You are on page 1of 59

CONTRACT ID 19KA0081

CONTRACT NAME:Construction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon

SUMMARY OF QUANTITIES

ORIGINAL QUANTITY AS STAKED QUANTITY


ITEM NO DESCRIPTION UNIT UNIT COST
QUANTITY AMOUNT QUANTITY AMOUNT
PART I OTHER GENERAL REQUIREMENTS
B.5 Project Billboards/Signboards Each 3,750.00 4.00 15,000.00 4.000 15,000.00

B.7(2) Occupational?Safety and Health Program Ls 125,000.00 1.00 125,000.00 1.000 125,000.00
B.9 Mobilization/Demobilization Ls 125,000.00 1.00 125,000.00 1.000 125,000.00
PART II CIVIL WORKS

PART A EARTHWORKS
1702(1)a Structure Excavation (Common Soil) cu.m 237.72 704.00 167,354.88 - -
1704(1)b Embankment from Borrow cu.m 1,399.43 33,282.14 46,576,025.18 29,735.150 41,612,260.96
PART B SUBBASE AND BAASE COURSE

1707(1) Aggregate Subbase Course cu.m 1,817.26 572.00 1,039,472.72 95.000 172,639.70
PART C SURFACE COURSE
311(1)c1 PCC Pavement (Unreinforced), 0.23m thick - 14days sq.m 1,896.61 1,100.00 2,086,271.00 475.000 900,889.75

PART D DRAINAGE AND SLOPE PROTECTION STRUCTURES


404(1)a Reinforcing Steel Grae 40 kgs 73.99 32,234.40 2,385,023.26 7,940.120 587,489.48
1711(1) Stone Masonry cu.m 5,172.37 2,750.000 14,224,017.50 2,846.760 14,724,496.02

1712(2) Concrete - Slope Protection cu.m 12,180.71 227.910 2,776,105.62 243.240 2,962,835.90
1717(2)a1 Sheet Piles, Steel (Slope Protection) l.m 7,188.59 2,200.000 15,814,898.00 2,920.000 20,990,682.80
1718(1) Pipe Culvert , 910mm dia. (36"Φ) Class II l.m 6,672.19 43.000 286,904.17 43.000 286,904.17

1718(2) Storm Drain l.m 2,700.00 220.000 594,000.00 - -


PART E MISCELLANEOUS STRUCTURES
1722(1)a Femce - CHB (Plant Box) sq.m 1,500.00 132.000 198,000.00 - -
1722(2) Railings l.m 3,125.00 220.000 687,500.00 - -

600(4) Curb and Gutter - Cast in Place l.m 1,485.00 440.000 653,400.00 - -
CONTRACT ID 19KA0081
CONTRACT NAME:Construction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon

SUMMARY OF QUANTITIES

ORIGINAL QUANTITY AS STAKED QUANTITY


ITEM NO DESCRIPTION UNIT UNIT COST
QUANTITY AMOUNT QUANTITY AMOUNT
606(1)b1 Pavement Markings (reflectorized Thermoplastic) - White sq.m 1,187.50 220.00 261,250.00 - -
611(1) Trees Furnishing and Transplanting Each 540.00 440.00 237,600.00 - -

622(3)a Vegetation - Grass Cover sq.m 202.50 660.00 133,650.00 - -


807(2) Softcape Ls 1,620,000.00 1.00 1,620,000.00 1.00 1,620,000.00
807(9) Paver Blocks sq.m 2,625.00 660.00 1,732,500.00 - -

91,738,972.33 ###
SUMMARY OF QUANTITIES

VARIANCE
REMARKS
QUANTITY AMOUNT

- - As is

- - As is
- - As is

(704.00) (167,354.88) Deleted


(3,546.99) (4,963,764.22) Decrease

(477.00) (866,833.02) Decrease

(625.00) (1,185,381.25) Decrease

(24,294.28) (1,797,533.78) Decrease


96.76 500,478.52 Increase

15.33 186,730.28 Increase


720.00 5,175,784.80 Increase
- - As is

(220.00) (594,000.00) Deleted

(132.00) (198,000.00) Deleted


(220.00) (687,500.00) Deleted

(440.00) (653,400.00) Deleted


SUMMARY OF QUANTITIES

VARIANCE
REMARKS
QUANTITY AMOUNT
(220.00) (261,250.00) Deleted
(440.00) (237,600.00) Deleted

