Professional Documents
Culture Documents
IBM Business
Consulting
Consulting
Services
Services
Disclaimer
(Optional location for any required disclaimer copy.
To set disclaimer, or delete, go to View | Master | Slide Master)
Disclaimer
(Optional location for any required disclaimer copy.
To set disclaimer, or delete, go to View | Master | Slide Master)
Product Flow
Demand
Financial Human
Control Resources
Information
Flow
Supply Chain Management: The delivery of enhanced customer and economic value
through management of the flow of physical goods and
associated information.
4 Aditya Birla Management Corporation Limited – Corporate IT
Overview of Production Planning
Planning process
Execution process
Sales Info Procurement
System
CO/PA
Inventory Costing
Capacity Planning
Reporting and Analysis (e.g. Logistics Information System, Order Information System)
Disclaimer
(Optional location for any required disclaimer copy.
To set disclaimer, or delete, go to View | Master | Slide Master)
PP-PI Standard PP
BOM
Master Recipe
Routing
Production
Process Order
Order
Master Data
- Material Master
Disclaimer
(Optional location for any required disclaimer copy.
To set disclaimer, or delete, go to View | Master | Slide Master)
The material master file contains the data and parameters that define each
material used in an SAP. The information relevant to a particular organisational
unit for a specific material is defined in a separate view of that material.
Key Terms
- Batch Management
- MTO
- MTS
- Backflush
- Variant Configuration
- MRP Controller
- Valuation class
Inventory
Quality
Sales Information
Production Information Foreign MRP Accounting
Desc:---------------------
Trade
Product - Ad_bboot_fs
Plant/Storage
Location
Stock
10 Aditya Birla Management Corporation Limited – Corporate IT
Material Type / Industry Sector
Chemical
Retailing
Industry
Inventory
Purchasing
Desc:---------------------
Inventory
Purchasing
Inventory Desc:---------------------
Quality
Sales Information
Production Information Spare Part 172
Desc:---------------------
Finished Product -
Ad_bboot_fs Inventory
Quality
Sales Information
Production Information
Desc:---------------------
Semi-Finished 423
Price Control
Indicator
Default Item
Field Reference Category Group
FERT
HALB
What Views are MATERIAL Account
Allowed? TYPE Assignment
HAWA
ROH
Factors that can influence field selection for material master records are:
- Transaction
- Procurement indicator
- Material type
- Plant
- Industry sector
The material master is the central master “record” for logistics.
A material master is broken down into views.
Data in the material master is defined at different organisational levels including client,
plant, storage location, etc.
The material type controls such things as number assignment and which views are
allowed.
The industry sector controls field selection in the material master.
Material statuses can be defined to control processing allowed for a given material,
some examples include:
- Whether a product can be purchased
- Whether a product can be used in a production order
- Whether inventory movements can be carried out for a material
The base unit of measure is the unit in which the stocks of the material are
managed. All quantities which are entered in other units of measure are
converted to the base unit. Other units of measure include: order unit, unit of
issue, sales unit, and delivery unit.
Data in the material master can be changed immediately or the change can be
planned and then activated on a future date. Changes can be made with or
without reference to a change number from Engineering Change
Management.
A material can be displayed in its current status or in its status on a key date.
Master Data
- Bills of Material
Disclaimer
(Optional location for any required disclaimer copy.
To set disclaimer, or delete, go to View | Master | Slide Master)
HEADER
– Status
– Texts
– Usage
...
ITEM
–Co-product
–Scrap
–MRP data
–Recursiveness
...
Plant Maintenance
–Maintenance plan
Controlling –Maintenance order
–Product costing
–Unit costing Production
–Standard costing
–Material requirements planning
–Planned orders
–Production orders
Material BOM
Material
Master
Record
Material
Equipment BOM
Equipment
Master
Record
Equipment
Document BOM
Document
Document
Information
Record
Document
2
7
Validity Period
Low-
Level
Hyundai Excel Code
M5-HRH01 0
Construction/
Technical Data
Costing/Price
Plant
BOM Maintenance/
Location Data
Production/
Operations
Sales
Sales/ Order
Order Quantity
Stock Items L
Non-Stock Item N
Master Data
- Resource
Disclaimer
(Optional location for any required disclaimer copy.
To set disclaimer, or delete, go to View | Master | Slide Master)
Resource
Scheduling Data
Default Values Costing and Available
for Task Lists Data Capacity
2724,00
1200,00
124,00
4048,00
EXHAUST
LYE AND WATER
SCREW CONVEYER CARBON DISULFIDE
PROCESS STARTS
HERE PRESS LYE TANK COOLING CHILLED
DEVICE WATER
HOT WATER
AIR
SLURRY
MIXER
SILO BLOWER ROTARY VALVE
XANTHATOR DRUM
HOMOGINIZER
PULP FEEDER
CONVEYER
CHILLED
FLASH DEARATOR WATER
DISSOLVER TANK
VACUUM PUMP
P2 TANK P2 TANK
CHILLED WATER
DISINTEGRATOR
SPINNING VISCOSE
TANK
INTERMEDIATE
TANK
RECEIVING RECEIVING
CHILLED TANK TANK
WATER
TO SPINNING
MACHINE
PRE FILTER FINAL FILTER
(TWO STAGE)
REJECT REJECT
28 Aditya Birla Management Corporation Limited – Corporate IT
Resource Usage
Only Routings
Routing
Only Networks
Network
Basic
Basic Data Data • Name and description
• Standard value key
• Performance efficiency rate
Default Values
Default Values for • Control key
• Standard text key
Task Lists • Wage data
Assignment
Costing Data and • Cost center
• Activity types
HR System Data • Formula key
Scheduling
Scheduling Data • Capacity category
• Interoperation times
• Formula key
Capacity
Capacity Data • Available capacity
• Formula key
• Utilisation
| Aditya Birla Management Corporation Limited – Corporate IT
Relationship Between Resource and Operation
Default Values
Operation 10
Activity Types
Resource List
Resource Capacity
Resource Hierarchy
Resource
Where-Used List
Capacity
| Aditya Birla Management Corporation Limited – Corporate IT
Process Industries
Chapter 2 - Resources
Master Data
- Master Recipe
Disclaimer
(Optional location for any required disclaimer copy.
