/Date (if Reqd.)

Product Name / Description : STAY SUCTION HOSE Supplier / plant: Special Tools Pvt Ltd. Power Press 10 - 30 Tons Csupplier Code :

Supplier / Plant approval Date: Other Approval Date ( if Reqd) : 1.2t ----5 Nos

Other Approval Date (if Reqd.) :-----F.M.L

1 THICKNESS 2 APPEARANCE

MICRO METER

Side Gauges and Stoper Pin


Q.M.C

No Burr No Dant/Scr. No Blank Short

VISUAL

2B

Blanking

Blanking.Tool 1/2

provided

REJECT / STOP

Inform to rpoduction and quality head / rectify and tool / segregate the material

Power Press 10 - 30 Tons

1 THICKNESS 2 DIM

1.2t

MM H.G

5 Nos F.M. L.

Side Gauges and Stoper Pin


Q.M.C

4.170.5

2C

Bending

Bending Tool 1/2

provided

REJECT / STOP

Inform to rpoduction and quality head / rectify and tool / segregate the material

MIG Welding

1 DIM 2 DIM 3 APPEARANCE

0.40.1 19.70.5
No Dent/ No Scratch.

H.G V.C VISUAL

5 Nos F.M. L.

Parameter controler provided


Q.M.C

Inform to rpoduction

50

Child Part Welding

on m/c

REJECT / and quality head / Correct the process / STOP


segregate the material

BOLT M6 X15
1 2 3A Incoming Inspection No Dent No Scratch. MIG Welding THREAD APPEARANCE M6 X 15 No Burr TRG Visual I.Q.I.R n=5 PerLot

REJECT / STOP

Inform to supplier and quality head / Segregate the material

1 THREAD 2 APPEARANCE

M6X15 No Crack
No Dent/ No Scratch.

TRG Visual

5 Nos F.M. L.

Parameter controler
Q.M.C

Inform to rpoduction

60

Bolt Welding

provided on m/c

REJECT / and quality head / Correct the process / STOP


segregate the material

70

E.D PAINT

OUT SOURCE
1 2 SST THICKNESS APPEARANCE as per standard 20 Min NO BLISTER NO PITTED NO PEEL OFF n=1 n=5 Per Year PerLot IQIR

80

Incoming Inspection

TIME CONTROLER PROVIDED AT OVEN

REJECT / STOP

Inform to Supplier and quality head / Segregate the material

STPL
Prototype Pre-Launch Production Control plan number : STPL/SUB/CP/833 Product number / Latest change level :: 146542-833

CONTROL PLAN (F-09-04)


Key contact : Vinod Arya Phone Nos: 9560033352
Core Team: Mr.Vinod Arya, AMIT(Q.A).PANKAJ(podn.),Surander(Store),Sachin Kumar(Dispatch)

Page :
Date ( Orig. ): Date(Afact.) : 10/7/2013 10/7/2013

Customer Engineering Approval / Date(if Reqd.) :- Customer Quality Approval/Date (if Reqd.)

Product Name / Description : STAY SUCTION HOSE Supplier / plant: Special Tools Pvt Ltd. 1 2 3 4 5 6 7 8 9 90 Final Inspection 10 11 Csupplier Code : THICKNESS DIM DIM DIM ANGLE HOLE DIA DIM DIM THREAD PLATING THICKNESS APPEARANCE

Supplier / Plant approval Date: Other Approval Date ( if Reqd) : 3.20.20 9.20.5 25.70.5 0.4 19.71 6.50.5 81.40.5 16.21 M6 X 15 20 Min NO BLISTER NO PITTED NO PEEL OFF NO CRACK NO DENT NO SCRATCH ----M.M V.C H.G H.G PP V.C H.G H.G TRG THICKNESS TESTER VISUAL n=5 n=5 n=5 n=5 n=2 n=5 Per lot

Other Approval Date (if Reqd.) :-----As per final inspection standard

REJECT / STOP

Inform to Production and quality head / Segregate the material / Stop the dispatch

