A. General
1. Tell us about your experience and why you think you are qualified for
this position.
3. Why are you leaving your current place of work? OR Why did you
leave your last place of work?
4. How much notice for your resignation does your current employer
need?
5. The position is based in Khogyani and will require frequent travel in the
district, also to neighboring districts: SZD and PWA. How do you feel
about this?
A. Civil Engineering
3. What does M200 concrete stand for? And what will be the proportions
of the materials e.g. cement and sand for such a concrete?
4. What would be the percentage of the mortar in stone masonry work?
How much will be the maximum size of the sand while doing stone
masonry work?
7. What are the basic safety measures you apply on the construction
site?
_____________________________________________________________________________
Test Questions
A. Construction
1. Calculate the number of the bricks (22x12x6) Cm for One cubic meter
of bricks masonry work if the percentage of the mortar is 30%.
2. Attached in Figure 1.1 is the cross section for a retaining wall. The
length of the wall is equal to 200 meter, please calculate the following:
b. Total volume of the sand to complete the wall. Please do not consider
calculation of PCC under the wall and PCC over the wall.
e. Please write the formula for checking the stability of the wall against
overturning.
A. Design
1. Draw the table in Figure 1.1 and do the necessary calculations for the
blanks.
_________________________________________________________________________________