Executive Summary
In the July 7 2009 Commission Meeting the Administrator received authorization to engage the Architect TVS to complete a parking analysis for the TEE Center This report summarizes the assessment of the existing parking conditions during peak
convention hotel occupancy and presents findings and recommendations
The results of this study vary from the information previously used to estimate the need and subsequent costs of the proposed parking deck The existing parking use data that was previously used was supplied by the hotel staff This study confirmed that there
was a variance in the data provided previously and the results of this study
Parking Assessment
First the current parking inventory was collected and verified The parking on site is provided in a parking deck and finro parking lots In total approximately 712 spaces exist on site This parking is primarily used by the hotel guests and staff however during
parking deck
normal business hours office tenants use both the Staff Lot and the lower level of the
Second to develop a better understanding of the peak hour parking demand we collected hourf parking occupancy counts of all parking spaces in the study area
including the parking spaces in the adjacent vacant lot on a day that was predetermined as a typical busy day for the conference center The day selected was September 18
could capture a vast majority of guests checking in for the following day We also observed parking at late in the night on September 17 to understand the overnight
needs of the hotel on a night when all of the rooms were booked On the day of our data collection the hotel was 100 booked for that evening while the conference room
occupancy was close to 95 At night the conference center had two dinners and a dance occurring The peak hour of parking occupancy occurred at 11 am when 365 00 spaces were occupied This peak hour of parkinq activitv represents approximatelv 49
the parkers were tenants of the adjacent office building or roughfy 30 to 40 spaces It appears that many of the hotel guests attend the conferences and meetings held at the
conference center In addition it appears that Augustino the on restaurant is s site
hotels with similar conference space and restaurant space hotel room
used primarily by hotel guests With this in mind it appears that the peak hour parking
demand of 365 spaces is very consistent with parking dernand that we typicaliy see at
Thirci in order to estimate future parking needs we wili devefop a demand ratio based
on conference room space Based on a total of 41 square feet of conference room 000 space utifized on the day of our study we have developed the fo peak hour lowing
parking demand ratio for the complex that we will use for estimating future parking
demand 365 spaces feet The Augusta
TEE Center expansion will displace approximately 275 parking spaces Therefore without adding any additional parking the available number of parking spaces for the conference center will be approximately 437 spaces 712 on site 275 displaced spaces spaces 437 spaces In order to accommodate future parking conditions we will assume that the hotel is 100 occupied and that there are nighttime events scheduled at the conference center in addition to daily conference events From
conversations with staff the conference center routinely hosts nighttime events such as
weddings ballroom dances receptions and dinners Based on this understanding we have estimated that an additional 300 parking spaces are needed for accommodating
the expansion of the conference center
Recommendations
There are several options including operations and sharing changes that should be
considered for expanding and improving parking for the expansion of the TEE Center
Operations and Sharing We recommend that the on parking be dedicated to hotel site guests and staff only not the adjacent office building Since the parking needs will mosfi fikely peak at night we recommend shared parking strategies for providing the parking supply that the conference center will need Using the private lat off of Reynolds Street and the parking lot associated with the office building for nighttime events makes a
great deal of sense since they are both relativefy close to the hote center conference
These initiatives would certainly be the least expensive fastest and easiest to implement With respect ta parking development options we recommend the following
