Pipeline and Hazardous Materials Safety Admin., DOT § 193.

2503

(1) Section 7.3.1.2 of NFPA 59A (2006) (b) Each remotely actuated control
(incorporated by reference, see system and each automatic shutdown
§ 193.2013); control system required by this part
(2) Appendices Q and C of API 620 must be operable from the control cen-
Standard (incorporated by reference, ter.
see § 193.2013); (c) Each control center must have
(c) Ultrasonic examination records personnel in continuous attendance
must be retained for the life of the fa- while any of the components under its
cility. If electronic records are kept, control are in operation, unless the
they must be retained in a manner so control is being performed from an-
that they cannot be altered by any other control center which has per-
means; and sonnel in continuous attendance.
(d) The ultrasonic equipment used in (d) If more than one control center is
the examination of welds must be cali- located at an LNG Plant, each control
brated at a frequency no longer than center must have more than one means
eight hours. Such calibrations must of communication with each other cen-
verify the examination of welds against ter.
a calibration standard. If the ultra- (e) Each control center must have a
sonic equipment is found to be out of means of communicating a warning of
calibration, all previous weld inspec- hazardous conditions to other locations
tions that are suspect must be reexam- within the plant frequented by per-
ined. sonnel.
[Amdt. 193–22, 75 FR 48605, Aug. 11, 2010] § 193.2443 [Reserved]
§§ 193.2323–193.2329 [Reserved] § 193.2445 Sources of power.
(a) Electrical control systems, means
Subpart E—Equipment of communication, emergency lighting,
§ 193.2401 Scope. and firefighting systems must have at
least two sources of power which func-
After March 31, 2000, each new, re- tion so that failure of one source does
placed, relocated or significantly al- not affect the capability of the other
tered vaporization equipment, lique- source.
faction equipment, and control systems (b) Where auxiliary generators are
must be designed, fabricated, and in- used as a second source of electrical
stalled in accordance with require- power:
ments of this part and of NFPA 59A. In (1) They must be located apart or
the event of a conflict between this protected from components so that
part and NFPA 59A (incorporated by they are not unusable during a control-
reference, see § 193.2013), this part pre- lable emergency; and
vails. (2) Fuel supply must be protected
[Amdt. 193–17, 65 FR 10960, Mar. 1, 2000, as from hazards.
amended by Amdt. 193–18, 69 FR 11337, Mar.
10, 2004] Subpart F—Operations
VAPORIZATION EQUIPMENT
SOURCE: Amdt. 193–2, 45 FR 70405, Oct. 23,
§§ 193.2403–193.2439 [Reserved] 1980, unless otherwise noted.

§ 193.2441 Control center. § 193.2501 Scope.


Each LNG plant must have a control This subpart prescribes requirements
center from which operations and for the operation of LNG facilities.
warning devices are monitored as re-
quired by this part. A control center § 193.2503 Operating procedures.
must have the following capabilities Each operator shall follow one or
and characteristics: more manuals of written procedures to
wreier-aviles on DSK3TPTVN1PROD with CFR

(a) It must be located apart or pro- provide safety in normal operation and
tected from other LNG facilities so in responding to an abnormal operation
that it is operational during a control- that would affect safety. The proce-
lable emergency. dures must include provisions for: