Sanitation Project:
Introduction: As per contract agreement consultants are required to submit standard design
in respect of civil and structural components, which are likely to come in water supply and
sewerage scheme. Consultants have come across different documents, World Bank guidelines
and manuals that were made available by the department. After study all the aforesaid
materials it is our view that civil and structural components for water supply and sewerage
schemes already executed by the department conform to the standard IS specifications in
respect of material and construction but specific guideline in respect of design is not
available. Therefore, consultants have tried to prepare the design guideline as per detail under
section A, B, C & D. These guidelines are strongly recommended for compliance.
A. Structural Analysis:
II. Working Stress Method (Appendix B of IS 456:2000) When Limit State is not
found convenient
III. Structural frame Analysis shall be done using software Staad Pro-2006
V. Concrete:
• Mild Steel and Medium Tensile Steel Bars conforming to IS 432 Part
1
VII. Cement:
V. Concrete:
VII. Cement:
Note:
1. Reservoir supporting frame and its foundation for OHSR shall be analysed
using software Staad Pro 2006
4. All water retaining structure shall be designed under no crack condition and
for which general guidelines as specified in IS 3370 shall be followed.
6. All civil foundations for OHSR shall have pile foundation where soil bearing
capacity is found less than 5 ton/m2 . Size of pile cap, type of pile and sizes
shall be as per soil report and village specific.
8. Design of dome type OHSR having capacity 25 cum to 300 cum has been
done keeping height of water fixed .Similarly design of intze type OHSR
having capacity 300 cum to 400 cum has been done keeping height of water
fixed. Design of dome type OHSR having capacity 250 cum to 300 cum has
been done keeping diameter of tank fixed and providing annular ring type
foundation.Similarly design of intze type OHSR having capacity 300 cum to
400 cum has been done keeping diameter of tank fixed and providing full raft
foundation. Full Raft foundation of dome type OHSR having capacity 250
cum to 300 cum(Height fixed) has been designed as an alternate to annular
ring type.
9. The RCC structures which are in contact with water or water vapour shall be
designed as water retaining structures in reference to IS 3370.
10. Design of pile foundation shall be as per soil report and conform to general
guidelines of IS: 2911-1979(reaffirmed 1997)
1. Loads
a) Dead Load – IS 875 (part 1)
b) Imposed Load
• Live Load – IS 875 (part 2)
• Crane Load/ Equipment Load – As per actual
• Dust Load
• Earth Pressure – IS 1893 (part 1)
c) Wind Load
d) Earthquake forces
e) Erection loads
f) Accidental loads
g) Secondary Effects
2. Load Combination
a) DL + IL
b) DL + IL +Wind or Earthquake Forces
c) DL + Wind or earthquake
d) DL + Erection Load
4. Checking of deflection
6. Material
Civil & Steel Structure components are likely to be encountered for the Water Supply
Schemes are as follows:
A. Water Supply :
A1. Civil Structure Components for Canal based Water Supply Scheme:
Single village Multiple Village
1. Intake 1. Intake Canal/ Regulator gate/Inlet
Canal/ Regulator gate/Inlet Chamber
Chamber 2. Sedimentation tank for Raw Water
2. Sedimen 3. Raw Water Sump
tation tank for Raw Water 4. Pump Chamber & Operator Room
3. Raw 5. High level tank
Water Sump 6. Slow sand filter bed/ rapid sand
4. Pump filter
Chamber & Operator Room 7. V notch
5. High 8. Clear water tank
level tank 9. Disinfection unit
6. Slow 10. OHSR
sand filter bed/ rapid sand filter 11. Distribution mains and feeder lines
7. V notch 12. Valve Chamber for
8. Clear • Sluice valve
water tank • Air valve
9. Disinfect • Scour Valve
ion unit
10. OHSR
11. Distribut
ion mains and feeder lines
12. Valve
Chamber for
• Sluice valve
• Air valve
• Scour Valve
A2. Civil Structure Components for Tube well based Water Supply Scheme:
Single Village Multiple Village
1 Pump House along with Operating 1 Pump House along with Operating
room, Disinfection Unit room, Disinfection Unit
2 Overhead Storage Reservoir 2 Overhead Storage Reservoir
3 Distribution main & feeder Lines 3 Distribution main & feeder Lines
4 Valve Chamber 4 Valve Chamber
• Sluice Valve • Sluice Valve
• Scour Valve • Scour Valve
• Air Valve • Air Valve
B. Sewerage :
B
Sewerage Scheme
1 Key Plan
2 Flow Diagram
3 Layout of sewerage Lines
4 Facultative Pond
5 Maturation pond
6 Manhole of different depths
7 Inspection Chamber
8 Bedding for pipes (CI/SW/PVC)
9 Longitudinal Section
10 Pavements
11 Pipe Joints
12 Collecting Tank
13 Pump Chamber with Operator’s Room
14 Clean out
15 Trench for Laying of Pits
16 Wicket gate
17 Sludge disposal
18 Truss for composting pit
19 sludge drying bed
20 Septic Tanks