You are on page 1of 59

System Analysis and Design TABLE OF CONTENTS Chapter 1 1.0 Introduction 1.1 Scope 1.2 Objective 1.

3 Preliminary investigation 1.4 Fact finding techniques 1.4.1 Interviews 1.4.2 Summary of Interviews 1.4.3 Surveys 1.4.4 Summary of Surveys 1.5 Problems of the current system 1.6 Proposed solutions to the problems 1.6 Benefits of the proposed system 1.7 Conclusion

Group Project

Page# 6 6 7 7 7 7 7 8 8 8 8 9 10

Chapter 2 2.0 Feasibility 2.1 Technical Feasibility 2.1.1 Hardware 2.1.2 Software 2.1.3 Machines 1

Page# 10 11 11 11 11

System Analysis and Design 2.2 2.2.1 2.3 2.3.1 2.4 2.4.1 2.4.2 2.4.3 2.4.4 2.4.5 2.4.6 2.5 Operational Feasibility PIECES Schedule feasibility Task Description Economic Feasibility Cost-Benefits Analysis Pay Back Analysis Pay Back Analysis Graph Explanation of Pay Back Analysis Return on Investment Analysis Explanation of Return on Investment Analysis Conclusion

Group Project 11 11 12 13 14 15 15 16 16 17 17 17

Chapter 3 3.0 Data Flow Diagrams 3.1 Context Diagram 3.1.1 Explanation of Context Diagram 3.2 Level 0 Diagram 3.2.1 Explanation of Level 0 3.3 Level 1 Diagram 3.3.1 Explanation of Level 1 3.4 Data Dictionary 3.4.1 Data Flows 3.4.3 Data Store 3.4.4 Processes 3.4.5 Entities

Page# 18 18 19 21 20 22 22 23 24 33 35 39

System Analysis and Design

Group Project

Chapter 4 4.0 Sun Video Corporations Logo 4.1 Main Menu 4.2 Customer 4.3 Video Return 4.4 New Customer Registration 4.5 Customer Payment Details 4.6 Database Tables 4.6.1 Rent a Video Table 4.6.2 Payment Details Table 4.6.3 Customer Table 4.6.4 Video Returned Table

Page# 41 42 43 44 45 45 46 47 49 51 53

Chapter 5 5.0 Gantt Chart 5.1 Conclusion 5.2 Reference 5.3 Appendix

Page# 57 58 59 60

System Analysis and Design

Group Project

ACKNOWLEDGEMENT In the beginning we would like to thank our GOD, the most merciful and beneficent, for giving us the strength to complete this project with full determination. My special thanks to my course instructor, Mrs. Ambreen Ahmed, without her help and guidance we would not have been able to complete the report up to the mark and as well if it was not for her support in the field of Microsoft acsses i dont think we would be able to present the screen shots in a appropriate way.

System Analysis and Design

Group Project

INTRODUCTION
This case study is about a video shop whose name us Sun Video Corporation. It has expertise in video rental business. Their plan is to have a series of stores scattered strategically around a metropolitan area. As being expertise in the video rental business they offer great deal for their customer and provide a competitive edge for their competitors. In this case we are required to do the work of the system analyst and go through each process which the system analyst performs.

SCOPE
As all of you know that as the world is advancing the need for new system have increased in every organization old systems are being replaced by new system, the reason behind this is that the organization demands excellent quality work more profit to be earned in short term and to gain more market share as quick as they can and to kick their competitors out of the market. New system is: User Friendly More Efficient They provide you with the latest security (I.E Fire Wall) U can use internet proving you with the better speed and quality so you could send and receive important e-mails

System Analysis and Design

Group Project

As mentioned above that what the new system does, our prime target is to create a new and reliable system for Sun Video Corporation as it is offering many facilities to its customers and it is proving a competitive edge.

OBJECTIVE
My objective is to make useful and user friendly system, so that non technical person can also under stand it. It is easy for the company to use the system, providing the system that would be designed for the company will consists of high security software (zone alarm version 9) so that no hacker can break inside the system and stole data and installing latest version of antivirus (I.E McAfee version 8.0) so the system is virus free and the data is secured

PRELIMINARY INVESTIGATION
After receiving the request from Sun Video Corporation regarding their system our team started its work with the very basic step that was searching for the problem by the method of fact and finding techniques and gather the information regarding the problem that was faced by the Sun Video Corporation.

