g. Filed Pursuant to: Federal Power located at the downstream end of the date of the notice of ready for
Act 16 U.S.C. 791(a)–825(r). penstock with an installed capacity of environmental analysis.
h. Applicant Contact: John 1,400 kW; (7) an afterbay re-regulating
Spendlove, P.E., Jones and DeMille Magalie R. Salas,
pool formed by a 12-foot-high earth-
Engineering, 1535 South 100 West, filled dam with gates and ditches; (8) a Secretary.
Richfield, UT 84710; (435) 896–8266. 35,000-foot-long, 7.2-kilovolt (kV) [FR Doc. E5–2547 Filed 5–19–05; 8:45 am]
i. FERC Contact: Dianne Rodman distribution and communication line BILLING CODE 6717–01–P
(202) 502–6077, E-mail: from the West Fork dam to the East Fork
Dianne.rodman@ferc.gov. dam and on to the Peterson Plant
j. Cooperating agencies: We are asking powerhouse; (9) a 4,725-foot-long, DEPARTMENT OF ENERGY
Federal, state, local, and tribal agencies 12.47/7.2-kV distribution and
with jurisdiction and/or special Federal Energy Regulatory
communication line from the Peterson Commission
expertise with respect to environmental Plant powerhouse to the Boulder Plant
issues to cooperate with us in the substation; (10) a 100-foot-long, 2,400- [Docket No. AD05–11–000 and ER02–1656–
preparation of the environmental volt transmission line connecting the 000]
document. Agencies who would like to Boulder Plant powerhouse with the
request cooperating status should follow Boulder Plant substation; and (11) other Energy Infrastructure and Investment
the instructions for filing comments appurtenant structures and equipment. in California, California Independent
described in item l below. Garkane proposes to reconstruct the System Operator Corporation; Notice
k. Deadline for requests for West Fork dam to provide storage for of Technical Conference
cooperating agency status: June 28, fishery enhancement. Garkane would May 13, 2005.
2005. increase the height of the dam by 12.5
All documents (original and eight Take notice that the Federal Energy
feet to a new height of 36.5 feet, Regulatory Commission in conjunction
copies) should be filed with: Magalie R.
resulting in a surface area of about 4.8 with California state agencies, will host
Salas, Secretary, Federal Energy
acres and a storage capacity of 54.2 acre- a technical conference on Thursday,
Regulatory Commission, 888 First
feet. Garkane would continue to operate June 2, 2005, to discuss energy
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice the project in run-of-river mode. infrastructure and investment in
require all intervenors filing documents n. A copy of the application is California. The conference will be held
with the Commission to serve a copy of available for review at the Commission in San Francisco, California. The
that document on each person on the in the Public Reference Room or may be conference is scheduled to begin at 9
official service list for the project. viewed on the Commission’s Web site at a.m. (PST) and end at approximately 3
Further, if an intervenor files comments http://www.ferc.gov using the p.m. A separate notice will be issued by
or documents with the Commission ‘‘eLibrary’’ link. Enter the docket the Commission to announce the exact
relating to the merits of an issue that number excluding the last three digits in location and final agenda. FERC
may affect the responsibilities of a the docket number field to access the Commissioners will attend and
particular resource agency, they must document. For assistance, contact FERC participate.
also serve a copy of the document on Online Support at The purpose of the conference is for
that resource agency. FERCOnlineSupport@ferc.gov or toll- the Commission and state officials to
Requests for cooperating agency status free at 1–866–208–3676, or for TTY, discuss with industry representatives
may be filed electronically via the (202) 502–8659. A copy is also available the current and future state of
Internet in lieu of paper. The for inspection and reproduction at the infrastructure development and
Commission strongly encourages address in item h above. investment in California. We look
electronic filings. See 18 CFR You may also register online at forward to an informative discussion of
385.2001(a)(1)(iii) and the instructions http://www.ferc.gov/docs-filing/ the issues to clarify how we can
on the Commission’s Web site (http:// esubscription.asp to be notified via facilitate and enhance a comprehensive
www.ferc.gov) under the ‘‘e-Filing’’ link. email of new filings and issuances collaborative approach to energy
l. This application is not ready for related to this or other pending projects. infrastructure development and
environmental analysis at this time. For assistance, contact FERC Online reliability for California.
m. The existing project consists of: (1) Support. The Commission is now soliciting
The West Fork rock-filled 20-foot-high, o. Procedural schedule and final nominations for speakers at the
30-foot-long diversion dam with amendments: The application will be technical conference. Persons wishing
ungated spillway and gates on the West processed according to the following to nominate themselves as speakers
Fork of Boulder Creek; (2) a buried Hydro Licensing Schedule. Revisions to should do so using this electronic link:
17,600-foot-long, 27-inch-diameter the schedule will be made as http://www.ferc.gov/whats-new/
concrete conduit running from the West appropriate. registration/infra-06-02-speaker-
Fork dam to the East Fork of Boulder Issue Acceptance or Deficiency form.asp. Such nomination must be
Creek; (3) the East Fork earth-filled 29- Letter—June 2005. made before the close of business on
foot-high, 630-foot-long forebay dam Request Additional Information—June May 20, 2005, so that a final agenda for
with an ogee concrete spillway on the 2005. the technical conference can be drafted
East Fork of Boulder Creek; (4) a 22,200- Notice Soliciting Final Terms and and published.
foot-long, 31.5 to 34-inch-diameter steel Conditions—September 2005. Although registration is not a strict
penstock running from the East Fork Notice of the Availability of the EA— requirement, in-person attendees are
dam to the Boulder Plant powerhouse; February 2006. asked to register for the conference on-
(5) the seasonally-operated Peterson Ready for Commission’s Decision on line by close of business on May 31,
Plant powerhouse located about 17,000 the Application—April 2006. 2005 at http://www.ferc.gov/whats-new/
feet below the East Fork dam with an Final amendments to the application registration/infra-06-02-form.asp.
installed capacity of 100 kilowatts (kW); must be filed with the Commission no Transcripts of the conference will be
(6) the Boulder Plant powerhouse later than 30 days from the issuance immediately available from Ace

