Professional Documents
Culture Documents
Email: info@peridotec.com
Web: http://www.peridotec.com
Production Management System
For Spinning Mills
Introduction
Features
Shift’s Schedule
Shift’s Schedule and their Timings can be defined from this screen
Production History
This Graph shows total production in terms of lbs Produced in each
Production Group
Machine Faults
For More Reports and Information regarding this system please contact Peridot Technologies (Pvt.) Ltd. Or
Visit http://www.peridotec.com