Manual

Appearance

No Burr No Rusty

Visual

100%

Per Pre dispatch audit Lot

Stop the dispatch

100

Packing

No Scratches No Operation Missing

REJECT / STOP

and segregate the

material
Manual 1 Packing 2 Qty 110 Pre Dispatch AUDIT 3 Leveling 4 Insp. Report Compare with invoice Qty& Packing Slip Qty REJECT / STOP 120 Dispatch As per Costumer Requirement REACTION PLAN
1. REJECT THE LOT AND INFORM THE SUPERVISOR / QAD 2. CORRECT THE PROCESS AND CONTINUE 3. STOP THE PROCESS AND INFORM THE SUPERVISOR 4. ALL REACTION PLAN INVOKES 100 % INSPECTION

Visual

100%

Per Lot Customer Feedback

PROCESS - FMEA
F:09-03 Item : STAY SUCTION HOSE ( 146542 - 833 ) Model Year / Vehicle :
Part/ Proc. No.

ISSUE : A REV. DATE : 00 : 01.11.01

Org. Date Key Date :

10/7/2013 10/7/2013
O C C Current process control prevention Current process control detection D E T

FMEA NO :STPL / SUB/ FMEA/833

Rev '00
Action Results Action Taken S E V O C C D E T R P N

Core Team : SANDEEP SHARMA ( PLANT HEAD),VINOD ARYA, AMIT (Q.A),PANKAJ(Prdn.), Surander Singh(Store)

Process/ Function Requirements

Potential Failure Mode Potential Effects of Failure

S E V

C L A S

Potential Cause of Mechanism of Failure

R P N
Recommended Actions

Responsibility & Target Completion Date

10

1) Wrong PO given to supplier 2) Defective material supplied by supplier 6 3) Incoming inspection failure.

1) issuing RM PO with part R/M 2 STD. 2) Supplier Test Certificate and 2 material received in single heat number 3)Before Start Process Check By Q.C Insp. Or Make Q.M.C

72

Thickness undersize

Life of component less, Wrinkle, Burr etc.

72

72

1) Wrong PO given to supplier 2) Defective material supplied by supplier Thickness oversize Die damaged, Thinning, Crack. 6 3) Incoming inspection failure.

1) issuing RM PO with part R/M 2 STD. 2) Supplier Test Certificate and material received in single heat 2 number 3)Before Start Process Check By Q.C Insp. Or Make Q.M.C compare with master list of R/M & IQIR

72

72

72

INCOMING INSPECTION Width under / over Size

1) Wrong PO given to supplier Difficult for location 4 2) Defective material supplied by supplier 3) Incoming inspection failure. Material preservation is not proper Rusty material supplied by supplier Wrong property Material supplied by Supplier Improper preservation Transportation Problem 1. Die & Punch Wear Out 2. Imroper Clearance in Die.

1) issuing RM PO with part R/M 2 STD. 2) Supplier Test Certificate and 2 material received in single heat number 1) issuing RM PO with part R/M 2 STD. SHEET WIDTH OR THIK.

48

48

48

Part Cracking Problem Damage & Excess oil Appearance poor Physical & Chemical Properties Rust Dent and Deformation Next Operation Part Cracking/ Wrinkle Problem Life of component less Produce rusty parts Appearance poor Crack developed / Tool wear out handling Fitment Problem / Difficult in handling.

5 5 5 5 5 5 7

3 3 3 3

R/M incoming inspection R/M incoming inspection

As Per Standerd & IQIR

6 6 6 6 6 6

90 90 90 90 90 90 84 100% Ins. Befoure Dispatch & Training Provided for Packing Associate

Compare TC with standard R/M incoming inspection IQIR IQIR

3 3 2

Customer Burr

Preventive Maintenance done as 2 per schedule.

3. Missalign in tooling User 4. RM Thckness is Less 5. Raw Material Problem Next Operation Part Location problem. 7 Punch broken. Preventive Maintenance done as per schedule.

Set up approval and patrol inspection.

96 6

QA+Packing /Done on 2/1/13

Raw Material incoming Inspection

84 100% Ins. Befoure Dispatch & Training Provided for Packing Associate

Incomplete Blanking

Customer

Fitment Prob.

Setting Problem

Use Operation Standard.

Set up approval and patrol inspection.

96

QA+Packing /Done on 2/1/13

User

Cutting Clearance Problem. Cutting Edge Blunt.

strip size match to die locating area

Next Operation Part Location problem.