FACT FINDING TECHNIQUES


This stage involves Interviews, conclusion, Survey, conclusion problem of the current system, proposed solution to the problem of the current solution conclusion

Interviews

System Analysis and Design

Group Project

This was the basic step taken by our team this main reason for conducting interview was that we would know that what are the problem that the company is currently facing and how is it affecting their business? Although taking interview is not an easy task but we manage to do it some how.

Conclusion
As a part of our first step we conducted this session and went to various people like the managing director the company, the sales manager, the cashier and asked them about the problem that they were facing, so that the information that they provide us would be later used on.

Surveys
The second step that our group took was going on to surveys of different famous and large video stores in order to see what is the main reason behind their success in the market and what type of system are they currently using ad what are the benefits that they are getting out of it?

Conclusion of Survey
Conducting survey was successes as it gave answer to most of are questions. Are prime target was achieve we gathered all the relevant information and the irrelevant information was discarded.

Problems with the current system


1. The problem that was detected and was commonly seen in the answer of interviews was that all the work was done manually, 2. There were a lot of records being generated on papers, which was very insecure if any thing happened to the store all the records would be destroyed and that would provide the company in a great loss, 3. No proper security arrangements every one was accessible to the personal records of every individual customer. 4. No privacy.

System Analysis and Design

Group Project

SOLUTION to the problems


After conducting the interviews and surveys it was observed that the company needed a latest system, in order to improve its quality so there fore we came up with the new system know as Video Rental System which was to use further to solve all the problems of the users and the corporation.

Advantages of the system to be introduced


By introducing this system the company would be in safe hands due to the latest software installed in the system which would prevent it from data hacking. 1. All the personal records would have right of privacy, as passwords can be easily generated with the help of password manager guide which is an 8 user guide, user friendly software which tells the user how to create a password and to use it.

2. It more reliable, Fast and user friendly. 3. It can generate automatic backup of each customer records. Incase the original one is deleted the system can provide the user with the back up. 4. It would be sending automatic notifications to the user who have rented videos for $50.

System Analysis and Design

Group Project

5. It will contain software which will the user on which shelf on what location is the particular video which the customer s looking for this will provide them with time flexibility and the customer would also be satisfied with this service. 6. Introducing this software would facilitate new customer enrolling and renting movies from Sunny Videos that will make them enjoy high profit.

CONCULSION
After performing the necessary steps it was founded that sunny videos manual way of working was more time consuming and it was not efficient to work with this system as no privacy right were available. Being the system analyst it was decided that it is necessary to introduce a new system for Sunny Video which is know as Sunny rental Video

FEASIBILITY
Feasibility report means to identify the problem and summarizing the complete objectives. It also creates broad data for the management team that would decide by looking at the objects whether to move on the new phase or not. There are 4 types of feasibility report which are mentioned below: 1. Technical 2. Operational 3. Economical 4. Schedule

System Analysis and Design

Group Project

Technological or Technical feasibility


Under this process the (IT) company determines weather the company has technological resources to compose or purchase the system. Thus we figured the technical feasibility report; we came to know the system which is proposed to the Sun Cooperation can be operated easily. The system replace the manually work and transform all the manually data in to computerize form .which would augment productivity. Training sessions are required for the employees to educate them to excel to the newly proposed system and to further understand and use the built in software that are inside the system to prevent their company from suffering great losses. Operational feasibility Operational feasibility helps to crack business problems and provide opportunities to business .Our system would help users to use the system effortlessly, thus eliminating the paper work. Through data entry the system would cradle all the records of the customers and hence the transactions made by sun video can be seen through any interface of sun video. Through this all the customers record would be maintain properly without fuss. It would show all the records of payment received, due dates, and pending payments. This 10

