Project Name : Date : Subcontractor ASA Building 12/7/2011 Day of Week : (Pick One) Personnel on Site
None, the site was visited after hours for a more complete site walkthrough
Safety Protocals There has been a fence installed surrounding the perimeter of the building, this is to keep pedestrians out of the work zone A guard rail system has been installed for the heights around the building including: the roof, the lifts, the scaffolding, and even the stairwells and open holes through the floor inside the building PPE for all visitors on site includes: high visibility vests, hard hats, long pants, gloves and safety glasses
Equipment on Site All Terrain Fork Lift - (4) Welding Machine/Compressor - (1) Man Baskets/Cherry Pickers - (3) Hydraulic Scaffold - (1) Interior Scissor Lifts - (10) Ladders (ranging in size) - (20+)
Temperature :
AM PM
40 35