two options
Option I Sueface Parkinq in Surroundinq Areas
The development of a 300 space surface parking lot adjacent to 9th Street behind the retail The surFace lot could utifize pay stations for generating revenue on a daily and nighttime basis This parking option has several advantages inciuding
inexpensive surface parking construction costs
possibility of future building development disp the surface parking Isaving acing
inadequate parking for
the TEE Center
Assumes land is donated If not donated then the land acquisition or lease costs
will add to the total project budget
spaces this altemative would require the shared use of the other parkinq lots such as the private lot 120 spaces along Reynolds and the office building parking lot 150 or
spaces to accommodate peak hour parking needs
Option 2 Parkinq Deck
would consist of
d Bui a parking garage on the private parking lot along Reynolds Street We recommend a parking structure that provides 400 spaces 120 x 300 for accommodating both the private 100 spaces and the conference center needs 300 spaces The structure The
a
i
a
t ryt
y
F
F
1
Parking Study
7
i
I
4 r
iH
x
y t r ui
m
t
r
n
jx
n p
I
x
i
v e
k
g s i
I
k
R
f i
t r y
k
u l
m
y v ri
x t
y w
e
ki
NS
ys
f
I
i t
kLL
ev 7
EERS EC N C
x r
Atlanta GA 30328
T 770 850 30fi5
Table af Contents
Background Introduction
Approach
Findings
Recommendations
1 T r Haa
ENGINEERS
ARCHITECTS
TimHa
Eh7GINEERS
RRCHF7BCTS
Background Introduction
Timofihy Haahs and Associates TimHaahs has developed a Parking Study to assess the current and future parking needs of fhe Augusta i Center in Augusta Georgia EE
The Augusta TEE Center includes two hotels the Marriott Hotel nn and the Marriott Suites Hotel providing a tota of 372 rooms and approximately 44 square feet of 168
meeting and conference room space Figure 1 below depicts the Augusta TEE Center
and adjacent properties including a muiti office building off of 10 Street and retail story along 9 Street
Figure 1
r M
y
z Fx
r
y
S
r
p i
p r r
t i y Yr
1
nd n
J tl
h
rt
h
k
yap 1 f4 x 3 51 pF7
c
tq
4 u 19 uJ
wk
t i 0I k A y 4
y
uY
F
1t
u
iu
r
yF
r
a qiF r at es lYl aa
r
s
t
zy
a
r
ff
The Augusta TEE Center is about to embark on an expansion that will add approximately 40 square feet of new exhibit and conference room space The 000
expansion is outlined in blue in Figure 1 above and essentially brings tne conference center out to Reynolds Street The existing parking that serves the Augusta TEE Gente consists of two parking lots and a parking deck two fevels totaiing 712 parking spaces An adjacent vacant lot provides approximately 30 spaces for hotef stafE
October 2009
aS 1H Ter
ERS ENGINE
ARCHtTECTS
When complete the Augusta TEE Center expansion will displace approximately 275
parking spaces a majority of these in the parking deck plus all of the spaces found in
the vacant lot currently used by hotel staff
B
Approach
The current parking inventory was collected and verified The parking on site is provided in a parking deck and two parking lots In total approximately 712 spaces exist on site This parking is primarily used by the hotel guests and staff however during normal
business hours office tenants use both the Staff Lot and the lower level of the parking
deck
To develop a better understanding of the peak hour parking demand we collected hourly parking occupancy counts of all parking spaces in the study area including the parking spaces in the ad vacant lot on a day that was predetermined as a typical busy day acent
for the conference center The day selected was September 18 2009 We starting
collecting our counts at 7 am and went to 7 pm so that we could capture a vast 00 00 majority of guests checking in for the following day We also observed parking at late in the night on September 17 to understand the overnight needs of the hotel on a night
when all of the rooms were booked On the day of our data collection the hotel was
100 booked for that evening while the conference room occupancy was close to 95 a At night the conference center had two dinners and a dance occurring So based on
typical busy day conditions
Current Conditions
our discussions with hotel staff and the General Manager we felt that we were observing
Overall there are a total of 742 spaces that are used by hotel guests office tenants and
hotel staff Table 1 below provides a breakdown of the parking spaces
Table 1 Time of Day
Parkin
Area
aces
00 8
00 9
00 10
