Professional Documents
Culture Documents
CONTRACT NAME:Construction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon
SUMMARY OF QUANTITIES
B.7(2) Occupational?Safety and Health Program Ls 125,000.00 1.00 125,000.00 1.000 125,000.00
B.9 Mobilization/Demobilization Ls 125,000.00 1.00 125,000.00 1.000 125,000.00
PART II CIVIL WORKS
PART A EARTHWORKS
1702(1)a Structure Excavation (Common Soil) cu.m 237.72 704.00 167,354.88 - -
1704(1)b Embankment from Borrow cu.m 1,399.43 33,282.14 46,576,025.18 29,735.150 41,612,260.96
PART B SUBBASE AND BAASE COURSE
1707(1) Aggregate Subbase Course cu.m 1,817.26 572.00 1,039,472.72 95.000 172,639.70
PART C SURFACE COURSE
311(1)c1 PCC Pavement (Unreinforced), 0.23m thick - 14days sq.m 1,896.61 1,100.00 2,086,271.00 475.000 900,889.75
1712(2) Concrete - Slope Protection cu.m 12,180.71 227.910 2,776,105.62 243.240 2,962,835.90
1717(2)a1 Sheet Piles, Steel (Slope Protection) l.m 7,188.59 2,200.000 15,814,898.00 2,920.000 20,990,682.80
1718(1) Pipe Culvert , 910mm dia. (36"Φ) Class II l.m 6,672.19 43.000 286,904.17 43.000 286,904.17
600(4) Curb and Gutter - Cast in Place l.m 1,485.00 440.000 653,400.00 - -
CONTRACT ID 19KA0081
CONTRACT NAME:Construction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon
SUMMARY OF QUANTITIES
91,738,972.33 ###
SUMMARY OF QUANTITIES
VARIANCE
REMARKS
QUANTITY AMOUNT
- - As is
- - As is
- - As is
VARIANCE
REMARKS
QUANTITY AMOUNT
(220.00) (261,250.00) Deleted
(440.00) (237,600.00) Deleted
(7,615,773.55)
CONTRACT ID: 19KA0081
CONTRACT NAME:Construction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Val
0000+000.00
20.00 -
0000+020.00
20.00 -
0000+040.00
20.00 -
0000+060.00
20.00 -
0000+080.00
20.00 -
0000+100.00
20.00 -
0000+120.00
20.00 -
0000+140.00
20.00 -
0000+160.00
20.00 -
0000+180.00
20.00 -
0000+200.00
20.00 -
0000+220.00
20.00 -
0000+240.00
20.00 -
0000+260.00
20.00 -
0000+280.00
20.00 -
0000+300.00
TOTAL -
L)
CONTRACT ID 19KA0081
CONTRACT NAME:Construction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon
0002+300.00 157.11
20.00 3,185.70
0002+320.00 161.46
20.00 3,210.60
0002+340.00 159.60
20.00 3,205.10
0002+360.00 160.91
20.00 3,164.90
0002+380.00 155.58
20.00 3,036.50
0002+400.00 148.07
20.00 2,969.30
0002+420.00 148.86
20.00 3,088.70
0002+440.00 160.01
20.00 3,218.80
0002+460.00 161.87
20.00 3,110.50
0002+480.00 149.18
10.00 1,545.05
0002+490.00 159.83
RETAINING WALL
TOTAL
PPABLE)
VOLUME (cu.m)
RIGHT
-
CONTRACT ID 19KA0081
CONTRACT NAME Construction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Va
CARRIAGEWAY
Cross-sectional Area
= (1.25 x 0.20) x 2 sides = 0.50 sq.m
475.00
m
CONTRACT NAME:Construction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valen
CONTRACT NAME Construction of By-passes/Diversion Roads, Valencia by-pass Road Extn. Including bridge and ROW, (Lantapan-Ba
UNIT NO. OF
BAR SPACING, BAR DIA.
DESCRIPTION WEIGHT, SETS,
BEND (mm) (mm)
(kg/m) (pcs)
H 16.00 1.578 36
MAIN BARS
F 16.00 1.578 36
I 16.00 1.578 36
RC
FRAMING
DEFORMED BARS J 16.00 1.578 36
K 16.00 1.578 36
TOTAL
CONTRACT NAME:Construction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valen
CONTRACT NAME Construction of By-passes/Diversion Roads, Valencia by-pass Road Extn. Including bridge and ROW, (Lantapan-Ba
UNIT NO. OF
SPACING, BAR DIA.