Location Problem

Preventive Maintenance done as per schedule. Set up approval and patrol inspection. 6

84 100% Ins. Befoure Dispatch & Training Provided for Packing Associate

Blank Misfeed

Customer

Fitment Prob.

Sheet / Blank Undersize.

96

2 Raw Material incoming Inspection

QA+Packing /Done on 2/1/13

User Next Operation poor strength poor strength 6 6 setting problem die spotting prob raw materal problum 6 8 Punch broken. Setting problem. Wrong cutting clearance. Cutting edge blunt. Next Operation Production Hold Die Broken Customer User
Next Operation Piercing Hole missing Part Location problem. 7

2 2 2

use opration standerd p.m of die raw materal incoming inspaction

20

BLANKING & PIERCING

neck

Customer User

Set up approval and patrol inspection.

72 6 72

Next Operation Part Location problem. Customer Fitment Prob

2 P.M. of die 2 As Per S.T.P.L Satting Std. P.M. of die P.M. of die 2 Use Operation Standard. 2 Preventive Maintenance of Die. 2 scrap remove/hours
2 P.M. of die

Piercing Hole missing

Set up approval and patrol inspection.1 00% Ins.at Final stage.

5 60 5 80

User

6 7

Setting Problem External Element in the Die Scrap Jammed.


Punch broken.

Stoppage of Line

Set up approval and patrol inspection.

6 72 6 84 6 84

Set up approval and patrol inspection.

84

PROCESS - FMEA
F:09-03 Item : STAY SUCTION HOSE ( 146542 - 833 ) Model Year / Vehicle :
Part/ Proc. No.

ISSUE : A REV. DATE : 00 : 01.11.01

Org. Date Key Date :

10/7/2013 10/7/2013
O C C Current process control prevention Current process control detection D E T

FMEA NO :STPL / SUB/ FMEA/833

Rev '00
Action Results Action Taken S E V O C C D E T R P N

Core Team : SANDEEP SHARMA ( PLANT HEAD),VINOD ARYA, AMIT (Q.A),PANKAJ(Prdn.), Surander Singh(Store)

Process/ Function Requirements

Potential Failure Mode Potential Effects of Failure

S E V

C L A S

Potential Cause of Mechanism of Failure

R P N
Recommended Actions

Responsibility & Target Completion Date

Piercing Hole missing

Customer User

Fitment Prob -

Setting problem. 7 Wrong cutting clearance. Cutting edge blunt.

2 As Per S.T.P.L Satting Std. 2 P.M. of die 2 P.M. of die

Set up approval and patrol inspection.

84

Next Operation Part Location problem. Incomplete Profile. Customer User Fitment Prob. -

8 8

Location Problem Sheet / Blank Undersize.

Preventive Maintenance done as per schedule.

2 Raw Material incoming Inspection

Set up approval and patrol inspection.

96

100% Ins. Befoure Dispatch & Training QA+Packing Provided for Packing /Done on 2/1/13 Associate

Next Operation Production Hold Die Broken Customer User Stoppage of Line

6 7

Setting Problem External Element in the Die Scrap Jammed.

2 Use Operation Standard. 2 Preventive Maintenance of Die. 2 scrap remove/hours Set up approval and patrol inspection.

6 72 6 84 6 84

Next Operation fitment prob CRACK Customer User poor strength poor strength

7 7

Setting Problem die spotting prob Raw material problem

2 Use Operation Standard. 2 P.M.Of Die customer supplied material

Set up approval and patrol inspection.

6 84 6 84

Next Operation neck Customer User poor strength 7 7

setting problum die spotting prob Raw material problum 2 2

Use Operation Standard. P.M.Of Die Raw Material incoming Inspection Set up approval and patrol inspection. 6 84 6 84

Next Operation

material deposited on readius

P.Mof die Set up approval and patrol inspection.

30

NOTCH BENDING

Scratch

Customer

poor strength & fittment problem

raw material prob

2 customer supplied material

6 96

100% Ins. Befoure Dispatch & Training Provided for Packing Associate

QA+Packing /Done on 2/1/13

User

Next Operation pert location is not possibal in next opration 6

setting problam

use opration standerd Set up approval and patrol inspection. P.M of die

Incomplete profile customar user

72

fitment porob

die probnlum

Next Operation Production Hold Die Broken Customer User Next Operation fitment prob CRACK Customer User poor strength poor strength Stoppage of Line

6 7

Setting Problem External Element in the Die

2 Use Operation Standard. 2 Preventive Maintenance of Die.

Set up approval and patrol inspection.