00 11
Noon
0 1
00 2
00 3
00 4
00 5
00 6
00 7
P2 Deck
216
171
166
164
167
163
85
86
83
86
111
156
162
Deck P1
283
65
72
84
82
79
54
60
51
54
67
62
80
Valet
Parking
56
10
11
s Augustino
Staff Lot
Lot
35
26
32
30
32
31
22
24
19
20
18
12
25
122
14
34
47
45
50
50
42
40
44
33
28
38
Vacant Lot
30
27
30
30
3D
30
29
27
32
26
23
27
24
Totats
742
313
345 io 46
363 49
365
360 49
248 33
246
232
31
237
260
294 40
337 45
ed OCCUp
42
0 49
33
32
35
October 20Q9
1iHtS
ENGINEERS
ARCHkTBCTS
Per Table 1 the peak hour of parking occupancy occurred at 11 am when 365 00 spaces were occupied This peak hour of parking activity represents approximately 49 utilization of all parking spaces Of this number we estimate that a minimum of 10 of the parkers were tenants of the ad office building or roughly 30 to 40 spaces acent
It appears that many of the hotel guests attend the conferences and meetings held at the
Future Conditions In order to estimate future parking needs we will develop a demand ratio based on conference room space Base on a total of 41 square feet of conference room d 000 space utilized on the day of our study we have developed the following peak hour parking demand ratio for the complex that we wilf use for esfimating future parking demand 365 spaces 41 square feet of occupied space 000 0 000 9 spaces square feet
0 1000 9 spaces SF is consistent with recommended conference center parking demand per several sources including Urban Land Institute ULI Shared Parking Second s
The Augusta TEE Center expansion will displace approxirnately 275 parking spaces A majority of the displaced spaces will come from a reconfguration of the exis parking ing deck The balance of displaced parking spaces will come from the Staff Lot Therefore without adding any additiona parking the available number of arking spaces for the conference center will be approximately 437 spaces 712 on spaces site 275 dispfaced spaces 437 spaces In order to accommodate future parking conditions we wifl assume that the hotel is 100 occupied and that there are nighttime events scheduled at the conference center
in addition to daily conference events From conversations with staff the conference
center routinety hosts nighttime events such as weddings ballroom dances receptions and dinners We understand that these events happen at least once a month if not more Based on this understanding we have estimated that an additional 300 parking spaces are needed for accommodating the expansion of the conference center as outlined in Table 2 found on page 4
October 20Q9
aa Tirn
GiNEERS Ei
iRCHfTf
Tabie 2
712
s
Spaces
to
Fxparision
a t
275
437
Spaces
S aces
370
3
360
730
Spaces
a o arktn TP 5
Spaces
S aces
730
437 293
Spaces Spaces
S aces
Parking lmprovement
We be there are several options that decision makers should consider for ieve expanding and improving parking for serving the expansion of the TEE Center For example we would strongfy encourage that the on parking is deciicated to hotel site guests and staff onfy not the adjacent office buiiding Since the parking needs will most likely peak at night we strongly encouraae shared parkinq strateqies for providing the parking supply that the conference center wil need
Using the private lot off of Reynolds Street and the parking fot associated with the office building for nighttime events makes a great deal of sense since they are both relatively ose c to the hotel center These initiatives would certainly be the least conference
expensive fastest and easiest to implement
With respect to parking development options we suggest the following options Option
1a
consists of building 300 well defined surface parking spaces behind the retail on
9 Street Option 1 b in Figure 2 on the following page consists of building 18Q shown
well defined surface spaces in a smaller lot behind the retail on 9 Street The
advantages of building either Option 1a or 1b include
inexpensive surface parking constr costs uction opportunity to develop revenue for the fand owner
safer fink to the hote as one would not have to cross Reynolds Street for
access
any future building development wou displace parking d Buifding Option 1 b would require the shared use of other parking assets to rtzeet
peak hour needs
We woufd suggest that pay stations be instalfed for colfecting daily and nighttime revenues As mentioned above if Option 1 b were built additional parking will be needed to meet the peak hour needs of the conference cenfier This additional parking could include the shared use of the private fot 120 spaces along Reynolds and the or office building parking lot 150 spaces