System Analysis and Design

Group Project

system would be user- friendly which would enable employees to learn and operate the system fester achieving productive results. Pieces framework Pieces stands for Performance, Information, Economy, Control, Efficiency, Services Pieces has merely 6 points. Performance The currant system is not that fast and efficient which waste sundry time in paper work even after that the transactions of the customers are not recorded properly thus arising conflicts between management and employees and customers .Thus performance is effected, through new system the whole thing would be computerized and the task would be done rapidly hence augmenting performance levels. Information The system will have its own data base through it the company can look and see all the transactions of the customers thus having information about all it customers . Economy The system would be computerized, user friendly thus it would enhance productivity, thus making the project economically strong. Perishing manually work thus codifying and organizing the data of the customers properly. It would reduce the more workers, thus cutting down the expanses and saving more money. Control Top management would have charge to control the system, thus it would decrease pilfering , providing security . Thus every employee would have limited excess. Efficiency The system would be computerizes all over thus it would coup with all sinecures like data entry, customer information, billing information resulting efficiency among employees eventually satisfying customers . Services

11

System Analysis and Design

Group Project

Our company would provide augment product or system thus in future if the sun cooperation needs to have new tools we would provide them. Thus upgrading the system.

Schedule Feasibility.
Is that feasibility under which our company will meet its deadlines, and task to gratify them? Under it we have set targets to finish what activity on which time.

Task completing dates


Feasibility report would be done in 3 days including technical, economical, operational, schedule.

Pieces framework would be done in 4 days which would include performance, information, economy, control, efficiency and services.

Investigation of (PI) will be done in 2days Requirements of users will be done in 2.5 days Analysis of system needs would be done in 4days Development and documenting the software would take 8days Cost benefit analysis would be done in 2days

12

System Analysis and Design Payback analysis would be done in 1 day

Group Project

All the diagrams e.g. pert chart, data flow, level zero diagrams would be done in 5days

Level 1 diagram would be done in 3days Data store would be made in 1 day All Entities software would be done in 4 days Making of screenshots in 2 days

Economical Feasibility
Under this feasibility we analysis weather benefits in making the new system are more then the development cost. Is it profitable to take the task and make it? Will it going to provide any benefits to the organization.

COST-BENEFIT ANALYSIS Economic feasibility is performed by doing the cost-benefit analysis, which is the process of identifying the financial benefits and costs associated with the development of the project. The evaluation of our project is being done on the following strategies

13

System Analysis and Design

Group Project

PAYBACK ANALYSIS

It is the process in which the organization identifies the time period in which the system would pay back for itself. The costs in the development of this project and the profits attained are shown below:

Cumulative Year 0 1 2 3 4 5 6 7 8 9 10 Cost 50,000 20,000 18,000 14,000 17,000 19,000 21,000 23,500 25,000 25,000 27,000 cost 50,000 70,000 98,000 112,000 129,000 148,000 169,000 192,500 217,500 242,500 269,500 Benefits 2,500 10,000 20,000 25,000 35,000 50,000 52,000 55,000 60,000 62,000 65,000

Cumulative benefits 2,500 12,500 32,500 57,500 92,500 142,500 194,500 249,500 309,500 371,500 436,500

14

System Analysis and Design

Group Project

PAYBACK ANALYSIS GRAPH

15

System Analysis and Design

Group Project

450000 400000 350000 300000 250000 200000 150000 100000 50000 0 1 2 3 4 5 6 7 8 9 10 11 Year Cost Cumulative cost Benefits Cumulative benefits

EXPLAINATION OF PAYBACK ANALYSIS This graph was made on Microsoft Excel which helped in analyzing By the looking at the above payback analysis graph it could be easily concluded that the system would payback for itself in the 6th year after its development.

RETURN ON INVESTMENT(ROI) ANALYSIS

16

System Analysis and Design

Group Project

ROI= (Total benefits Total costs) / Total costs ROI= (436,500 - 269,500) / 269,500 ROI= 167,000 / 269,500 ROI= 0.61

EXPLAINATION OF ROI According to the workings of the ROI the organization is getting 61% return on its investment.

CONCLUSION After performing different steps of feasibility it was concluded that our software is feasible and easy to use for the company. Now we decided to move on to the design phase.

17

System Analysis and Design DATA FLOW DIAGRAMS

Group Project

Data flow is known as a geographical figure of the data. DFD denotes the process which takes place in a system .it even shows how data evolve around through an information system. CONTEXT DIAGRAM

EXPLANATION OF CONTEXT DIAGRAM


18

System Analysis and Design

Group Project

The diagram says that the customers would interact with the system and it would show his/her id, it would include whose payments are outstanding, whose payment are done, whose videos are due. The new customer has to fill the form to avail membership for the sun video. System would generate reports and management would be accountable to see the report of the whole report... The accounts department would send cash which would received by customers.

