Introduction

• Integrated Final Project (IFP) is the most


important report that should be prepared
by the Final Year Students of AP119
program.
• The group has to study and analyze from a
maintenance organization/ company
manage in a case study building.
• The group shall relate the data with their
knowledge in how to build a well
maintenance organization. At the end of
this study, the students be able to identify
the strength and weakness of the
organization that may emphasis to the
property maintenance management.

2
Objectives

The objectives of the project are to:


• Delivered the understanding on the
importance of the property maintenance
management.
• Learn and analyze through the data
collection on the multi-disciplinary approach
in maintenance.
• Prepare a scientific technical report of any
commercial building.
• Be able to communicate, work in the team,
present the report and research to the
audience.

3
Task
• Currently, a green building approach has widely implemented as to reduce a
carbon footprint as to support a sustainable agenda by the Government of
Malaysia. In fact, according to GBI (2015), a Green building focuses on
increasing the efficiency of resource use – energy, water, and materials –
while reducing building impact on human health and the environment
during the building’s lifecycle, through better sitting, design, construction,
operation, maintenance, and removal.
• Hence, in a team of 4-5 person, you are required to carry out the overall
maintenance analysis and produce a technical report of the property that
adapt the advanced technology in supporting the building operation.
• Case study requirements:
a)The building must be AT LEAST Certified Green Building by GBI with
minimum one (1) years operation; OR
b)The building must be large Building (Large scale building i.e commercial
building with inclusive of shopping mall, factory or etc.) and equipped
with advanced technology with minimum 2 years operation OR
c) Medium rise buildings (6 storeys and above i.e office building, institution
building, hotel or etc.), and equipped with advanced technology with
minimum 2 years operation
AND
subject to approval by IFP Coordinator.

4
Contents

NO. CONTENT EXPECTED SUBMISSION


PAGES DATE
1. The Detail Of The Property min. 10 pages
2. Organizational / Maintenance Management min. 10 pages
3. Maintenance Policy and Planning min. 10 pages 1ST Stage (W5)
4. Building Design and Technology Design min. 15 pages
5. Condition Assessment Of the Building min. 15 pages 2nd Stage (W8)
6. Maintenance Strategy min. 10 pages
7. Legal Aspect min. 5 pages
8. Financial Analysis min. 10 pages
9. Problems and Recommendation min. 3 pages
10. Conclusion min.2 page 3rd Stage (W12)
Presentation / VIVA / Final Submission (W13)

5
Assessment

The grading will be based on the standard grading


system adopted by the department and the
percentage are as follow:

o Interim Progress Presentation 30%


❖ 1st stage submission/presentation : 10 %
❖ 2nd stage submission/presentation : 10 %
❖ 3rd stage submission/presentation : 10 %

o Final Report (Written) 50%


o Final Presentation (VIVA) 20%

TOTAL OVERALL 100%

6
Other Requirements
• Report must be in standard format A4, 1 ½ spacing,
font 12 (Times New Roman) and pages number
minimum 90 pages.
• After the panels satisfy with the report and
presentation, the students are allowed to bind the
report in hard cover binding (navy blue black).
• The group shall be 4-5 students in a group and will
be consulted by a supervisor given.
• The group should search a building themselves and
follow the building criteria:.
1) The building is a commercial purposed and
using an advanced technology.
2) The buildings that have been studied from the
past 2 years and onward are black listed.
• The group should meet the supervisor every week
during studio session before the final submission.
The supervisor is provided with supervision record
and penalty will be given to those groups which
disobey the course instructions.
7
Step / Procedure
• Official Letter From UiTM (to prove
student’s identification)
• Official Letter From student’s (cover letter
to praise your intention)
• Select a Case Study
• Proper Appointment With Building Owner
(through phone call, email, face to face, fax
and etc.)
• Site Visit
• Data Collection
• Data Analysis
• Prepare A Report
• Presentation

8
List Of Previous
Case Study
Semester March – July 2019
• MENARA SP SETIA, SETIA ALAM
• WISMA PELADANG, SEBERANG PRAI
• PLAZA PERANGSANG, SHAH ALAM
• WISMA PERSEKUTUAN TAIPING, TAIPING
• CAMFILL FACTORY, BATU GAJAH

9
List Of Previous
Case Study
Semester September 2018 -January 2019
• MENARA ALOR SETAR
• SUNWAY PINNACLE, SUBANG JAYA
• MENARA UEM EDGENTA, KL
• MENARA TH PLATINUM, KL
• BANGUNAN GERMAN-MALAYSIAN INSTITUTE
• PAM CENTRE
• BGN KEM. KESIHATAN MALAYSIA, PUTRAJAYA
• MENARA YAYASAN SELANGOR
• MID VALLEY CENTREPOINT SOUTH
• WISMA BERNAMA
• WISMA SIME DARBY, JALAN RAJA LAUT
• PERPUTSAKAAN PERBADANAN AWAM SELANGOR
• BANGUNAN SULTAN DIRIS SHAH, SHAH ALAM

10
List Of Previous
Case Study
Semester September 2018 -January 2019
• BANGUNAN UTUSAN MALAYSIA, KL
• MENARA KPJ, KL
• KDU UNIVERSITI COLLEGE, UTROPOLIS, SHAH
ALAM
• UNIKL IPOH
• TH PERDANA
• MENARA AM FIRST
• BANGUNAN RISDA, KL
• BANGUNAN LHDN, JALAN DUTA, KL
• MENARA SUNWAY, PETALING JAYA
• WISMA BSN, KL
• MENARA TH SELBORN, KL
• TEKUN NASIONAL, KL

