Site Location
The proposals Redrow is intending to submit planning applications to Preston City Council to agree the detailed design and layout of the rst phases of development. Phase 1a and Phase 1b include the development parcels adjacent to the eastern and western access points to the site. A separate application will be submitted to approve details of the main highways and drainage infrastructure across the whole site.
Green Hub
The applications In total, we will be submitting four separate planning applications, as follows:
Infrastructure application Green Hub
Application 1 and 2
Reserved Matters (application for detailed layout, landscape, design, scale plus the access details for Phase 1b) Phase 1a, adjacent to the eastern site access (20 no. 3-4 bed detached houses). Phase 1b, adjacent to the western site access (71 no. houses) comprising a mix of 2-4 bed family houses; 21 of these dwellings will be affordable.
Green Hub
Phase 1a
Phase 1b
Application 3
Full planning application for the site infrastructure, which includes the main spine road, surface water drainage ponds and public open space.
Application 4
Application to vary a number of the conditions attached to the consented outline planning permission, to enable information to be provided in a phased manner. This information will then be provided in respect of phases 1a and 1b so that construction can begin.
An illustration of the different parts of the site which relate to these applications are shown on the masterplan opposite.
Site Masterplan