(660.00) (133,650.00) Deleted


- - As is
(660.00) (1,732,500.00) Deleted

(7,615,773.55)
CONTRACT ID: 19KA0081
CONTRACT NAME:Construction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Val

ITEM 1702(1)a STRUCTURE EXCAVATION (COMMON SOIL)

AREA (sq.m) VOLUME (cu.m)


STATION LENGTH
CUT CUT

0000+000.00
20.00 -
0000+020.00
20.00 -
0000+040.00
20.00 -
0000+060.00
20.00 -
0000+080.00
20.00 -
0000+100.00
20.00 -
0000+120.00
20.00 -
0000+140.00
20.00 -
0000+160.00
20.00 -
0000+180.00
20.00 -
0000+200.00
20.00 -
0000+220.00
20.00 -
0000+240.00
20.00 -
0000+260.00
20.00 -
0000+280.00
20.00 -
0000+300.00

TOTAL -

AS STAKED QUANTITY 0.00 cu.m


ith Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon

L)
CONTRACT ID 19KA0081
CONTRACT NAME:Construction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon

1704(1)b EMBANKMENT FROM BORROW

STATION AREA OF FILL LENGTH VOLUME OF FILL

0002+300.00 157.11
20.00 3,185.70
0002+320.00 161.46
20.00 3,210.60
0002+340.00 159.60
20.00 3,205.10
0002+360.00 160.91
20.00 3,164.90
0002+380.00 155.58
20.00 3,036.50
0002+400.00 148.07
20.00 2,969.30
0002+420.00 148.86
20.00 3,088.70
0002+440.00 160.01
20.00 3,218.80
0002+460.00 161.87
20.00 3,110.50
0002+480.00 149.18
10.00 1,545.05
0002+490.00 159.83

SUB - TOTAL 29,735.15


RUNNING TOTAL 29,735.15
CONTRACT ID 19KA0081
CONTRACT NAME:Construction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon

1704(1)b EMBANKMENT FROM BORROW


AS STAKED QUANTITY 29,735.15 cu.m
CONTRACT ID 15K00191
CONTRACT NAME Road Upgrading (Unpaved to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Pav
Standards (HDM-4 Project analysis) (Intermitted Sections) Jct SH Aglayan - Zamboanguita Road, K1563+317 - K1
K1564+156 - K1565+778, Bukidnon 2nd LD

ITEM 102(3) SURPLUS ROCK EXCAVATION (RIPPABLE)

RETAINING WALL

AREA (sq.m) VOLUME (cu.m)


STATION LENGTH
LEFT RIGHT LEFT

TOTAL

AS STAKED QUANTITY - Cu.m


Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road
Intermitted Sections) Jct SH Aglayan - Zamboanguita Road, K1563+317 - K1563+775,
nd LD

PPABLE)

VOLUME (cu.m)
RIGHT

-
CONTRACT ID 19KA0081
CONTRACT NAME Construction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Va

ITEM 1707(1) AGGREGATE SUB-BASE COURSE

CARRIAGEWAY

Construction Limits 0000+000.00


0000+190.00

Length of Project 190.00

Cross-sectional Area
= (1.25 x 0.20) x 2 sides = 0.50 sq.m

Volume 95.00 cu.m

TOTAL VOLUME 95.00 cu.m

AS STAKED QUANTITY 95.00 Cu.m


(with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon
CONTRACT ID 19KA0081
CONTRACT NAME Construction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia

ITEM 311(1)c1 PCC Pavement (Unreinforced), t = 230mm

STATION LIMITS LENGTH WIDTH AREA

0000+000.00 0000+190.00 190.00 2.50 475.00

475.00

AS STAKED QUANTITY 475.00 Sq.m


Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon

m
CONTRACT NAME:Construction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valen
CONTRACT NAME Construction of By-passes/Diversion Roads, Valencia by-pass Road Extn. Including bridge and ROW, (Lantapan-Ba

ITEM 404 REINFORCING STEEL

UNIT NO. OF
BAR SPACING, BAR DIA.
DESCRIPTION WEIGHT, SETS,
BEND (mm) (mm)
(kg/m) (pcs)

