ROGELIO L. SINGSON
Secretary
Department of Public Works and Highways
November 18, 2010
1
PRESENTATION OUTLINE
Strategic Directions
Expressways in Operation and Under Construction
Projects for Bidding in 2011
PPP Pipeline of Projects under the Medium Term
Other DPWH PPP Projects Under Development
2
STRATEGIC DIRECTIONS
Upgrading the national road network in terms of quality and safety
standards with focus on urban centers and strategic tourism
destinations;
Completion of critical bridges along national roads;
Develop more Public-Private Partnership (PPP) projects for much
needed infrastructure and level playing field for investments;
Address private sector concerns – Transparency, RROW, regulatory
risks and government support;
Pursue contracts for long term maintenance period (5-10 years) in
road and bridge construction; and
Introduce innovative technology such as bio-engineering for road
slope protection
3
EXPRESSWAYS
IN OPERATION
Project Name
Subic-Clark-Tarlac Expressway
(93.77 km)
North Luzon Tollway (82.62 km)
C-5 Expressway (Segment 8.1, 2.34 km)
Metro Manila Skyway, Stage 1
(13.43 km At-grade & 9.30 km Viaduct)
Manila-Cavite Toll Expressway
(6.75 km)
South Luzon Tollway (36.03 km)
Southern Tagalog Arterial Road
(41.90 km)
4
Total Length = 286.14 km
EXPRESSWAY UNDER
CONSTRUCTION/PLANNING
Project Name
6
EXISTING AND
PROPOSED
EXPRESSWAYS :
200 Km SPHERE OF
METRO MANILA
7
PROJECTS FOR IMPLEMENTATION IN 2011
8
Proposed PPP Projects
9
Milestones – CAVITE-LAGUNA Expressway
Particular Date
10
Proposed PPP Projects
11
Milestones – NAIA Expressway, Phase II
Particular Date
Feasibility Study Completed
ROW acquisition plan and resettlement plan To be
undertaken by
Private Sector
Submission to NEDA Investment Coordination Committee
Of Implementation Program Jan 2011
Commencement of bidding process Mar 2011
Target Bid date July 2011
12
Proposed PPP Projects
3. NLEX-SLEX Link Expressway
• To close the gap and complete the north-
south Luzon industrial beltway transport axis
by connecting NLEx and SLEx
• It starts at Caloocan City and ends at Makati
City. It is an elevated expressway over PNR
right-of-way.
• Submitted by MPTC as an unsolicited
proposal.
• Endorsed to NEDA for evaluation and
approval.
• Expected Date of Bidding (Swiss Challenge)
– 2nd Quarter of 2011.
• Detailed Design and Construction Schedule
– 3rd Quarter of 2011 – 2014.
• Estimated total project cost is PhP 21 Billion
(US$ 467 Million) 13
PPP Pipeline of Projects for Implementation
in the Medium Term
(For Bidding Beyond 2011)
Length (Km) Cost
1. Cavite-Laguna Expressway – Laguna 14.3 PhP 7.00 B
Side (US$ 155.56 M)
Section
2. C-5/FTI/Skyway Connector 6.8 PhP 5.64 B
(US$ 125.33 M)
3. C-6 Expressway (Global City Link) – 50.0 PhP 40.4 B
South Section (US$ 897.78 M)
4. C-6 Expressway (Laguna de Bay Flood 43.6 PhP 18.59 B
Control Dike Expressway) (US$ 413.11 M)
5. Central Luzon Expressway (CLEX), 35.7 PhP 11.81 B
Phase 2 (Cabanatuan-San Jose) (US$ 262.44 M)
14
PPP Pipeline of Projects for Implementation
in the Medium Term
Length (Km) Cost
6. SLEX Extension (to Lucena City), 47.8 PhP 9.5 B
2-lane (US$ 211.11 M)
7. Calamba-Los Banos Expressway 15.5 PhP 5.9 B
(US$ 131.11 M)
8. R-7 Expressway 16.1 PhP 23.98 B
(US$ 532.89 M)
9. NLEX East/La Mesa Parkway 103.0 PhP 38.8 B
(US$ 862.22 M)
Total 332.80 PhP 161.62 B
(US $ 3,591.55 M)
15
OTHER DPWH PPP PROJECTS UNDER DEVELOPMENT
Long Term Performance Based Road Maintenance Projects
This is a contracting methodology which will ensure good roads
throughout the contract duration (e.g. 10 years or more) for a specified
level of service
National Bridge Program
This will involve the design, construction and 10-yr maintenance contract
for national bridges which are identified as priorities.
Weighbridge Operation
Aims to privatize the operation of weighbridge to have an efficient
control of overloading along the selected pilot service area
16