6 72 6 84

7 7

Setting Problem die spotting prob Raw material problem

2 Use Operation Standard. 2 P.M.Of Die customer supplied material Set up approval and patrol inspection.

6 84 6 84

Next Operation Customer neck User poor strength 7 7

setting problum die spotting prob Raw material problum 2 2

Use Operation Standard. Set up approval and patrol Raw Material incoming Inspection inspection. P.M.Of Die 6 84 6 84

Next Operation

material deposited on readius

P.Mof die Set up approval and patrol inspection. 100% Ins. Befoure Dispatch & Training Provided for Packing Associate

40

BENDING

Scratch

Customer

poor strength & fittment problem

raw material prob

2 customer supplied material

6 96

QA+Packing /Done on 2/1/13

User Next Operation pert location is not possibal in next opration 6 setting problam 2 use opration standerd Set up approval and patrol inspection. die probnlum 2 P.M of die 6 7 Setting Problem External Element in the Die 2 Use Operation Standard. 2 Preventive Maintenance of Die. 6 72 6 84

Incomplete profile customar user

72

fitment porob

Next Operation Production Hold Die Broken Customer User Stoppage of Line

Set up approval and patrol inspection.

2A

1) Wrong PO given to supplier

1) issuing RM PO with part R/M 2 STD.

72

Thickness undersize

Life of component less, Wrinkle, Burr etc.

PROCESS - FMEA
F:09-03 Item : STAY SUCTION HOSE ( 146542 - 833 ) Model Year / Vehicle :
Part/ Proc. No.

ISSUE : A REV. DATE : 00 : 01.11.01

Org. Date Key Date :

10/7/2013 10/7/2013
O C C Current process control prevention Current process control detection D E T

FMEA NO :STPL / SUB/ FMEA/833

Rev '00
Action Results Action Taken S E V O C C D E T R P N

Core Team : SANDEEP SHARMA ( PLANT HEAD),VINOD ARYA, AMIT (Q.A),PANKAJ(Prdn.), Surander Singh(Store)

Process/ Function Requirements

Potential Failure Mode Potential Effects of Failure

S E V

C L A S

Potential Cause of Mechanism of Failure

R P N
Recommended Actions

2A

Responsibility & Target Completion Date

Thickness undersize

Life of component less, Wrinkle, Burr etc.

2) Defective material supplied by supplier 6 3) Incoming inspection failure.

2) Supplier Test Certificate and 2 material received in single heat number 3)Before Start Process Check By Q.C Insp. Or Make Q.M.C

72

72

1) Wrong PO given to supplier 2) Defective material supplied by supplier Thickness oversize Die damaged, Thinning, Crack. 6 3) Incoming inspection failure. INCOMING INSPECTION CHILD BRAKET Width under / over Size Difficult for location 4

1) issuing RM PO with part R/M 2 STD. 2) Supplier Test Certificate and material received in single heat 2 number 3)Before Start Process Check By Q.C Insp. Or Make Q.M.C compare with master list of R/M & IQIR

72

72

72

1) Wrong PO given to supplier 2) Defective material supplied by supplier 3) Incoming inspection failure. Material preservation is not proper Rusty material supplied by supplier Wrong property Material supplied by Supplier Improper preservation Transportation Problem 1. Die & Punch Wear Out 2. Imroper Clearance in Die.

1) issuing RM PO with part R/M 2 STD. 2) Supplier Test Certificate and 2 material received in single heat number 1) issuing RM PO with part R/M 2 STD. SHEET WIDTH OR THIK.

48

48

48

Part Cracking Problem Damage & Excess oil Appearance poor Physical & Chemical Properties Rust Dent and Deformation Part Cracking/ Wrinkle Problem Life of component less Produce rusty parts Appearance poor Crack developed / Tool Next Operation wear out handling Fitment Problem / Difficult in handling.