EVERY AFTER 40 METER (DIKE) WIDTH = 1.20 m CLEAR COV. 75 mm

STATION L 0+000.00 ### 190 m BERM = 2m

TRANSVERSE TOP BAR D 250 12.00 0.888 5

HORIZNTAL BARS B 250 12.00 0.888 5


STAIR
TRANSVERSE BOTTOM BAR C 250 12.00 0.888 5

LONGITUDINAL BARS B every bend 12.00 0.888 5

DIMENSION = 0.6 m X 0.5 m


R
I
G HORIZONTAL BAR B 16.00 1.578 1
H
T SHEET
DOWELS B 300 16.00 1.578 1
PILE CAP
S
I STIRUPPS A 300 10.00 0.617 1
D
E
DIMENSION = 0.3 m X 0.3 m

H 16.00 1.578 36
MAIN BARS
F 16.00 1.578 36

I 16.00 1.578 36
RC
FRAMING
DEFORMED BARS J 16.00 1.578 36

K 16.00 1.578 36

STIRRUPS G 200 10.00 0.617 36

PCCP (DOWELS) B 500 16.00 1.578 1

TOTAL
CONTRACT NAME:Construction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valen
CONTRACT NAME Construction of By-passes/Diversion Roads, Valencia by-pass Road Extn. Including bridge and ROW, (Lantapan-Ba

ITEM 404 REINFORCING STEEL

UNIT NO. OF
SPACING, BAR DIA.
DESCRIPTION BAR BEND WEIGHT, SETS,
(mm) (mm)
(kg/m) (pcs)

EVERY AFTER 40 METER (DIKE) WIDTH = 2.00 m CLEAR COV. 75 mm


STATION L 0+000.00 ### 150 m

TRANSVERSE TOP BAR F 250 12.00 0.888 1

HORIZNTAL BARS B 250 12.00 0.888 1


STAIR
TRANSVERSE BOTTOM BAR C 250 12.00 0.888 1

LONGITUDINAL BARS B every bend 12.00 0.888 1

DIMENSION = 0.85 m X 1.0 m


L
E
F TRANVERSE BAR E 500 10.00 0.617 1
T
DITCH
S LONGITUDINAL BAR B 300 10.00 0.617 1
CANAL
I
D BOTTOM BAR B 300 10.00 0.617 1
E

DIMENSION = 0.3 m X 0.3 m

H 16.00 1.578 29
MAIN BARS
F 16.00 1.578 29

I 16.00 1.578 29
RC
FRAMING
DEFORMED BARS J 16.00 1.578 29

K 16.00 1.578 29

STIRRUPS G 200 10.00 0.617 29

TOTAL
CONTRACT NAME:Construction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valen
CONTRACT NAME Construction of By-passes/Diversion Roads, Valencia by-pass Road Extn. Including bridge and ROW, (Lantapan-Ba

ITEM 404 REINFORCING STEEL

AS STAKED QUANTITY
along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon
ss Road Extn. Including bridge and ROW, (Lantapan-Bagontaas Section), Bukidnon

NO. OF
TOTAL LAP TOTAL TOTAL
REBARS/ LENGTH/
LENGTH, LENGTH, WEIGHT,
SET, SET, (m)
(m) (m) (kg)
(pcs)
1ST SLOPE 3ND SLOPE
5.7 m 5.7 m
= =
2ND SLOPE
5.7 m
=

8 30.87 2.40 1,330.80 1,181.75

8 0.60 - 24.00 21.31

8 19.86 1.44 852.00 756.58

32 0.60 - 96.00 85.25

6 190.00 19.84 1,259.04 1,986.77

730 0.60 - 438.00 691.16

730 3.90 - 2,847.00 1,756.60

2 - 0.00 0.00

4 - 0.00 0.00

2 - 0.00 0.00

4 - 0.00 0.00

2 - 0.00 0.00

35 - 0.00 0.00

381 0.60 - 228.60 360.73

6,840.15
along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon
ss Road Extn. Including bridge and ROW, (Lantapan-Bagontaas Section), Bukidnon

