ADM 217 PROJECT MANAGEMENT

ACKNOWLEDGEMENT

COLLEGE MCS 1
ADM 217 PROJECT MANAGEMENT

1.0 Acknowledgement
Bissmillahirrahmanirrahim.

Alhamdulillah. Thanks to Allah SWT, that with His willing gives us the opportunity to complete
this Final Assignment. This assignment was prepared for Computer Principles subject.

First and foremost, we would like to express our deepest thanks to our beloved lecturer and also
as guidance, Miss Faradila for the valuable guidance and advices. We also would like to thank
her for showing us some good example that related to the assignment.

Besides that, our deepest thanks and appreciation our parents, family, special mate of us, and
others for their cooperation, encouragement, constructive suggestion and full of support for the
assignment completion, from the beginning till the end. Also thanks to all of classmate, DITM
Group 4 and everyone, that has been contributed by supporting our work and helps us during the
assignment progress till it is fully completed.

Last but not least, our thanks to MCS College, for great facilities and accommodations that have
been provided. Without helps of the particular that mentioned above, we could face many
difficulties while doing this assignment.

COLLEGE MCS 2
ADM 217 PROJECT MANAGEMENT

INTRODUCTION

COLLEGE MCS 3
ADM 217 PROJECT MANAGEMENT

2.0 Introduction about company

Event Management Sdn Bhd

Company Name : EVENT MANAGEMENT SDN. BHD.

Address : An Event Management Sdn Bhd


No. 3, Jalan 14/53
46100 Petaling Jaya
Selangor Darul Ehsan, Malaysia

Fax. No. : 03-5353 3535

Website Address : http://www.an-event.com/

Email Address : contact@an-event.com

COLLEGE MCS 4
ADM 217 PROJECT MANAGEMENT

2.1 Company Background


An Event Management Sdn Bhd was formed in July 1999 in Kuala Lumpur, Malaysia, with the
goal of organizing memorable events and help clients to effectively promote their messages.
With more than 10 years of collective working experience in the events, media, and advertising
industries, we set to design and organize events for our clients that help them achieve their
targets best.

An Event Management Sdn Bhd is a leading company in Malaysia, organizing quality, unique


and cost-effective events. With the constant introduction of new trends, the integrated events
solutions we provide, and the ability to operate in Malaysia and in many other countries, we
strive to provide our clients with the best service they can expect.

Our company has been given hired by the well known automotive company, Yamaha to conduct
motorcycle exhibition, to launch their new motorcycle Yamaha 135LC. With our experience in
the management event in few years, we sure can do our best to accomplish this task.

COLLEGE MCS 5
ADM 217 PROJECT MANAGEMENT

2.2 Project Title


My project is launching Yamaha 135LC Extreme Spirit

COLLEGE MCS 6
ADM 217 PROJECT MANAGEMENT

2.3 Project Venue


CONCORDE HOTEL SHAH ALAM
3 Jalan Tengku Ampuan Zabedah C9/C, 40100 Shah Alam,
Selangor Darul Ehsan, Malaysia

We choose this place because that place is suitable and have many facilities, lower cost, and easy
to get there.

COLLEGE MCS 7
ADM 217 PROJECT MANAGEMENT

2.3.1 How To Get There

COLLEGE MCS 8
ADM 217 PROJECT MANAGEMENT

2.4 Project Date


December 21rd, 2010

We have chosen this date for this event because it is holiday time

2.5 Project Cost


Our cost for this event is RM 50,000,that include :

 Management hotel
 Rental accommodation
 Activities management
 Set of eating and drinking
 PA System
 VIP and VVIP
 Present

2.6 Objectives of this event


 To introduce latest Yamaha product to market
 To attract costumer
 To increase the usage of Yamaha product
 To support international Automotive
 Give our customer know the new news about company

COLLEGE MCS 9
ADM 217 PROJECT MANAGEMENT

CONTENT

COLLEGE MCS 10
ADM 217 PROJECT MANAGEMENT

3.0 CONTENTS

3.1 Project Name Description

This report should briefly describe the whole project.