DESCRIPTION BAR BEND WEIGHT, SETS,
(mm) (mm)
(kg/m) (pcs)
H 16.00 1.578 29
MAIN BARS
F 16.00 1.578 29
I 16.00 1.578 29
RC
FRAMING
DEFORMED BARS J 16.00 1.578 29
K 16.00 1.578 29
TOTAL
CONTRACT NAME:Construction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valen
CONTRACT NAME Construction of By-passes/Diversion Roads, Valencia by-pass Road Extn. Including bridge and ROW, (Lantapan-Ba
AS STAKED QUANTITY
along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon
ss Road Extn. Including bridge and ROW, (Lantapan-Bagontaas Section), Bukidnon
NO. OF
TOTAL LAP TOTAL TOTAL
REBARS/ LENGTH/
LENGTH, LENGTH, WEIGHT,
SET, SET, (m)
(m) (m) (kg)
(pcs)
1ST SLOPE 3ND SLOPE
5.7 m 5.7 m
= =
2ND SLOPE
5.7 m
=
2 - 0.00 0.00
4 - 0.00 0.00
2 - 0.00 0.00
4 - 0.00 0.00
2 - 0.00 0.00
35 - 0.00 0.00
6,840.15
along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon
ss Road Extn. Including bridge and ROW, (Lantapan-Bagontaas Section), Bukidnon
NO. OF
TOTAL LAP TOTAL TOTAL
REBARS/ LENGTH/
LENGTH, LENGTH, WEIGHT,
SET, SET, (m)
(m) (m) (kg)
(pcs)
1ST SLOPE
5.7 m
=
2 - 0.00 0.00
4 - 0.00 0.00
2 - 0.00 0.00
4 - 0.00 0.00
2 - 0.00 0.00
15 - 0.00 0.00
1,099.97
along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon
ss Road Extn. Including bridge and ROW, (Lantapan-Bagontaas Section), Bukidnon
SLOPE PROTECTION:
Station: 0+000.00 - 0+190.00
Total 639.20
WHEELGUARD
Width of Carraige: 1.5m
VOLUMEBLOCK =0.50 x 0.6 x 1.0
TOTAL 87.60
RCPC
VOLUME OF HEADWALL
STATION TOTAL
LEFT RIGHT
0000+140 3.72 3.72
-
TOTAL 3.72
CONTRACT ID 18K00034
Construction of Flood Control Structure Along Tigwa River, Barangay Halapitan (Poblacion), San Fernando,
CONTRACT NAME
Bukidnon
RETAINING WALL:
Lined Canal
TOTAL
RC FRAMING
TOTAL
TOTAL
STAIRS
TOTAL
CONTRA
19KA0081
CONTR
Construction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bu
TOTAL
CONTRA
19KA0081
CONTR
Construction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bu
CONCRETE COVER
DIMENSION: 0.5m x 0.88m
TOTAL
VOLUME
49.40
49.40
VOLUME
63.00
23.31
86.31
VOLUME
68.64
68.64
VOLUME
6.12
1.99
8.11
des) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon
VOLUME
9.00
3.33
12.33
des) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon
VOLUME
18.45
18.45
Sq.m
CONTRACT ID 19KA0081
CONTRACT NAMEConstruction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valenci
TOTAL
AS STAKED QUANTITY
lanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon
TOTAL LENGTH
OF PILES, m
2,920.00
2,920.00
2,920.00 l.m
CONTRACT ID 18K00034
CONTRACT NAME Construction of Flood Control Structure Along Tigwa River, Barangay Halapitan (Poblacion), San Fernando, Bukidnon
NO OF PIPES
STATION
910mmØ 1220mmØ
0000+140.00 43
TOTAL 43 0
AS STAKED QUANTITY -
e (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon
l.m
CONTRACT ID 19KA0081
CONTRACT NAMEConstruction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Vale
AS STAKED QUANTITY
with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon
00.00 sqm
CONTRACT ID 19KA0081
CONTRACT NAMEConstruction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Vale
AS STAKED QUANTITY
with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon
00.00 l.m
CONTRACT ID 19KA0081
CONTRACT NAMEConstruction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Vale
AS STAKED QUANTITY
with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon
00.00 l.m
CONTRACT ID 19KA0081
CONTRACT NAMEConstruction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Vale
AS STAKED QUANTITY
with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon
D THERMOPLASTIC) - WHITE
00.00 sqm
CONTRACT ID 19KA0081
CONTRACT NAMEConstruction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Vale
AS STAKED QUANTITY
with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon
00.00 each
CONTRACT ID 19KA0081
CONTRACT NAMEConstruction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Vale
AS STAKED QUANTITY
with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon
00.00 sqm
CONTRACT ID 19KA0081
CONTRACT NAMEConstruction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Vale
AS STAKED QUANTITY
with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon
00.00 ls
CONTRACT ID 19KA0081
CONTRACT NAMEConstruction of Flood Control Structure (with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Vale
AS STAKED QUANTITY
with Esplanades) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon
00.00 sqm
CONTRACT ID 15K00250
CONTRACT NAME Road Upgrading (Unpaved to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Pa
Standards (HDM-4 Project analysis) (Intermitted Sections) Jct SH Aglayan - Zamboanguita Road, K1563+317 - K
K1564+156 - K1565+778, Bukidnon 2nd LD
SUB - TOTAL -
RUNNING TOTAL -
VOLUME (cu.m)
ITEM 300
-
to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road
(Intermitted Sections) Jct SH Aglayan - Zamboanguita Road, K1563+317 - K1563+775,
2nd LD
-
-
to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road
(Intermitted Sections) Jct SH Aglayan - Zamboanguita Road, K1563+317 - K1563+775,
2nd LD
VOLUME (cu.m)
ITEM 300
-
to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road
(Intermitted Sections) Jct SH Aglayan - Zamboanguita Road, K1563+317 - K1563+775,
2nd LD
-
-