To set disclaimer, or delete, go to View | Master | Slide Master)
Header
Structure Operations
Phases
Resource
Recipe Header
Material List
Operations
Resource Allocations
Phases Mat
----- ------ -------
Material
Components
Relationships
Inspection Characteristics
| Aditya Birla Management Corporation Limited – Corporate IT
Elements of a Recipe
Resource
Header
Requirements
Recipe
Procedure Materials
Resource
Header Require- • Resource Network
ments
• Recipe Usage
Recipe • Recipe Status
Procedure Materials
• Planner Group
• Charge Qty Range
• Administrative Data
Resource
Header Require-
ments
Op. 100
Recipe
Procedure Materials Ph. 110 Ph. 120
Op. 200
PP-PI uses a master recipe in the same sense that standard PP uses a
routing.
The master recipe describes the production of materials with detailed
information on the process. It is the basis for the process order.
Multiple master recipes can be combined in recipe groups to represent the
possible alternative process flows. Recipes are not material dependent.
A master recipe contains an operation overview (routing) as well as a material
list (BOM).
Recipe Group
50000044 / 1
Recipe
Plants,
M1 M2 ...
Material
Production
V11 V12 ... V21 V22 ...
Version
Operation 10
Mat
----- ------ -------
----- - ----- --
------- ------- ---------
Material
Phase 10/10
PreBurning
Phase 10/20
Burning
Phase 10/30
Cooling
Operation 20
Operation 10
Phase 21 Phase 22
Extraction Preheating
Operation 20
Time
Default Values
Activity Types
Operation 10
Standard Value
Key
Standard Value
Verification
Disclaimer
(Optional location for any required disclaimer copy.
To set disclaimer, or delete, go to View | Master | Slide Master)
At the end of this session You will understand the Process order
processing functionality in PP-PI :
What is Process order
Ways of creating Process Orders
Process Order Structure
Operations, Component & Phases
Independent
Goods Issue
Requirements
Sales/Distribution
Sales Requirements
MRP Process Order
Material Forecast
Preliminary Planning Rough-Cut Detailed Planning
Capacity Planning
Conversion to Conversion to
Process Order Process Order
Costing
| Aditya Birla Management Corporation Limited – Corporate IT
Process Orders and Organisational Structures
Organisational Units
Company
Controlling Areas
Company Codes
• Demand management
Valuation Areas
• MRP
• Production control
Storage Locations/Batches/Special Stock
• Inventory management
| Aditya Birla Management Corporation Limited – Corporate IT
Ways of Creating a Process Order
Criteria for
the Selection
of a Master
Recipe
Initial Screen Main Header Material/recipe Operation
allocation Overview
Quantity
Material Charge quantity
Order Start
Order Type Date Key date
Usage
Status
Selection Criteria:
Criteria
Usage
Status of
the Master
Recipe
PO
PO Header
Material List
Operations
Resource Allocations
Phases
Material
Relationships
Costs
Inspection charact.
PO
Definition
PO Header Product or service to be
produced with the recipe
Operations Origin
Manually
Master recipe
Phases
Resource
Allocations
Mat
----- ------ -------
Material
----- - ----- --
------- ------- ---------
Components Material
Costs
Relationships
PO Definition
PO Header Materials necessary to carry
out an operation (phase) or
manufacture a product
Components
----- ------ -------
----- - ----- --
------- ------- ---------
Material
Costs • Manually
• Master recipe
Relationships
| Aditya Birla Management Corporation Limited – Corporate IT
Material Component Data in the Process Order
• Material number
• Material description
Long Text • Text editor
Component • Requirement quantity
Overview
Operation • Requirements date
Charge • Formulas
Calculation • Quantities
PO Definition
PO Header Individual step in the
processing of a process order
Operations Origin
Manually
Master recipe
Phases
Resource
Allocations
Mat
----- ------ -------
----- - ----- --
------- ------- ---------
Material
Material
Components
Costs
Relationships
Operation Dates
• Confirmed dates
• Earliest/latest dates
PO
Definition
PO Header
Receiver of the process order
costs (settlement receiver)
Operations Types
Material
Phases Cost center
Resource CO process order
Allocations Mat
----- ------ -------
----- - ----- --
------- ------- ---------
Material
Material Origin
Components
Manually
Costs
Automatically
Relationships
Planned Order
Material Withdrawal
MM Completion Confirmation
SD Archive / Delete
Master
Operation 1 Material
Create
Inspection Master
Inspection Lot
Quality
Characteristics Management
Phases
Inspection
Characteristics
Material Recipe
Component
Inspection
Characteristics Inspection
Characteristics
Unplanned
Inspection
Characteristics
Thank You
Disclaimer
(Optional location for any required disclaimer copy.
To set disclaimer, or delete, go to View | Master | Slide Master)