When you use Planning strategy 10, only PIR quantity is considered for MRP run and sales order are completely ignored. In this PIR
requirement type LSF and is reduced when you deliver stock to customer.
When you use Planning strategy 40, for MRP run maximum of 2 PIR and Sales order can be considered and PIR is reduced when enter the
Sales order. PIR requirement type is VSF in this case.
In MTO strategy, you only produce sales order stock and products are delivered as per sales orders from specific customer.
You use Planning strategy 20 for make to order MTO process and planning strategy 25 is used to produce product variants when there is
request for variant products from customer.
When do you perform a Goods issue under PP? What is the movement type?
To perform goods issue, use T-code: MB1A or go to Logistics → Production → Production Control → Goods Movement → Goods Issue.
MD04
This is used for Stock / Requirement list this is dynamic list which reflects even any small change is made in Master Data, Planned Order
& Production order etc. for respective material for which you have executed stock / requirement list.
MD05 is used to view MRP list which displays results of last MRP run for the material for which you have executed MRP list.
Which Transaction code is used to cancel the Production Order?
99
In SAP-PP what are the costing parameters? Link between PP and FI?
Master Data:
Routing in SAP PP is referred to a list of activities which are required to produce any material. For example, when you do cost
estimation for the material, the system triggers the relevant routing and activity rates for all those described in routing. Which
will helpful to calculate the processing cost in product costing.
Mention what are the types of Master Views for Production and Planning?
A phantom assembly is a non-stocked assembly that lets you group together material needed to produce a subassembly. When you create
a bill of material for a parent item, you can specify whether a component is a phantom.
What is MTS and MTO strategy in PP and the difference between them?
What is MPS and difference between MRP and MPS?
MPS plans items that have “direct” demand, called independent demand. Independent Demand means that its demand comes from Sales
Orders, Service Orders, or forecasts. The demand is directly from the customer requirements (or forecasted requirements).
MRP plans items that have “dependent” demand, demand that is passed down because of the need to produce an item.
Back flushing is nothing but automatic goods issue. ... No Physical issue & Manual posting ( Goods Issue) by Stores. Backflush is used for
material which are a must and having fixed relationship. This can be configured in MRP2 Screen,Work centre, Routing and production
order.
An MRP group is an object which you can use to assign common control parameters to a group of materials for planning and
organizational purposes. For example, the creation indicator for purchase requisitions, schedule lines, planning horizons and so on
What is REM profile? Where is it used?
You use the repetitive manufacturing profile to control how you want to carry out planning and. backflushing in repetitive manufacturing.
Yes we can create a production order without BOM & routing. Change the Config in OPL8 (order type dependent parameters)
as routing optional. But it may ask for a sales order when we try to create order using CO01.
Tcode for MRP run? Difference between MD01, MD02 and MD03 ?
3. MD01 (Using this Code you can run MRP for all plant specific materials)
Important steps in production order processing are order creation, scheduling, release, material withdrawal, confirmation, goods receipt,
and settlement.