11
List Of Previous
Case Study
Semester September 2018 -January 2019
• MENARA KERJA RAYA 2, KL
• MENARA DBKL 1, KL
• THE TRAX, KL
• SIME DARBY PLANTATION TOWER, ARA
DAMANSARA
• MENARA PERSEKUTUAN MELAKA
• BANGUNAN KM PENDIDIKAN MALAYSIA,
PUTRAJAYA
• BANGUNAN LGM, KL

12
List Of Previous
Case Study
Semester March – July 2018
• MENARA SIRIM BERHAD, SHAH ALAM
• MENARA KEMENTERIAN PELANCONGAN DAN
KEBUDAYAAN (MOTAC), W.P PUTRAJAYA
• LAMAN PKNS, SHAH ALAM
• MENARA SRI WILAYAH, W.P PUTRAJAYA

13
List Of Previous
Case Study
Semester Sept 2017 – Jan 2018
• MENARA PKNS, PETALING JAYA
• MENARA TH BANGSAR, KUALA LUMPUR
• MENARA PERKESO, KUALA LUMPUR
• MENARA NAZA TTDI, SHAH ALAM
• BANGUNAN DARUL EHSAN, SHAH ALAM
• BGN SUASANA BUKIT CEYLON, KUALA LUMPUR
• GALERIA PjH, W.P PUTRAJAYA
• HOTEL CASUARINA, IPOH
• BANGUNAN SERI KINTA, IPOH
• BANGUNAN LHDN, BANGI
• BANGUNAN MPKj, KAJANG

14
List Of Previous
Case Study
Semester Sept 2017 – Jan 2018
• MENARA USAHAWAN, W.P PUTRAJAYA
• PJ TRADE CENTRE, DAMANSARA
• MENARA MPAJ, AMPANG
• MENARA DEWAN BAHASA PUSTAKA, KUALA
LUMPUR
• BANGUNAN TUANKU SYED PUTRA, PENANG
• MENARA TM, KUALA LUMPUR
• BGN KEM. PEMBANGUNAN WANITA, KELUARGA &
MASYARAKAT, W.P PUTRAJAYA
• BANGUNAN FELCRA BHD, KUALA LUMPUR
• MERCU UEM, KL SENTRAL, KUALA LUMPUR
• BGN KEMENTERIAN LUAR BANDAR & WILAYAH
• BGN PERAK TECHNO TRADE CENTRE (PTTC), IPOH

15
List Of Previous
Case Study
Semester Dec 16 – Mar 17
• MENARA CELCOM, KUALA LUMPUR
• WISMA TANI, W.P PUTRAJAYA
• TOWER REGENCY HOTEL, ALOR STAR
• MENARA KWSP, IPOH
• BANGUNAN TABUNG HAJI, IPOH
• MENARA TUN ISMAIL MOHD ALI (TIMA), KUALA
LUMPUR
• MENARA KEJURUTERAAN UiTM, SHAH ALAM
• BANGUNAN MAJLIS BANDARAYA IPOH, IPOH

16
List Of Previous
Case Study
Semester Jun - Oct 2016
• MENARA PRISMA, W.P PUTRAJAYA
• BGN. KEMENTERIAN PENGANGKUTAN, W.P
PUTRAJAYA
• MENARA SP SETIA, SHAH ALAM
• MENARA IKHLAS, W.P PUTRAJAYA
• BGN. KEMENTERIAN PENGAJIAN TINGGI, W.P
PUTRAJAYA
• MENARA OBYU (POINT 92), DAMANSARA
• DIAMOND BUILDING, W.P PUTRAJAYA
• MENARA PFCC, PUCHONG
• MENARA BERKEMBAR BANK RAKYAT, KL
• HOSPITAL PANTAI, MANJUNG
• MENARA HAP SENG 2, W.P KUALA LUMPUR
• TUNE HOTEL, TAIPING
17
List Of Previous
Case Study
Semester Jun - Oct 2016
• MARINA COVE RESORT, LUMUT
• BGN PLATINUM SENTRAL, KL SENTRAL, W.P KL
• D’PULZZE SHOPPING CENTRE, CYBERJAYA
• TUNE HOTEL, KLIA 2, SEPANG
• D’TEMPAT CLUB HOUSE, SEREMBAN
• MENARA KPKT, W.P PUTRAJAYA
• SETIA CITY CONVENTION CENTRE, SHAH ALAM
• MENARA MiTI, W.P KUALA LUMPUR
• MITRA LAND CASCADE RESIDENTIAL, DAMANSARA
• JAKEL MALL, W.P KUALA LUMPUR
• CIMB BANK, KL SENTRAL, W.P KL
• MENARA TOP GLOVE TOWER, SHAH ALAM
• AEON ANGGUN RAWANG, SELANGOR
• HIG HOTEL, LANGKAWI
18
List Of Previous
Case Study
Semester Jun - Oct 2016
• GRAND KAMPAR HOTEL, PERAK
• BGN JAYA 33, PETALING JAYA
• HERIOT WATT CITY CAMPUS, W.P PUTRAJAYA
• WISMA PERSEKUTUAN S. PRAI UTARA, P. PINANG

19
If you can find your own
case study
IT IS MUCH BETTER

20
Presentation
Requirement
• Date: Week 13
(08:00 am – 12:00 pm)
• Slide presentation (covered all chapter) :
please assigned work accordingly. Slide in
the range of 30 – 50 pages
• 2 printed hardcopy report (binded), 1
coloured, 1 black & white photocopy.
• A3 Size of financial proforma
• Brochure
• Appendices
• Presentation is within 20-30 minutes.
• Wear a proper attire during presentation.
Thank You

You might also like