Professional Documents
Culture Documents
Quality
Manufacturing Management 1FM Quality Management in Procurement
Goods that are delivered from an external supplier can be posted first into stock that is scheduled for
inspection. Goods that are first posted into inspection stock are not available for use.
Incoming materials from vendors needs to be inspected before issuing to production for usage in
producing the Semi-finished or finished Goods.
This requirement is handled through Inspection Type 01 in the standard SAP system.
Process Flow:
6. Usage Decision of the inspection Lot and Stock Posting to Unrestricted Use.(qa02 & mmbe)
Material Used:7
MIGO
Lets check the MMBE Stock Before I post the Goods receipt
GR Done.
Lets check the MMBE stock
Click save
Check MMBE