NO. OF
TOTAL LAP TOTAL TOTAL
REBARS/ LENGTH/
LENGTH, LENGTH, WEIGHT,
SET, SET, (m)
(m) (m) (kg)
(pcs)
1ST SLOPE
5.7 m
=

8 10.37 0.48 86.80 77.08

8 0.60 - 4.80 4.26

8 8.10 0.48 68.64 60.95

13 0.60 - 7.80 6.93

301 1.93 - 580.93 358.43

2 150.00 10.00 320.00 197.44

4 150.00 10.00 640.00 394.88

2 - 0.00 0.00

4 - 0.00 0.00

2 - 0.00 0.00

4 - 0.00 0.00

2 - 0.00 0.00

15 - 0.00 0.00

1,099.97
along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon
ss Road Extn. Including bridge and ROW, (Lantapan-Bagontaas Section), Bukidnon

AS STAKED QUANTITY ###


CONTRACT ID 18K00034
Construction of Flood Control Structure Along Tigwa River, Barangay Halapitan (Poblacion), San Fernando,
CONTRACT NAME
Bukidnon

ITEM 1711(1) STONE MASONRY

SLOPE PROTECTION:
Station: 0+000.00 - 0+190.00

Project Length = 190.00m


Length of Grouted Riprap = 5m
Width of RC Framing = 0.30m

Length Location No. of Sets Area / Set Volume

4.70 RIGHTSIDE 34.00 3.00 479.40


4.70 LEFTSIDE 34.00 1.00 159.80

Total 639.20

WHEELGUARD
Width of Carraige: 1.5m
VOLUMEBLOCK =0.50 x 0.6 x 1.0

VOLUMEBLOCK =0.300 cu.m

STATTION LIMITS LOCATION LENGTH NO OF BLOCKS VOLUME

0000+000.00 0000+190.00 BOTHSIDES 190.00 146.00 87.60

TOTAL 87.60

RCPC
VOLUME OF HEADWALL
STATION TOTAL
LEFT RIGHT
0000+140 3.72 3.72
-
TOTAL 3.72
CONTRACT ID 18K00034
Construction of Flood Control Structure Along Tigwa River, Barangay Halapitan (Poblacion), San Fernando,
CONTRACT NAME
Bukidnon

ITEM 1711(1) STONE MASONRY

RETAINING WALL:

STATION AREA LENGTH VOLUME


2+300.00 10.25
2+399.25 3.89 99.25 701.70

2+400.75 3.89 1.50 5.84


2+600.00 10.25 199.25 1408.70
TOTAL 2116.24

AS STAKED QUANTITY 2,846.76 Cu.m


ructure Along Tigwa River, Barangay Halapitan (Poblacion), San Fernando,
CONTRA
19KA0081
CONTR
Construction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bu

ITEM 1712(2) CONCRETE - SLOPE PROTECTION

Lined Canal

STATION LIMITS LOCATION LENGTH AREA

0000+000.00 0000+190.00 LEFT SIDE 190.00 0.26

TOTAL

RC FRAMING

DIMENSION: 0.3m x 0.3m EVERY 5m

TOTAL SETS LOCATION AREA WIDTH

35.00 RIGHT SIDE 6.00 0.30

35.00 LEFT SIDE 2.22 0.30

TOTAL

SHEET PILE CAP

Station Limit: 0+000.00 - 0+228.8 Arc Length: 28.8m

STATION LIMITS LOCATION LENGTH AREA

0000+000.00 0000+228.80 RIGHT SIDE 228.80 0.30

TOTAL

STAIRS

TOTAL SETS LOCATION AREA WIDTH

4.00 LEFT SIDE 5.10 1.20


4.00 RIGHT SIDE 1.66 1.20

TOTAL
CONTRA
19KA0081
CONTR
Construction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bu

ITEM 1712(2) CONCRETE - SLOPE PROTECTION

TRANSVERSE BEAM (IN BETWEEN STAIRS)


DIMENSION: 0.3m x 0.3m EVERY 40m

TOTAL SETS LOCATION AREA WIDTH

5.00 RIGHT SIDE 6.00 0.30


5.00 LEFT SIDE 2.22 0.30

TOTAL
CONTRA
19KA0081
CONTR
Construction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bu