1. Why did you do this project?

a) Scope
 Our companies want give the best rating about motor to public
 Focus to teenagers that like the new brand motor
 To public that want save they petrol used

b) Objective
 To introduce latest Yamaha product to market
 To attract costumer
 To increase the usage of Yamaha product

c) Goals
 To increase people to use the Yamaha 135LC motor model
 To make people understand the benefit use Yamaha Motor

COLLEGE MCS 11
ADM 217 PROJECT MANAGEMENT

2. What did you produce?

a) Service or product
 For this project, we use service to promote client new product to people.

b) Documentation / User Manual for use the product or service


 On this project, our client just listening from us about what kind of service we
use to promote their product and they suggest to us other alternatives.
 We use:
 Banner
 Pamphlet
 Poster
 Media & Electronic

3. Was the project a success or not?


a) Project status (success or not)
 Yes, this project was successful

b) Give the reason why project status success or not.


 This project was successful because, all our team in this project give they best
service and support to make this project success and we also had sponsor that
also support us.

COLLEGE MCS 12
ADM 217 PROJECT MANAGEMENT

4. What project management tools did you use, and did they help?

 The project management we use in this project is Microsoft Project Gantt Chart, its
easy to use and better to manage our plan to make this event is up to date and success.
 We also use other Microsoft tools like:
 Microsoft Word 2007
 Microsoft Excel 2007
 Microsoft Power Point 2007

5. What went right on the project?


 The went right is the project has successful done on the date and and all plan is
working

6. What went wrong on the project?


 This project required many people to manage its and make all plan is working on
date.
 Each of project member have to do more than one task to complete this event

7. What did you learn by working on this project?


 Our team project learn how to manage some project and cooperate with each other
 We know, learn and improve our skill to use Gantt Chart Project 2007
 We learn and know how to plan and manage some project

COLLEGE MCS 13
ADM 217 PROJECT MANAGEMENT

Schedule:

ACTIVITY START DATE END DATE DURATION


(DAYS)
Make project team 4/10/2010 4/10/2010 1
Identify the event 5/10/2010 6/10/2010
launching 2
Specified event time 7/10/2010 8/10/2010 2
Survey the venue 11/10/2010 14/10/2010 4
Identify the budget 20/10/2010 21/10/2010 2

Booking venue 25/10/2010 26/10/2010 2


Planning to invite 27/10/2010 29/10/2010
sponsor and VIP 3
Plan the contest and 1/11/2010 2/11/2010
quiz 2
Discuss the schedule 3/11/2010 4/11/2010 2
Booking invitation 5/11/2010 8/10/2010
card, banner. 4
Promote the event 9/11/2010 12/11/2010 4
Discuss transportation 15/11/2010 15/11/2010 1
Identify hotel 16/11/2010 17/11/2010
accommodations 2
Plan the gift and 18/11/2010 19/11/2010
souvenir 2
Planning the tentative 22/11/2010 25/11/2010
program 4
Meet the hotel 26/11/2010 26/11/2010 1
management
Preparation the event 6/12/2010 17/12/2010 12

Launching day 21/12/2010 21/12/2010 1

Sent report 28/12/2010 28/12/2010 1

3.2 Scope Statement


COLLEGE MCS 14
ADM 217 PROJECT MANAGEMENT

Prepared by: Norharyani Binti Mohd Solehudin.

Project Title: Yamaha 135LC Extreme Spirit


Date: 21/12/2010

Project Justification:
Our company an Event Management SDN BHD will be fully responbility to do motor show for
Yamaha to promote their new motorcycle. This event theme is Yamaha 135LC Extreme
Spirit,we choice it because its suitable with the new Yamaha motorcycle product.

Product Characteristics and Requirements:

 Decoration place, food and stage.


 Promotion.
 Requirement material for motor show.
 Media

Summary of Project Deliverables:

Project management-related deliverables:


Business case, charter, team contract, scope statement, WBS, schedule, cost baseline, status
reports, final project presentation, final project report, lessons-learned report, and any other
documents required to manage the project.

Product-related deliverables:
Research reports, design documents, software code, hardware, etc.
1. Microsoft Word
2. Microsoft Project
3. Microsoft Power Point
4. Microsoft Publisher

Project Success Criteria:


With the good planning and strategies to do this event,we believe can do the best work and good
quality for our client.

3.3 Project Charter

COLLEGE MCS 15
ADM 217 PROJECT MANAGEMENT

Project Title : Yamaha 135LC Extreme Spirit

Project Start Date : 2010 Projected Finish Date : 21 DECEMBER 2010

Budget Information : RM 50, 000

Project Manager : Juladi Bin Murkim.