5 5 5 5 5 5 7

3 3 3 3

R/M incoming inspection R/M incoming inspection

As Per Standerd & IQIR

6 6 6 6 6 6

90 90 90 90 90 90 84 100% Ins. Befoure Dispatch & Training Provided for Packing Associate

Compare TC with standard R/M incoming inspection IQIR IQIR

3 3 2

Customer Burr

Preventive Maintenance done as 2 per schedule.

3. Missalign in tooling User 4. RM Thckness is Less 5. Raw Material Problem Next Operation Part Location problem. 7 Punch broken. Preventive Maintenance done as per schedule.

Set up approval and patrol inspection.

96 6

QA+Packing /Done on 2/1/13

Raw Material incoming Inspection

84 100% Ins. Befoure Dispatch & Training Provided for Packing Associate

Incomplete Blanking

Customer

Fitment Prob.

Setting Problem

Use Operation Standard.

Set up approval and patrol inspection.

96

QA+Packing /Done on 2/1/13

User

Cutting Clearance Problem. Cutting Edge Blunt.

strip size match to die locating area

2B

BLANKING

Next Operation Part Location problem.

Location Problem

Preventive Maintenance done as per schedule. Set up approval and patrol inspection.

84 100% Ins. Befoure Dispatch & Training Provided for Packing Associate

Blank Misfeed

Customer

Fitment Prob.

Sheet / Blank Undersize.

96

2 Raw Material incoming Inspection

QA+Packing /Done on 2/1/13

User Next Operation neck Customer User Next Operation Part Location problem. Customer Fitment Prob 6 8 poor strength poor strength 6 6 setting problem die spotting prob raw materal problum Punch broken. Setting problem. Wrong cutting clearance. Cutting edge blunt. Next Operation Production Hold Die Broken Customer User Next Operation fitment prob CRACK Customer poor strength 7 7 Stoppage of Line 6 7 Setting Problem External Element in the Die Scrap Jammed. Setting Problem die spotting prob 2 2 2 use opration standerd p.m of die raw materal incoming inspaction Set up approval and patrol inspection.1 00% Ins.at Final stage. 5 60 5 80 72 6 72

Set up approval and patrol inspection.

2 P.M. of die 2 As Per S.T.P.L Satting Std. P.M. of die P.M. of die 2 Use Operation Standard. 2 Preventive Maintenance of Die. 2 scrap remove/hours 2 Use Operation Standard. 2 P.M.Of Die

Piercing Hole missing

User

Set up approval and patrol inspection.

6 72 6 84 6 84 6 84

Set up approval and patrol inspection.

6 84

PROCESS - FMEA
F:09-03 Item : STAY SUCTION HOSE ( 146542 - 833 ) Model Year / Vehicle :
Part/ Proc. No.

ISSUE : A REV. : 00 DATE : 01.11.01

Org. Date Key Date :

10/7/2013 10/7/2013
O C C Current process control prevention Current D E T

FMEA NO :STPL / SUB/ FMEA/833

Rev '00
Action Results Action Taken S E V O C C D E T R P N

Core Team : SANDEEP SHARMA ( PLANT HEAD),VINOD ARYA, AMIT (Q.A),PANKAJ(Prdn.), Surander Singh(Store)

Process/ Function Requirements

Potential Failure Mode Potential Effects of Failure

S E V

C L A S

Potential Cause of Mechanism of Failure

R P N
Recommended Actions

CRACK User poor strength

Raw material problem customer supplied material

Set up control approval and detection patrol inspection.

process

Responsibility & Target Completion Date

Next Operation Customer neck User poor strength 7 7

setting problum die spotting prob Raw material problum 2 2

Use Operation Standard. Set up approval and patrol Raw Material incoming Inspection inspection. P.M.Of Die 6 84 6 84

Next Operation

material deposited on readius

P.Mof die Set up approval and patrol inspection. 100% Ins. Befoure Dispatch & Training Provided for Packing Associate

2C

BENDING

Scratch

Customer

poor strength & fittment problem

raw material prob

2 customer supplied material

6 96

QA+Packing /Done on 2/1/13

User Next Operation pert location is not possibal in next opration 6 setting problam 2 use opration standerd Set up approval and patrol inspection. die probnlum 2 P.M of die 6 7 Setting Problem External Element in the Die 2 Use Operation Standard. 2 Preventive Maintenance of Die. 6 72 6 84

Incomplete profile customar user

72

fitment porob

Next Operation Production Hold Die Broken Customer User Location not correct Stoppage of Line

Set up approval and patrol inspection.

