You are on page 1of 6

STANISLAV VINOKUR

email. stanislav.vinokur@gmail.com
tel.347.517.8237

SIMONE GIOSTRA AND PARTNERS


Jingya Linyi Spa and Restaurant Center, China
August 2008 - March 2009

Jingya Linyi is a spa and restaraunt complex in Linyi, using the Rhino 3d plugin, Grashopper in order to
China. The driving concept behind this design was quickly, efficiently, and accurately design the com-
the creation of a green facade in order to camou- plex geometry of the outer facade. Using a para-
flage the building enclosure. Creeping plants will metric model allowed our team to quickly analyze
grow along an array of cable net fins which vary various options and later facilitated in the transition
in their amplitude in reaction to interior lighting from concept to DD, and shortly thereafter from Phases: Concept Design, Schematic Design, Design Devel-
requirements. The architectural effect rendered is DD to CD. The parametric model grew throughout opment
organic yet deliberate; a building systems response this process to ultimately include structural member Software: Rhino 3D, VRay, Grasshopper, AutoCad, Ecotect,
to programmed spaces. typologies and sizing. Adobe Creative Suite, Cinema4D
Role: Project Leader, Parametric 3D Model, Concept De-
For this project, I developed a parametric system sign, Presentation Material, Drawings Set
STANISLAV VINOKUR
email. stanislav.vinokur@gmail.com
tel.347.517.8237

SIMONE GIOSTRA AND PARTNERS


Jingya Linyi Spa and Restaurant Center, China
August 2008 - March 2009
STANISLAV VINOKUR
email. stanislav.vinokur@gmail.com
tel.347.517.8237

EVANS AND PAUL UNLIMITED


Work Station Pod for Dupont Corian Showroom - New York City
Morris Sato Studio
March 2010

The Work Station Pod is composed of a spherical co- require minimal number of molds for thermo-
rian shell, a work surface, and a cabinet. The Pod was forming.
built in order to showcase Corian as a product while The project was particularly interesting because
simultaneously exploring some of it’s material proper- it is a result of a fusion of many processes and Phases: Fabrication, Installation
ties. components. Software: Rhino 3D, RhinoCAM, AutoCad,
Role: Project Management, 3D Model, Shop Drawings, CNC
The main challenge was to rationalize the surface in Fabrication, coordination of Installation
a way that would produce maximum curvature - yet
STANISLAV VINOKUR
email. stanislav.vinokur@gmail.com
tel.347.517.8237

EVANS AND PAUL UNLIMITED.


Reception Desk for Law Office
Resolution4Architecture
May 2010

Fabrication of a custom reception desk for a New rationalize the framework of the desk based on
York based law firm. The primary challenge here was the material constraints of creating a continu-
to develop a pliable 3d parametric model in order to ous Corian surface.

Phases: Fabrication, Installation


Software: Rhino 3D, RhinoCAM, Grasshopper, AutoCad
Role: Project Management, Shop Drawings, 3D Model, CNC
Fabrication Package, Coordination of Installation

4" MAX

8" MAX

3" TYPICAL

EVANS AND PAUL UNLIMITED. Phases: Concept Design, Fabrication, Installation


Backlit Wall Panels for Traxon Technologies Software: Rhino 3D, RhinoCAM, Grasshopper, AutoCad
Role: Concept Design, Project Management, Shop Draw-
February 2010
ings, 3D Model, CNC Fabrication Package, Coordination of
Installation
Traxon Technologies is an architectural LED lighting depths to create variation in light intensity as
manufacturer who asked us to develop a backlit wall experienced from the front of the surface.
panel system to showcase in their show-room .

I created a parametric model that deploys a pattern


logic onto a surface based on the surface’s curva-
ture. This pattern was then back-gauged at different
STANISLAV VINOKUR
email. stanislav.vinokur@gmail.com
tel.347.517.8237

EVANS AND PAUL UNLIMITED.


Corian Tub
Bernsohn & Fetner
July 2010

Phases: Fabrication, Installation


Software: Rhino 3D, RhinoCAM, AutoCad
Role: Project Management, Shop Drawings, 3D Model, CNC
Fabrication Package, Coordination of Installation

Fabrication of a 8 foot in diameter 100% Corian construc-


tion tub. The challenges of the project included devel-
oping multiple molds and structural frames. The tub was
fabricated in 3 sections and required on-site seaming.

EVANS AND PAUL UNLIMITED.


Reception Desk
Herman Miller
January 2010

Phases: Fabrication, Installation


Software: ArtCAM, AutoCad
Role: Project Management, Shop Drawings, CNC Fabrica-
tion Package, Coordination of Installation

At Evans and Paul I was the lead designer of the Herman


Miller for Healthcare product line. Herman MIller is a pro-
ducer of a standardized steel framing system. We were
approached to develop a systematic way for outfitting
the prefabricated steel frame structure - with multiple
skinning options(Corian, Wood, Laminate).
STANISLAV VINOKUR
email. stanislav.vinokur@gmail.com
tel.347.517.8237

SIMONE GIOSTRA AND PARTNERS


SolPix - Solar Powered Media Louver System (Built)
Cooper Hewitt - 2010 Design Triennial
August 2008 - March 2009

We were asked to design a site specific installation for in the conservatory of the Cooper Hewitt mu-
the 2010 Cooper Hewitt Design Triennial. The project seum, Cooper Hewitt Museum. The louvers sit to
was based on a previous project by sgpa - greenpix. the exterior of the building enclosure, collect-
Greenpix is based in Beijing and is the world’s largest ing energy via embedded photovoltaic cells Phases: Concept Design, Schematic Design,
zero-energy media facade. used to power an array of LED’s. These LED’s Software: Rhino 3D, VRay, Grasshopper, AutoCad, Ecotect,
project an interactive pattern onto the frosted Adobe Creative Suite, Animation
The the installation showcases the design of a self- glazing enclosure. Role: Concept Design, Presentation Material, Site Survey,
sustainable media facade. Solpix installation is based Client Meetings.

You might also like