October
2009
4 Ha Tir
Figure 2 Option 1 b Parking Lot Devefopment
J
i y
u
t jl
a
f
s n
r y
e l
p
i
a
x
a
t
i
A
h
L
q
M
t
i
e hk
1
a
E
P
x w lr
f
r t
i e u
3b u
Option 2 consists of building a parking garage on the private parking lot along Reynolds
Street As shown in Figure 3 we would suggest a parking structure that provides 400 to 420 spaces 120 x 300 for accommodating both the private 100 spaces and the conference center needs 300 spaces The structure would consist of a simple four level two single threaded helix design The benefits of this site include bay
building one structure capable of handling all parking needs
relatively close to the conference center
greater construction and land acquisition costs crossing busy Reynolds Street to access the conference center
r
y
na
etr
ra
a
4
9
r
w s i
e
F4 s M J S a
M r as
t
c A
9 fi 4
7
P
1
ro
r
aa ya
x
aF i
M v
z
t Ct
y
FT z
yw
1
b
i
p
i K
9
i t
h
i
qE
y
M
a
e
r
i
t
r
s
r s
October 2009
a TimH
FRS ENGINE ARG
Recommendations
Currentiy it appears that the peak hour need for the conference center and hotel
is approximately 365 spaces
In total 742 spaces exist for hote guests and staff 712 on and 30 off site site
In addition to these users at least 30 to 40 parkers from the adjacent affice
Inn
building utilize the lower level of the parking deck and the parking lots located in
front of the Marriott Hotel
The Augusta TEE Center expansion will displace approximatefy 275 spaces in
both the parking deck and the surface lot
After the expansion only 437 spaces will remain for serving the conference
center We estimate that the peak hour parking demand of the conference center after the expansion will be approximately 730 spaces therefore
approximately 300 spaces are needed for meeting future peak hour parking
needs
There are several parking initiatives worth consideration for meeting the future
needs of the conference center At the very least we strongly encourage that
that office building tenants park off site We also strongly encourage the shared use of adjacent parking ots such as the office building fot 150 spaces and the private lot along Reynolds Street 120 spaces as these will be the least expensive and most readily available parking initiatives to carry forward
We recammend considering the following surface parking options Opfion 1 a
construction of a 300 space parking lot behind 9 Street Option 1 b construction of a 180 space parking lot behind 9 Street The surface parking options provide proximity safety low construction costs and land ownership thai make them attractive options If Option 1 b is considered additional parking will
be needed to meet the peak hour needs of the conference center such as
sharing the private parking located along Reynolds Street or behind the office
building adjacent to the Marriott Hotel
Option 2 consists of the construction of a 400 parking deck on the privatE space lot along Reynolds Street A four deck would provide the parking needed level
for both private and conference center use This option would place the conference center parking a single structure and be relatively close to s in
conference center however it would also require one to cross Reynolds Street invofve land acquisition costs and cost more than surface parking
In sum we believe that the combination of sharing existing parking resources and the construction of either a surface lot or a parking structure on the
October 2009
D R STANDA FORM OF CONTRACT FQR ARCHI SERVICES TECTURAL Augusta Trade Exhibit and Event Center
January 14 2010
October 2008 BETWEEN the Owner Augusta Georgia a political subdivision of t e State
of Georeria actine bv and throush the Richmond Countv Commission and the Design
Consultant Thomson Ventulett Stainback and Associates Inc for Professional Services
known as Architectural Design Services for Augusta Trade Exhibit and Event Center
Aueusta Richmond Countv Geori and a
WHEREAS
the
parties
to
this
AGREEMENT
further
agree
that
said
AGREEMENT should be modified to reflect the mutual desires of the Owner and Design
Consultant to facilitate an increase in the scope of the project adding design services for a
400 Parking Deck as described herein and
BASIC SERVICES
TICLE AR 8
COMPENSATION
TICLE AR 20
ENTIRE AGREEMENT