ITEM 1712(2) CONCRETE - SLOPE PROTECTION

CONCRETE COVER
DIMENSION: 0.5m x 0.88m

TOTAL SETS LOCATION AREA WIDTH

300.00 RIGHT SIDE 0.41 0.15

TOTAL

AS STAKED QUANTITY 243.24


des) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon

VOLUME

49.40

49.40

VOLUME

63.00

23.31

86.31

VOLUME

68.64

68.64

VOLUME

6.12
1.99

8.11
des) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon

VOLUME

9.00
3.33

12.33
des) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon

VOLUME

18.45

18.45

Sq.m
CONTRACT ID 19KA0081
CONTRACT NAMEConstruction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valenci

ITEM 1717(2).a1 SHEET PILES,STEEL (SLOPE PROTECTION)

Station Limits0+000.00 - 0+190.00

Arc Length: 28.8m

WIDTH OF LENGTH/ PILE, NO. OF


STATION LENGTH, (m)
PILE (mm) m PILES

000+0000.00 000+0218.80 600.00 8.00 218.80 365.00

TOTAL

AS STAKED QUANTITY
lanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon

TOTAL LENGTH
OF PILES, m

2,920.00

2,920.00

2,920.00 l.m
CONTRACT ID 18K00034
CONTRACT NAME Construction of Flood Control Structure Along Tigwa River, Barangay Halapitan (Poblacion), San Fernando, Bukidnon

ITEM 500 RC PIPE CULVERTS

NO OF PIPES
STATION
910mmØ 1220mmØ

0000+140.00 43

TOTAL 43 0

ITEM 500(1)a RC PIPES, 910mmØ

AS STAKED QUANTITY 43.00 L.m


ture Along Tigwa River, Barangay Halapitan (Poblacion), San Fernando, Bukidnon
CONTRACT ID 19KA0081
CONTRACT NAMEConstruction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Vale

ITEM 1718(2) STORM DRAIN

AS STAKED QUANTITY -
e (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon

l.m
CONTRACT ID 19KA0081
CONTRACT NAMEConstruction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Vale

ITEM 1722(1)a Fence - CHB (Plant Box)

AS STAKED QUANTITY
with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon

00.00 sqm
CONTRACT ID 19KA0081
CONTRACT NAMEConstruction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Vale

ITEM 1722(2) RAILINGS

AS STAKED QUANTITY
with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon

00.00 l.m
CONTRACT ID 19KA0081
CONTRACT NAMEConstruction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Vale

ITEM 600(4) CURB AND GUTTER - CAST IN PLACE

AS STAKED QUANTITY
with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon

00.00 l.m
CONTRACT ID 19KA0081
CONTRACT NAMEConstruction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Vale

ITEM 606(1)b1 PAVEMENTMARKINGS (REFLECTORIZED THERMOPLASTIC) - WHITE

AS STAKED QUANTITY
with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon

D THERMOPLASTIC) - WHITE

00.00 sqm
CONTRACT ID 19KA0081
CONTRACT NAMEConstruction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Vale

ITEM 611(1) TREES FURNISHING AND TRANSPLANTING

AS STAKED QUANTITY
with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon

00.00 each
CONTRACT ID 19KA0081
CONTRACT NAMEConstruction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Vale

ITEM 622(3)a VEGETATION - GRASS COVER

AS STAKED QUANTITY
with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon

00.00 sqm
CONTRACT ID 19KA0081
CONTRACT NAMEConstruction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Vale

ITEM 807(2) SOFTCAPE

AS STAKED QUANTITY
with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon

00.00 ls
CONTRACT ID 19KA0081
CONTRACT NAMEConstruction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Vale

ITEM 807(9) PAVER BLOCKS

AS STAKED QUANTITY
with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon

00.00 sqm
CONTRACT ID 15K00250
CONTRACT NAME Road Upgrading (Unpaved to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Pa
Standards (HDM-4 Project analysis) (Intermitted Sections) Jct SH Aglayan - Zamboanguita Road, K1563+317 - K
K1564+156 - K1565+778, Bukidnon 2nd LD

SUBBASE AND SURFACE COURSE

AREA (sq.m) VOLUME (cu.m)