Fitment Problem

Fixture was not ok

2 set the fixture calibration frequency

QMC

70

50

CHILD PART Dimension N.G WELDING

Fitment Problem

Fixture was not ok

2 set the fixture calibration frequency

QMC

70

3A

INCOMING INSPECTION BOLT M6 X 15

Thread Profile N.G

Fitment problem

Improper handling

2 Inform to supplier

IQIR

72

Dimension N.G

Fitment problem

Fixture was not ok

2 set the fixture calibration frequency

QMC

48

60

BOLT WELDING

Location not correct

Fitment problem

Fixture was not ok

2 set the fixture calibration frequency

QMC

56

Std did not give Wrong passivation Next Operation Wrong Appearance to supplier 6 Less Coating thickness Process fault at plating Customer Less life of part supplier

2 1. Customers Quality Standard provide IQIR 2 1. Reject material & return to supplier IQIR

72

70

E.D PAINT

72

80

INCOMING INSPECTION E.D PAINT

N.G Piece pass to the Customer O.K Piece got rejected Customer

customer dissatisfaction

Inspector error

2 Training provided

IQIR

96

less material for final dispatch

inspector errror

2 Training provided

IQIR

96

90

FINAL INSP 1.Inspection Fitment Problem 8 2 Insp. Std Given

Inspection Report ( final) 100% gauging with marking Pre Dispatch Insp.

80

Missing

as per Control plan Defined location for each product Fitment Problem 8 Material Mix 2

100

PACKING Wrong part packing Poor/loose packing Packing Less/Over Qty Material without stripping Customer Dissatisfied Damage during transportation 7 Improper Handling 2 Handling as per std Pre Dispatch Insp. 6 84 96 DOCK Audit as per plan

140

PREDISPATCH Insp.

Abnormility against standard

Customer Dissatisfied

Customer Dissatisfied

Improper handling

Customer feed back

84

PROCESS - FMEA
F:09-03 Item : STAY SUCTION HOSE ( 146542 - 833 ) Model Year / Vehicle :
Part/ Proc. No.

ISSUE : A REV. : 00 DATE : 01.11.01

Org. Date Key Date :

10/7/2013 10/7/2013
O C C Current process control prevention Current process control detection D E T

FMEA NO :STPL / SUB/ FMEA/833

Rev '00
Action Results Action Taken S E V O C C D E T R P N

Core Team : SANDEEP SHARMA ( PLANT HEAD),VINOD ARYA, AMIT (Q.A),PANKAJ(Prdn.), Surander Singh(Store)

Process/ Function

Potential Failure Mode Potential Effects of Failure

S E V

C L A S

Potential Cause of Mechanism of Failure

R P N
Recommended Actions

140

PRERequirements DISPATCH Insp.

Responsibility & Target Completion Date

Abnormility against standard

Customer Dissatisfied

Customer Dissatisfied

Improper handling

Customer feed back

84

120

DISPATCH

AS per customer Requirement

CHECKING AIDS LIST


( For Gauges, Instruments & Testing Equipments)

Date( Orig ) :

10/7/2013

Checking Aid No.: STPL/ SUB./CA /833 Date:10/07/2013

Customer Name: Name of the Part:


Sr No

M/S SUBROS LTD STAY SUCTION HOSE


GAUGE/INSTURMENTS/TEST EQUIPMENTS NO.

Customer Code: Part No: 146542 - 833


CALIBRATION FREQ. LEAST COUNT MSA YES/NO/NR

GAUGES/INSTRUMENTS

A 1 2 3

INSTRUMENTS Micro Meter Digital Vernier Caliper Digital Height Gauge STPL/MM/02 STPL/DVC//01 STPL/DHG/01 One Year One Year One Year 0.01 mm 0.01 mm 0.01 mm

GAUGES

TESTING EQUIPMENTS

MASTER SAMPLES

PREPARED BY : AMIT DHIMAN

APPROVED BY: VINOD ARYA

SPECIAL

FINAL INSPECTION STANDARD


(F-21-03)A
DOC.No :- STPL/ SUB/ FIS/833 REV :- 00
DATE :- 10/07/13

PART NAME :- STAY SUCT. HOSE PART No:- 146542 - 833 CUSTOMER :- M/S SUBROS LTD.