Project Objectives :

 To introduce latest Yamaha product to market


 To attract costumer
 To increase the usage of Yamaha product
 To support international Automotive
 Give our customer know the new news about company

Approach:

…………………………..
(JULADI BIN MURKIM)

PROJECT MANAGER

Roles and responsibilities

COLLEGE MCS 16
ADM 217 PROJECT MANAGEMENT

Name Position Role Contact No.


PROJECT Leader for project and
event, ensure the
JULADI BIN MANAGER 019-8735264
program run
MURKIM successfully.
ASSISTANT
Help the leader for
NOOR NADIATUL PROJECT
project, and deal with
HUSNA BINTI MANAGER any problem 013-2369571
MOHD HALIL

NORHARYANI FINANCIAL Manage account and


BINTI MOHD MANAGER budget for the event 012-9256105
SOLEHUDIN

MUHD AMIRUL PROTOCOL Service and booking


BIN AHMAD BUREAU place 017-6547238
SAKRANI

MUHSIN BIN PROMOTION Survey and give 012-6732821


BAHARUDIN BUREAU present
Furniture for event,
MUHD ASYRAF LOGISTIC BUREAU manage food and 016-3482489
equipments
Prepared agenda and
MUHD YAZID OPERATIONAL letters 014-2358910
MANAGER

Sign-off : (Signature of all above stakeholders. Can sign by their names in table above.)

Comments : (Handwritten or typed comments from above stakeholders, if applicable.)

3.4 Organizational Chart

COLLEGE MCS 17
ADM 217 PROJECT MANAGEMENT

Project Manager
Juladi Bin Murkim

Assistant Project Manager


Noor Nadiatul Husna Binti
Mohd Halil

Protocol Bureau Financial Manager


Muhd Amirul Bin Ahmad Norharyani Binti Mohd
Sakrani Solehudin Sakrani

Operational Manager Promotion Bureau Logistic Bureau


Muhd Yazid Muhsin Bin Baharudin Muhd Asyraf
MUHD ASYRAF

Yamaha 135LC Extreme Spirit

Prepared by: Noor Nadiatul Husna Binti Mohd Halil

(Assistant Project Manager)

COLLEGE MCS 18
ADM 217 PROJECT MANAGEMENT

3.5 Team contract


Project Name : Yamaha 135 LC Extreme Spirit

Project Team Members Names and Sign-off:

No. Name Sign-off on Team Contract


1 Juladi bin Murkim
2 Noor Nadiatul Husna Bt Mohd Halil
3 Norharyani Bt Mohd Solehudin
4 Muhd Amirul Bin Ahmad Sakrani
5 Muhsin Bin Baharudin
6 Muhd Yazid
7 Muhd Asyraf

Code of Conduct: As a project team, we will:

 We hope so that this project runs successfully.


 We hope so that this project did not happene any experiance

Participation: We will:

 Arrive on time and end on time


 Pay attention. Everyone has the responsibilities

Communication: We will:

 We hope so that can interact nicely with the team work.


 Be frank, honest & sincere.

Problem Solving: We will:

 Attach to the topic at hand


 The team speaks with one voice after the decision is made

3.6 Kickoff Meeting

COLLEGE MCS 19
ADM 217 PROJECT MANAGEMENT

Yamaha 135LC Extreme Spirit


Meeting 1
06 September , 2010

Meeting Objective :

 Define the vision, mission, goal, and objective.


 Create community members.

Members present : Positions :


 Juladi Bin Murkim Project Manager
 Noor Nadiatul Husna Bt Mohd Halil Assistant manager
 Norharyani Bt Mohd Solehudin Financial Manager
 Muhd Amirul Bin Ahmad Sakrani Protocol Bureau
 Muhsin Bin Baharudin Promotion Bureau
 Muhd Asyraf Logistic Bureau
 Muhd Yazid Operational Manager

Agenda:
 Introduction of attendees.
 Background of project
 Review of project-related document (i.e. business case, project request, contract)
 Discussion of project organizational structure
 Discussion of project scope, time, and cost goals
 Discussion of other important topics
 List of action items from meeting

No Action Item Assigned To Due Date


1 Assigned the task to all community Noor Nadiatul Husna
members bt Mohd Halil 6/9/2010
2 Survey event place Muhd Amirul Bin
Ahmad Sakrani 13/9/2010
3 Confirm place event Muhd Amirul Bin
Ahmad Sakrani 14/9/2010

3.6 Kickoff Meeting


COLLEGE MCS 20
ADM 217 PROJECT MANAGEMENT

Yamaha 135LC Extreme Spirit


Meeting 2
15 September , 2010

Meeting Objective :

 Define the vision, mission, goal, and objective.