VerDate jul<14>2003 20:07 May 19, 2005 Jkt 205001 PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 E:\FR\FM\20MYN1.SGM 20MYN1
Federal Register / Vol. 70, No. 97 / Friday, May 20, 2005 / Notices 29305

Reporting Company (202–347–3700 or This event is posted on the ENVIRONMENTAL PROTECTION


1–800–266–6646) for a fee. They will be Commission’s calendar located at AGENCY
available for the public on the http://www.ferc.gov/EventCalendar/
[OAR–2005–0118, FRL–7915–3]
Commission’s eLibrary system and on EventsList.aspx along with other related
the calendar page posting for this event information. For additional information Agency Information Collection
seven calendar days after FERC receives and site visit itinerary, please contact Request Activities: Proposed
the transcript. Additionally, Capitol the Commission’s Office of External Collection and Comment Request for
Connection offers the opportunity for Affairs at 202–502–8004. the Outer Continental Shelf Air
remote listening of the conference via Regulation; EPA ICR Number 1601.06,
Real Audio or a Phone Bridge Magalie R. Salas,
OMB Control Number 2060–0249
Connection for a fee. Persons interested Secretary.
in making arrangements should contact [FR Doc. E5–2541 Filed 5–19–05; 8:45 am] AGENCY: Environmental Protection
David Reininger or Julia Morelli at Agency (EPA).
BILLING CODE 6717–01–P
Capitol Connection (703–933–3100) as ACTION: Notice.
soon as possible or visit the Capitol
Connection Web site at http:// SUMMARY: In compliance with the
DEPARTMENT OF ENERGY Paperwork Reduction Act (44 U.S.C.
www.capitolconnection.org and click on
‘‘FERC.’’ 3501 et seq.), this document announces
Federal Energy Regulatory
As mentioned above, additional that EPA is planning to submit a
Commission
details on the conference, including the proposed and continuing Information
agenda, will be included in a Collection Request (ICR) to the Office of
[Docket No. PR05–8–000] Management and Budget (OMB). This is
supplemental notice to be issued at a
later date. You are encouraged to watch a request to renew an existing approved
Northwest Natural Gas Company; collection which is scheduled to expire
for additional notices. Notice of Technical Conference
For additional information, please on June 30, 2005. Before submitting the
contact Sarah McKinley at 202–502– May 13, 2005. ICR to OMB for review and approval,
8004, sarah.mckinley@ferc.gov. EPA is soliciting comments on specific
Take notice that a technical aspects of the proposed information
Magalie R. Salas, conference will be held on Tuesday, collection as described below.
Secretary. May 24, 2005 at 1 p.m., Eastern Time, DATES: Comments must be submitted on
[FR Doc. E5–2555 Filed 5–19–05; 8:45 am] in a room to be designated at the Federal or before July 19, 2005.
BILLING CODE 6717–01–P Energy Regulatory Commission, 888 ADDRESSES: Submit your comments,
First Street NE., Washington, DC 20426. referencing docket ID number OAR–
The purpose of the conference is to 2005–0118, to EPA online using
DEPARTMENT OF ENERGY address Northwest Natural Gas EDOCKET (our preferred method), by e-
