§ 234.249 49 CFR Ch.

II (10–1–03 Edition)

successfully completed before railroad placed in service. Thereafter, it shall


operations over the grade crossing re- be tested at least once each month and
sume. whenever modified or disarranged.
(c) Any electronic device, relay, or (b) Warning bells or other stationary
other electromagnetic device that fails audible warning devices shall be tested
to meet the requirements of tests re- when installed to determine that they
quired by this part shall be removed function as intended. Thereafter, they
from service and shall not be restored
shall be tested at least once each
to service until its operating charac-
month and whenever modified or dis-
teristics are in accordance with the
limits within which such device or arranged.
relay is designed to operate.
§ 234.259 Warning time.
[61 FR 31806, June 20, 1996, as amended at 66
FR 49560, Sept. 28, 2001]
Each crossing warning system shall
be tested for the prescribed warning
§ 234.249 Ground tests. time at least once every 12 months and
A test for grounds on each energy bus when the warning system is modified
furnishing power to circuits that affect because of a change in train speeds.
the safety of warning system operation Electronic devices that accurately de-
shall be made when such energy bus is termine actual warning time may be
placed in service and at least once each used in performing such tests.
month thereafter.
§ 234.261 Highway traffic signal pre-
§ 234.251 Standby power. emption.
Standby power shall be tested at Highway traffic signal pre-emption
least once each month. interconnections, for which a railroad
has maintenance responsibility, shall
§ 234.253 Flashing light units and lamp be tested at least once each month.
voltage.
(a) Each flashing light unit shall be § 234.263 Relays.
inspected when installed and at least
(a) Except as stated in paragraph (b)
once every twelve months for proper
alignment and frequency of flashes in of this section, each relay that affects
accordance with installation specifica- the proper functioning of a crossing
tions. warning system shall be tested at least
(b) Lamp voltage shall be tested once every four years.
when installed and at least once every (b)(1) Alternating current vane type
12 months thereafter. relays, direct current polar type relays,
(c) Each flashing light unit shall be and relays with soft iron magnetic
inspected for proper visibility, dirt and structure shall be tested at least once
damage to roundels and reflectors at every two years.
least once each month. (2) Alternating current centrifugal
type relays shall be tested at least once
§ 234.255 Gate arm and gate mecha-
nism. every 12 months.
(c) Testing of relays requiring testing
(a) Each gate arm and gate mecha-
on four year intervals shall be com-
nism shall be inspected at least once
pleted in accordance with the following
each month.
(b) Gate arm movement shall be ob- schedule:
served for proper operation at least (1) Not less than 50% by the end of
once each month. calendar year 1996;
(c) Hold-clear devices shall be tested (2) Not less than a total of 75% by the
for proper operation at least once every end of calendar year 1997; and
12 months. (3) One hundred percent by the end of
calendar year 1998.
§ 234.257 Warning system operation. (d) Testing of relays requiring testing
(a) Each highway-rail crossing warn- on two year intervals shall be com-
ing system shall be tested to determine pleted by the end of calendar year 1996.
that it functions as intended when it is

492

VerDate jul<14>2003 10:17 Oct 31, 2003 Jkt 200206 PO 00000 Frm 00492 Fmt 8010 Sfmt 8010 Y:\SGML\200206T.XXX 200206T