EXPLANATION OF LEVEL 0 DATA FLOW DIAGRAM

19

System Analysis and Design

Group Project

This diagram was made by using viso .In this case the when the customer will give there id, the system would show customer payments, dues, etc. Accounts deportment sends cash. Customer record shows rental information to compose a report. Which would give to the management of the sun video. This system have information when the video is rented then its receipt is made and passed to the customers. Payment which are which are received from the accounts department is updated in customers records. If the customers comes to the bonus level those customers details are forwarded to the accounts department which generates motley or yearly schemes or bonus letters for those desire customers.

LEVEL 0 DATA FLOW DIAGRAM

20

System Analysis and Design

Group Project

LEVEL 1 DATA FLOW DIAGRAM

21

System Analysis and Design

Group Project

EXPLANATION OF LEVEL 1 DATA FLOW DIAGRAM In level 1 Data Flow Diagram, Customer Rental Record which is a data store sends customers yearly details to the Create Yearly Bonus Letter. It advances to Free Coupons Process which generates free coupons for the customer and both the items bonus letter and free coupon goes to Create Customer Certificate. These three items that are coupons, letter and certificate are sent directly to the customer.

22

System Analysis and Design

Group Project

DATA DICTONARY
Date dictionary is just like a dictionary which contains meanings of words, Data dictionary is made by the analysis to keep track and record of the information and thus it could be use further in future if required changes in the system. Data dictionary contains the meanings of words which are used in the system and data flow diagrams. It helps to Deplete redundancy Compose data flow in a constructive manner Provide aid on data stored files and save it Create deductive data flow processes

the data dictionary for this project is given below

23

System Analysis and Design

Group Project

Data Flows

Name Description Source Destination

: customer details : details of new customers : customer : add customer

Data Structure: customer name + address + telephone.

Name Description Source Destination

: customer details : details of new customers : add customer : customer rental records

Data Structure: customer name + customer id + address + telephone number.

24

System Analysis and Design Name Description Source Destination : customer info : update customer rental records : video return : customer rental records

Group Project

Data Structure: customer name + customer id + address + telephone number + returned videos

Name

: customer/Video ID

25

System Analysis and Design

Group Project

Description Source Destination

: identification of customer and video : customer : video return

Data Structure: customer name + address + telephone + identification code. Name Description Source Destination : video info : video rental information : video return : video rental record

Data Structure: available videos list + video returned

Name

: payment/dues

26

System Analysis and Design

Group Project

Description Source Destination

: details of payments : customer : payment received

Data Structure: amount of payment + mode of payment +customer ID.

Name Description Source Destination

: receipt : receipt of the payment made : receipt generation : customer

Data Structure: customer ID + amount paid

Name

: customer info

27

System Analysis and Design

Group Project

Description Source Destination

: updates the rental records : customer rental record : receipt generation

Data Structure: amount owed + customer ID

Name Description Source Destination

: payment received update : receipt of the payment made : payment received : customer rental record

Data Structure: amount paid + balances if any left + customer ID.

Name

: cash 28

System Analysis and Design

Group Project

Description Source Destination

: payment being paid : accounts : payment received

Data Structure: amount paid + customer ID.

Name Description Source Destination

: customer rental info : details about customers : customer rental record : create yearly free coupons.

Data Structure: ID + code+ name + rent paid + type of video issued.

Name

: customer rental info 29

System Analysis and Design

Group Project

Description Source Destination

: details about customers : customer rental record : create monthly letter discount coupon

Data Structure: ID + code+ name + rent paid + type of video rented.

Name Description Source Destination

: rental info : details about the movies rented : rental record : produce customer rental report

Data Structure: customer name + ID + rent paid.

