Professional Documents
Culture Documents
Travel
Quantity Symbol Process Remarks
Feet
Storage in tube cradle
Use overhead
55 tubes 0 Lifting using crane
crane
Time in crane
Loading on to trailer
travel minimized
Trailer pulled by truck to Dept. 91 Eliminate Dept.
1840
stores 97 and rack
10 tubes Loading onto trailer with crane
Turning
Cutting
Washing
726 Eliminate
Ejection into tub
pieces container
In tub
Blanking
Restriking
Flattening
3000
Loading into tub
pieces
In tub
Washing
3000
Unloading into tubs
pieces
In tub
Weighing for verification of
count
Transported by gasoline lift
1265
truck to Dept. 41
Unloading beside sand
blasting machine
Loading into sand blasting
machine
Sand blasting
Extraction of grit
3000
Shoveling into tubs
pieces
In tub
Verification of counts
Loading onto gasoline lift
1 tub
truck
Instead of taking to dept. 43 for
3000
Loading into bins by hand putting into boxes, just put into
pieces
bin straightaway at dept.41
In bins
Transportation to welding
1 bin
assembly fixtures in Dept. 42
Positioning on assembly
fixtures
Process chart --- Assembly
Travel
Quantity Symbol Process
Feet
Storage near welding machine
Gas welding
Inspection
Storage