Professional Documents
Culture Documents
BACKGROUND
The environmental review process for a highway or transit project may take up to four to
six years to complete. In addition to the environmental review, other phases constitute a large
part of the project delivery process, with up to nine years of the typical completion time for
highway and transit projects consumed by the planning, design, and construction processes. The
time to complete a project can be particularly long for projects that are large, complicated, or have
controversial aspects.
In contrast to the long average project delivery time, there have been notable instances of
much faster project delivery. Often these instances have been sparked by a catastrophic incident.
Of particular note is the reconstruction of the I-35W bridge in Minnesota in just a little over 400
days after its tragic collapse. This project should be used as a model for how other projects
across the country can be completed in a more expedited fashion. Besides the focus placed on
the reconstruction due to its importance, other factors that contributed to the fast delivery of the I-
35W bridge reconstruction included good communication between local, State, and Federal
officials; use of a design-build contract; and use of accelerated bridge construction techniques.
Therefore, while the singular focus that often occurs after a disaster is not possible to replicate for
most projects, there are still broadly applicable lessons that can be learned from these instances
that will serve to enhance the speed of all highway projects.
Steps have been taken in recent years to reduce the time of highway project delivery,
particularly in streamlining the environmental review process. Examples of these steps include
Executive Order 13274 on Environmental Streamlining and section 6002 of SAFETEA-LU, which
makes environmental reviews for highway projects more efficient. Section 6002 permits
environmental reviews to take place concurrently rather than sequentially. However, it is too early
to assess whether the reforms in section 6002 will be effective in reducing the time it take to
delivery a highway project. In addition, even if the section 6002 reforms are effective, the average
speed for completing a highway project will still be far too slow. Therefore, there is clearly a need
for more coordination in expediting project delivery and wider implementation of practices and
techniques that serve to enhance the speed of project delivery. Additional measures to streamline
the environmental review process that will compliment the reforms in Section 6002 are also
warranted.
SURFACE TRANSPORTATION AUTHORIZATION ACT
The Surface Transportation Authorization Act takes significant measures to greatly reduce
the time it takes to complete highway projects. Foremost, the Surface Transportation
Authorization Act establishes the Office of Expedited Project Delivery (OEPD). In addition, the Act
contains provisions that further streamline the environmental review process.
15
The OEPD is tasked with coordinating and expediting project delivery within the FHWA.
There will be a particular focus on the largest and most complicated highway projects. The OEPD
is located in the Office of the Administrator of the FHWA. The OEPD is headed by a Director in
the Senior Executive Service. In addition, points of contact to work with the OEPD are identified in
the Office of the Secretary, FHWA Federal-aid division offices, and FHWA headquarters offices.
The OEPD will perform the following functions:
Enhances the speed of project delivery for the largest and most complicated highway
projects
• Monitors the project through the planning, environmental review, permitting, design, right-
of-way acquisition, and construction stages;
• Participates in the State’s development of a schedule for environmental review;
• Assists the State in developing a comprehensive schedule for the remainder of project
delivery process after the environmental review is complete;
• Promotes and assists in the use of practices and techniques that serve to enhance the
speed of project delivery (such as the use of design-build procurement, accelerated
construction techniques, and coordination of all parties involved in the project’s delivery
including parties in other Federal agencies); and
• Works with the designated points of contact to expedite the project’s delivery.
15
To enhance the speed of delivery of transit projects, there will be a separate OEPD within the Federal
Transit Administration (FTA). The structure of the FTA OEPD and the duties of its Director will be similar to
those outlined in this summary, except that the focus will be on New Start projects. The new FTA OEPD
will complement the faster project delivery that will result from the simplifications of the Federal process for
transit projects that are part of the reforms in the Surface Transportation Authorization Act.
Providing national leadership to enhance the speed of project delivery
• Compiles and disseminates information on practices and techniques that enhance the
speed of project delivery;
• Promotes the use of practices and techniques that speed project delivery;
• Serves as a clearinghouse among the States for best practices;
• Coordinates the provision of technical assistance to States by other offices and parties on
practices and techniques that enhance the speed of project delivery;
• Provides support to the Office of the Secretary in relation to any interagency body
regarding project delivery or streamlining environmental reviews.
The Act also refines and expands upon previous environmental streamlining efforts to
help deliver infrastructure projects and programs more quickly with better outcomes. The
environmental streamlining efforts in the Act include: