successfully completed before railroad placed in service. Thereafter, it shall
operations over the grade crossing re- be tested at least once each month and sume. whenever modified or disarranged. (c) Any electronic device, relay, or (b) Warning bells or other stationary other electromagnetic device that fails audible warning devices shall be tested to meet the requirements of tests re- when installed to determine that they quired by this part shall be removed function as intended. Thereafter, they from service and shall not be restored shall be tested at least once each to service until its operating charac- month and whenever modified or dis- teristics are in accordance with the limits within which such device or arranged. relay is designed to operate. § 234.259 Warning time. [61 FR 31806, June 20, 1996, as amended at 66 FR 49560, Sept. 28, 2001] Each crossing warning system shall be tested for the prescribed warning § 234.249 Ground tests. time at least once every 12 months and A test for grounds on each energy bus when the warning system is modified furnishing power to circuits that affect because of a change in train speeds. the safety of warning system operation Electronic devices that accurately de- shall be made when such energy bus is termine actual warning time may be placed in service and at least once each used in performing such tests. month thereafter. § 234.261 Highway traffic signal pre- § 234.251 Standby power. emption. Standby power shall be tested at Highway traffic signal pre-emption least once each month. interconnections, for which a railroad has maintenance responsibility, shall § 234.253 Flashing light units and lamp be tested at least once each month. voltage. (a) Each flashing light unit shall be § 234.263 Relays. inspected when installed and at least (a) Except as stated in paragraph (b) once every twelve months for proper alignment and frequency of flashes in of this section, each relay that affects accordance with installation specifica- the proper functioning of a crossing tions. warning system shall be tested at least (b) Lamp voltage shall be tested once every four years. when installed and at least once every (b)(1) Alternating current vane type 12 months thereafter. relays, direct current polar type relays, (c) Each flashing light unit shall be and relays with soft iron magnetic inspected for proper visibility, dirt and structure shall be tested at least once damage to roundels and reflectors at every two years. least once each month. (2) Alternating current centrifugal type relays shall be tested at least once § 234.255 Gate arm and gate mecha- nism. every 12 months. (c) Testing of relays requiring testing (a) Each gate arm and gate mecha- on four year intervals shall be com- nism shall be inspected at least once pleted in accordance with the following each month. (b) Gate arm movement shall be ob- schedule: served for proper operation at least (1) Not less than 50% by the end of once each month. calendar year 1996; (c) Hold-clear devices shall be tested (2) Not less than a total of 75% by the for proper operation at least once every end of calendar year 1997; and 12 months. (3) One hundred percent by the end of calendar year 1998. § 234.257 Warning system operation. (d) Testing of relays requiring testing (a) Each highway-rail crossing warn- on two year intervals shall be com- ing system shall be tested to determine pleted by the end of calendar year 1996. that it functions as intended when it is
492
VerDate jul<14>2003 10:17 Oct 31, 2003 Jkt 200206 PO 00000 Frm 00492 Fmt 8010 Sfmt 8010 Y:\SGML\200206T.XXX 200206T