The document outlines the steps for configuring MRP in SAP. It lists the main parameters that need to be configured, including plant parameters, MRP type, MRP controller, procurement type, lot sizing procedure, and scheduling margin key. It also provides details on activating plant parameters, customizing MRP types, setting the MRP controller and scheduler profile, and defines important transaction codes for MRP. The document instructs users to navigate to SPRO and the IMG reference to find full details on MRP settings.
The document outlines the steps for configuring MRP in SAP. It lists the main parameters that need to be configured, including plant parameters, MRP type, MRP controller, procurement type, lot sizing procedure, and scheduling margin key. It also provides details on activating plant parameters, customizing MRP types, setting the MRP controller and scheduler profile, and defines important transaction codes for MRP. The document instructs users to navigate to SPRO and the IMG reference to find full details on MRP settings.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd
The document outlines the steps for configuring MRP in SAP. It lists the main parameters that need to be configured, including plant parameters, MRP type, MRP controller, procurement type, lot sizing procedure, and scheduling margin key. It also provides details on activating plant parameters, customizing MRP types, setting the MRP controller and scheduler profile, and defines important transaction codes for MRP. The document instructs users to navigate to SPRO and the IMG reference to find full details on MRP settings.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd
Reply Posted: Sep 3, 2009 6:33 AM in response to: kirumoha
Hi,
Following steps need to be follow for configuring MRP
1. Plant Parameters for MRP (SPRO)
2. MRP type (MM) 3. MRP controller (MM) 4. Procurement Type(MM) 5. Special Procurement Type if applicable (MM) 6. Lot Sizing Procedure (MM) 7. Scheduling Margin Key(MM) 8. Scheduling Parameters for planned orders through (SPRO)
Detail:
1. Activate Plant Parameters for MRP(in SPRO)
2. MRP Type Customization(E.g, PD, M1,M2,, -in SPRO - But need not suposed to do without client's permission) 3. MRP Controller (in SPRO) 4. Production Scheduler Profile (in SPRO) 5. Order type Dependent Paremeters(in SPRO) 6. Plant Parematers(in SPRO) 7. Scheduling Parameters(in SPRO)
Important T-Codes - OPL8,OPJH,OPKP
Note: Go to SPRO, select reference IMG,
Select Production - Material Requirements Planning, Here you will get all the details about the setting for MRP
by
Hi,
Following steps need to be follow for configuring MRP
1. Plant Parameters for MRP (SPRO)
2. MRP type (MM) 3. MRP controller (MM) 4. Procurement Type(MM) 5. Special Procurement Type if applicable (MM) 6. Lot Sizing Procedure (MM) 7. Scheduling Margin Key(MM) 8. Scheduling Parameters for planned orders through (SPRO)
Detail:
1. Activate Plant Parameters for MRP(in SPRO)
2. MRP Type Customization(E.g, PD, M1,M2,, -in SPRO - But need not suposed to do without client's permission) 3. MRP Controller (in SPRO) 4. Production Scheduler Profile (in SPRO) 5. Order type Dependent Paremeters(in SPRO) 6. Plant Parematers(in SPRO) 7. Scheduling Parameters(in SPRO) Important T-Codes - OPL8,OPJH,OPKP