EXHIBIT A
BASIC SERVICES
made
part
of
this
AGREElVIENT
and
designated
as
TICLE AR
COMPENSATION
AMENDMENT 1
ARTICLE 20
All other terms and c of the AGREEMENT not specificallv amended onditions
This amended AGREEMENT together with referenced Exhibits A B and C constitutes the entire agreement between the Owner and Design Consultant and supersedes all prior written or oral understandings This AGREEMENT and said Exhibits may only be amended supplemented mociified or canceled by a duly executed written
instrument This AGREEMENT and said Exhibits shall hereafter be referred to as the
AGREEMENT
A2
In WITNESS WHEREOF the parties hereto have made and executed this
AGREEMENT as of the date noted
OWNER
DESIGN CONSULTANT
Augusta Georgia
political
sy
Deke a
Date
S Copenhaver
og R
President
eue swchwander
Mayor
1Z
Date
Attest
Atte
Witness
Clerk
A3
ARTICLES 1 NO CHANGES 4
ARTICLE 5 BASIC SERVICES
1 5
The Architect shall provide the basic services as described in Exhibit A amended
herein to include the TEE Center and 400 Space Parking Deck
ARTICLES 6 AND 7 NO CHANGE5
ARTICLE 8 COMPENSATION
The Architect shall receive the following compensation in addition to the TEE Center compensation for the Parking Deck Basic Services 471 Four 425
Hundred Seventy One Thousand Four Hundred and Twenty Five Dollars and No Cents plus reimbursable expenses not to exceed 45 Forty Five Thousand 000
Dollars and No Cents
ARTICLES 9 19 NO CHANGES
ARTICLE 20
A4
EXHIBIT A
BASIC SERVICES
AMENDMENT 1
Add to paragraph 1
The services are herein amended to include a new 400 space parking deck located across from the TEE Center All basic services as outlined herein shall be provided for the new
parking deck except for LEED certification services
AS
EXHIBIT B
PROGRAM OF
REQUIREMENTS
AMENDMENT 1
Add to the end of paragraph 1 The program for the new parking deck shall be as follows
A Project Understanding
1 Project Parking Deck and Surface Parking Lot based on the Final Parking Study
prepared by Timothy Haahs Associates Inc
2 Project Location The project is located on the corner of Reynolds Street and James Brown Boulevard in downtown Augusta across the street from the new Augusta TEE
Center conference facility The site includes an existing service station currently a hot dog stand on the corner of Reynolds and James Brown that will need to be addressed with Historic Augusta The design must also be sensitive to an adjacent television
satellite dish farm and another historic property adjacent to the northwest corner
3 Project Description The project is a new ground up parking garage of approximately 400 parking spaces Although it will be managed independently the new deck will
support the viaitors of the TEE Center The architecturally skinned deck will be open and front onto at least two urban street edges Should expansion be considered it is assumed that it would not be vertical but horizontal If the final design of the deck includea a parking area currently used by the adjacent television station satellite trucks accommodations will need to be made within the deck for the taller vehicles 4 Project Program We understand that the project will include 400 parking spaces
5 Project Budget We understand the approximate Construction Contract Award Price CCAP to be 7 Seven million one hundred twenty thousand dollars 00 000 125 five 6 Project Delivery Method The project will be constructed by a Construction Managex At
Risk independent of the Augusta TEE Center construction project
B Project Team
Associates P C
2 The following special consultants design services are included in this proposal
i ii
Haas
Associates Inc
Worley
C Compensation
1 Compensation Provide the total lump sum filced fee per the following phase schedule
for design and construction administration services
Phase
Amount
Schematic Narrative
Design
Design
Permitting
and
Negotiation Bidding
Construction Administration
Final Total
Completion
ced Design Service Lump Sum Fi Fee
Expenses allowance
Total Labor and
Expenses
Amount
Design
Architect
00 000 80
Local 3
20 26
00 500 123
30 40 15 7
00 000 190
00 725 33 00 700 19 00 500 18 00 000 6
18 4 92 3 127
Graphics
Jones
Worley
Johnson
Security Leppard
Total
of Local
Participation Participation
65 73
35 26 00 100
00 225 347
Total
of non Local
00 200 124
00 425 471
EXHIBIT C
SCHEDULE
AMENDMENT 1
The schedule for the new parking deck shall provide for a substantial completion date no
later than December 31 2010