 Chosen the project crew contract.

Members present : Positions :


 Juladi Bin Murkim Project Manager
 Noor Nadiatul Husna Bt Mohd Halil Assistant manager
 Norharyani Bt Mohd Solehudin Financial Manager
 Muhd Amirul Bin Ahmad Sakrani Protocol Bureau
 Muhsin Bin Baharudin Promotion Bureau
 Muhd Asyraf Logistic Bureau
 Muhd Yazid Operational Manager

Agenda:
 Introduction of attendees.
 Background of project
 Review of project-related document (i.e. business case, project request, contract)
 Discussion of project organizational structure
 Discussion of project scope, time, and cost goals
 Discussion of other important topics
 List of action items from meeting

No Action Item Assigned To Due Date


1 Give task to all community members Noor nadiatu Husnan 2/10/2010
Bin Mohd Halil
2 Invite all VIP Juladi Bin Murkim 4/10/2010
3 Booking place for event Muhd Amirul Bin 15/9/2010
Ahmad Sakrani

3.7 Weekly Status Report (1)


COLLEGE MCS 21
ADM 217 PROJECT MANAGEMENT

Date:

Sept 06th –10nd , 2010 & Sept 13th – 17th, 2010

Project Name:

YAMAHA 135 LC EXTREME SPIRIT

Team Member Name:


Juladi Bin Murkim Project Manager
Noor Nadiatul Husna Bt Mohd Halil Assistant manager
Norharyani Bt Mohd Solehudin Financial Manager
Muhd Amirul Bin Ahmad Sakrani Protocol Bureau
Muhsin Bin Baharudin Promotion Bureau
Muhd Asyraf Logistic Bureau
Muhd Yazid Operational Manager

Work Completed This Week:


 Looking for a date of event
 Identify the budget
 Conformation the place
Work Completed Next Week:

 Received the budget from the sponsor


 Make a meeting for discus the budget with the sponsor
 Make plan the activity for the event.

What’s going well and why:

 After discuss, all accept


 And end the meeting

What’s not going well and why:


 Nothing

Suggestions/Issues:
 Do the first preparation for the event.

Project changes:
 Nothing

3.7 Weekly Status Report (2)

COLLEGE MCS 22
ADM 217 PROJECT MANAGEMENT

Date:

Nov 01th – 05nd , 2010 & Nov 08th – 12th, 2010

Project Name:

YAMAHA 135 LC EXTREME SPIRIT

Team Member Name:


Juladi Bin Murkim Project Manager
Noor Nadiatul Husna Bt Mohd Halil Assistant manager
Norharyani Bt Mohd Solehudin Financial Manager
Muhd Amirul Bin Ahmad Sakrani Protocol Bureau
Muhsin Bin Baharudin Promotion Bureau
Muhd Asyraf Logistic Bureau
Muhd Yazid Operational Manager

Work Completed This Week:

 Discuss with sponsor and VIP


 Discuss the schedule
Work Completed Next Week:
 Booking invitions
 Make a meeting for make a team work for this event
 Promote event

What’s going well and why:

 After discuss, all accept


 And end the meeting
What’s not going well and why:
 Nothing

Suggestions/Issues:
 Nothing

Project changes:
 Nothing

COLLEGE MCS 23
ADM 217 PROJECT MANAGEMENT

3.8 Monthly Progress Report


Date: November 17h, 2010
a. Accomplishments for Month of October:
 Already complete survey the place for the event that will be held.
 Make a budget calculate the item we need for the event

b. Plans for Month of October


 Plan the gift and souvenir
 Planning the tentative program

c. Issues:
 This project in running successfully

d. Project Changes :
 No changes

e. Action taken:
 Done

Date: December 19st , 2010


a. Accomplishments for Month of December :
 We do the final presentation for this project

b. Plans for Month of December :


