Tim Reddick Contracting, LLC

Project Name : Date : Subcontractor ASA Building 12/7/2011 Day of Week : (Pick One) Personnel on Site

Daily Log Report


M Th Sa Work Performed T F Su W

None, the site was visited after hours for a more complete site walkthrough

Safety Protocals There has been a fence installed surrounding the perimeter of the building, this is to keep pedestrians out of the work zone A guard rail system has been installed for the heights around the building including: the roof, the lifts, the scaffolding, and even the stairwells and open holes through the floor inside the building PPE for all visitors on site includes: high visibility vests, hard hats, long pants, gloves and safety glasses

Equipment on Site All Terrain Fork Lift - (4) Welding Machine/Compressor - (1) Man Baskets/Cherry Pickers - (3) Hydraulic Scaffold - (1) Interior Scissor Lifts - (10) Ladders (ranging in size) - (20+)

Temperature :

AM PM

40 35

Weather Conditions Conditions : AM PM

Rain Rain/Snow

402 Apartment L Berryfield Lane Blacksburg, Virginia, 24060