Federal Energy Regulatory Company’s (Northwest) section 311 mail to a-and-r-Docket@epa.gov, or by
Commission petition for rate approval filed on mail to: EPA Docket Center,
January 18, 2005. Northwest should be Environmental Protection Agency, Air
[Docket No. CP05–92–000] prepared to discuss return on equity and and Radiation Docket, 6102T, 1200
operating statements issues. Pennsylvania Ave., NW., Washington,
Liberty Gas Storage, LLC; Notice of DC 20460.
Site Visit for the Proposed Liberty Gas FERC conferences are accessible
FOR FURTHER INFORMATION CONTACT:
Storage Project under section 508 of the Rehabilitation
David Sanders, Ozone Policy and
Act of 1973. For accessibility
May 12, 2005. Strategies Group, Mail Drop C539–02,
accommodations please send an e-mail Environmental Protection Agency, 109
The staff of the Federal Energy to accessibility@ferc.gov or call toll free
Regulatory Commission is issuing this T.W. Alexander Drive, Research
(866) 208–3372 (voice) or 202–208–1659 Triangle Park, North Carolina 27711;
notice to announce the date and
(TTY), or send a FAX to 202–208–2106 telephone number: (919) 541–3356; fax
location of a site visit for the proposed
with the required accommodations. number: (919) 541–0824; e-mail address:
Liberty Gas Storage Project in Calcasieu
and Beauregard Parishes, Louisiana. The All interested parties and staff are sanders.dave@epa.gov.
project consists of two natural gas permitted to attend. For further SUPPLEMENTARY INFORMATION: The EPA
storage caverns; four injection and information please contact Aileen Roder has established a public docket for this
withdrawal wells, two compressor at (202) 502–6022 or e-mail ICR under Docket ID number OAR–
stations, approximately 1.3 miles of 20- aileen.roder@ferc.gov. 2005–0118, which is available for public
inch-diameter pipeline, approximately viewing at the Air and Radiation Docket
Magalie R. Salas, in the EPA Docket Center (EPA/DC),
23.3 miles of 30-inch-diameter pipeline
with associated facilities and four Secretary. EPA West, Room B102, 1301
meter/regulator stations. [FR Doc. E5–2548 Filed 5–19–05; 8:45 am] Constitution Ave., NW., Washington,
The site visit will be held on BILLING CODE 6717–01–P DC. The EPA Docket Center Public
Wednesday May 18, 2005, starting at Reading Room is open from 8:30 a.m. to
7:30 a.m. (CST) from the Best Suites, 4:30 p.m., Monday through Friday,
401 Lakeshore Drive, Lake Charles, excluding legal holidays. The telephone
Louisiana. The site visit will include an number for the Reading Room is (202)
aerial over flight followed by a ground 566–1744, and the telephone number for
inspection of the project. Anyone the Air and Radiation Docket is (202)
interested in participating in the site 566–1742. An electronic version of the
visit may attend, but all participants public docket is available through EPA
must provide their own transportation. Dockets (EDOCKET) at http://

VerDate jul<14>2003 20:07 May 19, 2005 Jkt 205001 PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 E:\FR\FM\20MYN1.SGM 20MYN1

You might also like