 Ensure this project run smoothly before that ceremony

c. Issues:
 All the work is in successfully progress

d. Project Changes :
 Nothing changes

e. Action taken:
 Done

3.9 Milestone reports

COLLEGE MCS 24
ADM 217 PROJECT MANAGEMENT

Prepared by: Noor Nadiatul Husna Bt Mohd Halil Date: 28 September 2010

Milestone Date Status Responsible Issues /


Comments
Initiating
Make project team 4/10/2010  Juladi DONE

Identify the event launching 5/10/2010  Nadia DONE

Specified event time 7/10/2010  Nadia DONE

Survey the venue 18/10/2010  Haryani DONE

Planning
Identify the budget 20/10/2010  Haryani DONE

Booking venue 25/10/2010  Haryani DONE

Planning to invite sponsor 27/10/2010  Yazid DONE


and VIP
Plan the contest and quiz 1/11/2010  Mirul DONE

Discuss the schedule 3/11/2010  Nadia DONE

Executing
Booking invitation card, 5/11/2010  Nadia DONE
banner.
Promote the event 9/11/2010  Yazid DONE

Discuss transportation 15/11/2010  Muhsin DONE

Identify hotel 16/11/2010  Juladi DONE


accommodations
Controlling
Prepare the gift and souvenir 18/11/2010  Juladi DONE

Planning the Tentative 22/11/2010  Nadia DONE


Program
Meet the hotel management 26/11/2010  Juladi DONE

Closing
Preparation the event 6/12/2010 DONE
 Muhsin

Launching day 21/12/2010  Juladi DONE

COLLEGE MCS 25
ADM 217 PROJECT MANAGEMENT

Sent report 28/12/2010  Nadia DONE

3.10 Work Breakdown Structure (WBS)

Prepared by: Juladi Bin Murkim Date: 22 December 2010

1.0 Initiating
1.1 Kick of Meeting
1.2 Choose Place
1.3 Request a booking for the place

2.0 Planning
2.1 Planning an event agenda
2.2 Prepare a budget
2.3 Find a sponsor

3.0 Executing
3.1 Design a layout
3.2 Choose sponsor
3.3 Choose a theme
3.4 Confirmed a budget

4.0 Controlling
4.1 See a layout design a stage
4.2 Make sure accommodation don’t have problem
4.3 Control change and update instruction

5.0 Closing
COLLEGE MCS 26
ADM 217 PROJECT MANAGEMENT

5.1 Prepare final work about project


5.2 Prepare for presentation
5.3 Project complete

3.11 Prioritized Risks

Prepared by: Norharyani Bt Mohd Solehudin Date: 22 December 2010

Ranking Potential Risk

1 Difficult to find the sponsor.

2 The employee don’t have a team-worker in finished the task.

3 Artist late come to the concert because traffic jams.

4 The public came to the event not achieved the target.

5 System down because suddenly don’t have electric “black out”

COLLEGE MCS 27
ADM 217 PROJECT MANAGEMENT

CONCLUSION

COLLEGE MCS 28
ADM 217 PROJECT MANAGEMENT

4.0 CONCLUSION
4.1 Lessons Learned Report
Prepared by: Norharyani Bt Mohd Solehudin Date: 22/12/2010
Project Name: Yamaha 135LC Extreme Spirit
Project Sponsor: Yamaha
Project Manager: Juladi Bin Murkim
Project Dates: 24/12/2010
Final Budget: RM 50.000

1. Did the project meet scope, time, and cost goals?


Yes,this project meet our scope,time, and cost. With this event,our company has give the best
rating about motor to public, many teenagers has come to this event. This project run smoothly
and successfully
2. What was the success criteria listed in the project scope statement?

This project catches on which encourages from people present

3. Reflect on whether or not you met the project success criteria?


In this project, our company has been developing a development that has primary responbility for
providing leadership to accomplish the project objectives. Our project has meet the project success
criteria.

4. In terms of managing the project, what were the main lessons your team learned?

All team member must do their work and cooperate with each other

5. Describe one example of what went right on this project.


The went right is the project has successful done on the schedule and and all plan is
working perfectly.

6. Describe one example of what went wrong on this project.


This project require many workers to make it succesfull. The media also take over the event by
over reacting

7. What will you do differently on the next project based on your experience working on
this project?

COLLEGE MCS 29
ADM 217 PROJECT MANAGEMENT

We will make our next project more better and more succesfull

4.2 Advantages of This Event

These advantages are:

 We have success manage the event without big error

 With this event, we have successfully promoting the Yamaha product to public.