Special char./class

SL. NO.

INSPECTION ITEM

SEPECIFIED

INSPECTION METHOD / USED TOOLS

FREQUENCY

RESPONSIBILITY

(A) 1

APPEARANCE APPEARANCE Dent , Burr, Scratch, Rust Not allowed Coating defect,color mismatch,blister peel off not visiable VISUAL

100% 100%

PACKING ASSOCIATE PACKING ASSOCIATE

2 (B) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

APPEARANCE (COATING) DIMENSIONS


THICKNESS DIM DIM DIM ANGLE HOLE DIA DIM DIM THREAD PLATING THICKNESS APPEARANCE

VISUAL

3.20.20 9.20.5 25.70.5 0.4 19.71 6.50.5 81.40.5 16.21 M6 X 15 20 Min NO BLISTER NO PITTED NO PEEL OFF NO CRACK NO DENT NO SCRATCH

M.M V.C H.G H.G PP V.C H.G H.G TRG THICKNESS TESTER VISUAL

AS PER S. PLAN AS PER S. PLAN AS PER S. PLAN AS PER S. PLAN AS PER S. PLAN AS PER S. PLAN AS PER S. PLAN AS PER S. PLAN AS PER S. PLAN AS PER S. PLAN

Q.C.Inspector Q.C.Inspector Q.C.Inspector Q.C.Inspector Q.C.Inspector Q.C.Inspector Q.C.Inspector Q.C.Inspector Q.C.Inspector Q.C.Inspector Q.C.Inspector PACKING ASSOCIATE PACKING ASSOCIATE PACKING ASSOCIATE PACKING ASSOCIATE PACKING ASSOCIATE

100% 100% 100% 100% 100% 100%

(c) MATERIAL 1 2 3 Grade


Chemical Properties Physical Properties

SPHC-SD

T.C

PER LOT

Q.C.Inspector

Prepared By :-

KAPIL TOMAR

Approved By :-

Vinod Arya

ISSUE : A REV : 00 DATE :29.09.11

UB/ FIS/833

REMARKS

Vinod Arya

SOURCE LIST
MODEL: PART NAME: STAY SUCT. HOSE PART NO: 146542 - 833 SUBROS PART NO:146542 - 833 Level 1 Parts S# Part Name Part No. Source S# Part Name Part No. Source S# Part Name Part No. Source Level 2 Parts S# Part Name Part No. Source Level 3 Parts Material Spec.

Prepared By : Checked By : Approved By :

STAY SUCT HOSE

146542 833

STPL

STAY SUCT. HOSE (POWDER COATING)

146542 833

POWDER COATING (PTC)

STAY SUCT. HOSE

IN HOUSE

RAW MATERIAL

146542 833 146542 833 146542 833

BHUSHAN STEEL

SPHC-SD

BRACKET BOLT 647850 3010

IN HOUSE OUT SOURSE

RAW MATERIAL RAW MATERIAL

BHUSHAN STEEL

SPCC-SD SS- 41B

PRIME TECH

Ved prakash Vinod Arya Sandeep Sharma

Remarks

PACKING WORK INSTRUCTION


VENDOR NAME

PART NAME : STAY SUCT HOSE PART NO. :146542 - 833

SUPPLIER : M/s STPL QTY. PER BIN :

Purpose :To ensure the proper packing as per the instruction given below:-

EMPTY BOX

BIN WITH PART

BIN READY TO DISPATCH

BIN WITH NAM

Quantity Details:Per Packet qty: Per BIN qty: nos. nos.

BIN Details:BIN SIZE : 500X300X200 inch

Weight Details:Part Weight : 0.110 kg BIN Weight : Gross Wt. : 1.5 kg kg

PREPARED BY

CHECKED BY

APPROVED BY Supplier

DOC. NO ISSUE NO. DATE PAGE A 10/02/2012 1 OF 1

WITH PARTS IN IT.

BIN WITH NAME ON IT

You might also like