STATION LENGTH
ITEM 200 ITEM 300 ITEM 200
1465+200.00
20.00 -
1465+220.00
20.00 -
1465+240.00
20.00 -
1465+260.00
20.00 -
1465+280.00
20.00 -
1465+300.00
20.00 -
1465+320.00
20.00 -
1465+340.00
20.00 -
1465+360.00
20.00 -
1465+380.00
20.00 -
1465+400.00
20.00 -
1465+420.00
20.00 -
1465+440.00
20.00 -
1465+460.00
20.00 -
1465+480.00
20.00 -
1465+500.00
20.00 -
1465+520.00
20.00 -
1465+540.00
20.00 -
1465+560.00
20.00 -
1465+580.00
20.00 -
1465+600.00
20.00 -
1465+620.00
20.00 -
1465+640.00
20.00 -
1465+660.00
20.00 -
1465+680.00
20.00 -
1465+700.00
20.00 -
1465+720.00
20.00 -
1465+740.00
20.00 -
1465+760.00
20.00 -
1465+780.00
20.00 -
1465+800.00
20.00 -
1465+820.00
20.00 -
1465+840.00
20.00 -
1465+860.00
20.00 -
1465+880.00
CONTRACT ID 15K00250
CONTRACT NAME Road Upgrading (Unpaved to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Pa
Standards (HDM-4 Project analysis) (Intermitted Sections) Jct SH Aglayan - Zamboanguita Road, K1563+317 - K
K1564+156 - K1565+778, Bukidnon 2nd LD

SUBBASE AND SURFACE COURSE


1465+880.00
20.00 -
1465+900.00
20.00 -
1465+920.00
20.00 -
1465+940.00
20.00 -
1465+960.00
20.00 -
1465+980.00
20.00 -
1466+000.00
20.00 -
1466+020.00
20.00 -
1466+040.00
20.00 -
1466+060.00
20.00 -
1466+080.00
20.00 -
1466+100.00
20.00 -
1466+120.00
20.00 -
1466+140.00
20.00 -
1466+160.00
20.00 -
1466+180.00
20.00 -
1466+200.00
SUB - TOTAL -
RUNNING TOTAL -
CONTRACT ID 15K00250
CONTRACT NAME Road Upgrading (Unpaved to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Pa
Standards (HDM-4 Project analysis) (Intermitted Sections) Jct SH Aglayan - Zamboanguita Road, K1563+317 - K
K1564+156 - K1565+778, Bukidnon 2nd LD

SUBBASE AND SURFACE COURSE

AREA (sq.m) VOLUME (cu.m)


STATION LENGTH
ITEM 200 ITEM 300 ITEM 200
1466+200.00 - -
20.00 -
1466+220.00
20.00 -
1466+240.00
20.00 -
1466+260.00
20.00 -
1466+280.00
20.00 -
1466+300.00
20.00 -
1466+320.00
20.00 -
1466+340.00
20.00 -
1466+360.00
20.00 -
1466+380.00
20.00 -
1466+400.00
20.00 -
1466+420.00
20.00 -
1466+440.00
20.00 -
1466+460.00
20.00 -
1466+480.00
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
CONTRACT ID 15K00250
CONTRACT NAME Road Upgrading (Unpaved to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Pa
Standards (HDM-4 Project analysis) (Intermitted Sections) Jct SH Aglayan - Zamboanguita Road, K1563+317 - K
K1564+156 - K1565+778, Bukidnon 2nd LD

SUBBASE AND SURFACE COURSE


Err:508
Err:508

SUB - TOTAL -
RUNNING TOTAL -

ITEM 200 AGGREGATE SUBBASE COURSE, T = 230mm

AS STAKED QUANTITY - Cu.m

ITEM 300 AGGREGATE SURFACE COURSE, T = 150m

AS STAKED QUANTITY - Cu.m


to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road
(Intermitted Sections) Jct SH Aglayan - Zamboanguita Road, K1563+317 - K1563+775,
2nd LD

VOLUME (cu.m)
ITEM 300

-
to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road
(Intermitted Sections) Jct SH Aglayan - Zamboanguita Road, K1563+317 - K1563+775,
2nd LD

-
-
to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road
(Intermitted Sections) Jct SH Aglayan - Zamboanguita Road, K1563+317 - K1563+775,
2nd LD

VOLUME (cu.m)
ITEM 300

-
to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road
(Intermitted Sections) Jct SH Aglayan - Zamboanguita Road, K1563+317 - K1563+775,
2nd LD

-
-