 Automotive industry will have opportunity to increase revenue.

4.3 Disadvantages of This Event

These disadvantages are:

 Some people come just to enjoy with the motor show

 Lot of garbage around event place

 Traffic jam happen because lots of people come

4.4 Suggestion Improving Future Event


 Encourage the local automotive to improve their product

 Using new features and technology to make event more interesting and power

 Make more activities and show in event make people interested to come to event.

COLLEGE MCS 30
ADM 217 PROJECT MANAGEMENT

APPENDICES

COLLEGE MCS 31
ADM 217 PROJECT MANAGEMENT

5.1 Gantt Chart

COLLEGE MCS 32
ADM 217 PROJECT MANAGEMENT

5.2 Network Diagram

COLLEGE MCS 33
ADM 217 PROJECT MANAGEMENT

COLLEGE MCS 34
ADM 217 PROJECT MANAGEMENT

5.3 Report (Cost and Resources)


SOURCE EXPECTED BUDGET
RESOURCE
Yamaha RM 50 000
TOTAL RM 50 000
OUTLOWS
PA System RM 2 000
Staging and prop production RM 6 000
Light producing production RM 2 000
Catering
Hotel cost RM 5 000
Food cost RM 5 000
Promoting and marketing
Invitation RM 5 000
Advertising RM 5 000
Sourvenir
VVIP RM 5 000
VIP RM 5 000
Security and safety
Fire marshall RM 10 000
TOTAL RM 50 000

5.4 Resource Sheet

COLLEGE MCS 35
ADM 217 PROJECT MANAGEMENT

5.5 Relevant Documents


 Letters of Apply Sponsor.

COLLEGE MCS 36
ADM 217 PROJECT MANAGEMENT

An Event Management Sdn Bhd


No. 3, Jalan 14/53
46100 Petaling Jaya
Selangor Darul Ehsan, Malaysia

Digi Berhad (Company No. 167469-A)


Menara Digi,
No.82, Jalan Raja Muda Abdul Aziz,
50300 Kuala Lumpur,
Malaysia. 22 nd October 2010

Dear Sir/Madam,

Apply for Sponsorship

I would like to ask some contribution from you for our event. The main objective of this concert is for
the purpose of charity besides launching Search new comeback album. The name of the event is
“YAMAHA 135LC EXTREME SPIRIT”.

2. Below are the details of this program:

Date: 21st December 2010

Time: 8:30 a.m - 05:00 p.m

Venue: Concorde Hotel Shah Alam

3. For your information, our program will be held on half days I hope you will interest to contribute
to our program and become one of sponsors for this program.

COLLEGE MCS 37
ADM 217 PROJECT MANAGEMENT

I hope to hear from you soon. Thank you for your co-operation.

Yours faithfully,

…………………………

(Juladi Bin Murkim)

Project Manager

 Letters of Inquiry.

COLLEGE MCS 38
ADM 217 PROJECT MANAGEMENT

An Event Management Sdn Bhd


No. 3, Jalan 14/53
46100 Petaling Jaya
Selangor Darul Ehsan, Malaysia

Manager,
Concorde Hotel Shah Alam
3 Jalan Tengku Ampuan Zabedah C9/C, 40100 Shah Alam,
Selangor Darul Ehsan, Malaysia 22 nd October 2010

Rent for Concorde Hotel Shah Alam

I would like to rent the Concorde Hotel Shah Alam around one day at 21st December 2010.

2. For your information, our company wants to make a charity concert. We want use this place
from 8.30 a.m until 05.00p.m.

Thanks for your co-operation and we very appreciate it.

Yours faithfully,

…………………….

(Juladi Bin Murkim)

Project Manager

COLLEGE MCS 39
ADM 217 PROJECT MANAGEMENT

REFERENCES

6.0 Reference
COLLEGE MCS 40
ADM 217 PROJECT MANAGEMENT

6.1 Book/ Magazines


 Galaxy.

 Manga.

 Ha!

 Maskulin.

 Remaja.

6.2 Internet
 http://www.digi.com.my/

 http://ms.wikipedia.org/wiki/Search

 http://www.yamaha.com/

 http://www.ntv7.com.my/

COLLEGE MCS 41