Name

: report 30

System Analysis and Design

Group Project

Description Source Destination

: details about the customers and the videos : produce customer rental report : management

Data Structure: customer name + movies rented

Name Description Source Destination

: monthly coupon letter : certificates provided to customers : create monthly letter discount coupon : customer

Data Structure: customer name + Customer ID

31

System Analysis and Design Name Description Source Destination : yearly coupon letter : certificate issued yearly : create yearly free coupon : customer

Group Project

Data Structure: customer name + ID

Data Store
32

System Analysis and Design

Group Project

Name Description Input Data Flow

: customer rental record : all the details of a customer : customer details Payment received update Customer info

Output Data Flow

: customer rental info Rental info

Data Structure

: customers name + customer ids + addresses + telephone numbers + movies rented + amount balances + amount paid

33

System Analysis and Design

Group Project

Name Description Input Data Flow

: video rental record : all the details of videos : customer details Payment received update Customer info

Output Data Flow

: customer rental info Rental info

Data Structure

: customers name + customer ids + addresses + telephone numbers + movies rented + amount balances + amount paid

34

System Analysis and Design

Group Project

Processes

Name Description

: add customer : registering new customers

Input Data Flow

: customer details

Output Data Flow

: customer details

Process Specification: receives customer details verifies new customers sends customer rental card to customer and new customer info to customer record

35

System Analysis and Design

Group Project

Name Description Input Data Flow Output Data Flow

: video rental : manages the renting process : customer/video ID : video info customer info

Process Specification: checks request and issue videos sends out rental info

Name Description Input Data Flow

: payment received : recording cash transactions : payment/dues cash

Output Data Flow : payment received update Process Specification: takes in the payments.

Name

: receipt generation 36

System Analysis and Design

Group Project

Description Input Data Flow Output Data Flow

: makes receipts : customer info : receipt

Process Specification: takes in payment info and sends the receipt generated to the customer

Name Description Input Data Flow Output Data Flow

: create monthly letter discount coupon : produces monthly reports : customer rental info : monthly coupon letter

Process Specification: checks in customer final details and sends monthly coupons to various customers

37

System Analysis and Design Name Description Input Data Flow Output Data Flow : create yearly free movie coupon : produces yearly reports : customer rental info : yearly coupon letter

Group Project

Process Specification: checks in customer final details and sends yearly coupons to various customers

Name Description Input Data Flow

: produce report : makes final reports : rental info Video rental info

Output Data Flow

: report

Process Specification: takes in info about customer and videos and send the info to the management.

Entities
38

System Analysis and Design

Group Project

Name Description

: Customer : people wanting to rent video

Input Data Flow: receipts monthly coupon letter yearly coupon letter Output Data Flow: customer details customer/video ID payment/dues

Name Description

: accounts dept : manages all the finance of the organization and the system

Input Data Flow: Cash Output Data Flow: ---

Name

: management 39

System Analysis and Design

Group Project

Description

: manages the organization and the system

Input Data Flow: management report Output Data Flow: ---

Screen Shots

40

System Analysis and Design

Group Project

Our logo

This logo was designed with the help of adobe photo shop to provide a good look for the system

Main Screen:
41

System Analysis and Design

Group Project

Video RENTAL FORM:

42

System Analysis and Design

Group Project

This form shows the video id and the customer id that what particular movie has been issued by a particular customer

Video RETURN FORM:

43

System Analysis and Design

Group Project

This form tells that whether the VCD that was issued by the customer has been returned on the due date or not if not how much fine he has to pay for getting delayed.

VCD/DVD DISCRIPTION FORM:

44

System Analysis and Design

Group Project

This tell the customer that the movie they are looking for in what category is it available for (e.g in DVD or VCD)

45

System Analysis and Design

Group Project

NEW CUSTOMER ID FORM:

46

System Analysis and Design

Group Project

This is a plain form for a new customer to get enroll for the membership and start using sun videos services.

Table:
47

System Analysis and Design

Group Project

48

System Analysis and Design

Group Project

This table shows the amount of customer that have been enrolled to use the services of Sun Videos

49

System Analysis and Design

Group Project

Bonus Table:

This table tells about how many customers have been enrolled in the bonus scheme introduced by sun videos corporation.

50

System Analysis and Design

Group Project

Rent a Video:

51

System Analysis and Design This table shows that how man customer have taken the videos on rent.

Group Project

Payment Mode

52

System Analysis and Design

Group Project

This table shows that the fine that a particular customer has to pay when he extends his return date and the video is over due

Reports Customer:

53

System Analysis and Design

Group Project

Video Rental:

Video Returned:

54

System Analysis and Design

Group Project

This shows how many movies have been returned by the customer plus it is also showing the fine that if a customer gets late how much does he has to pay

Gantt Chart
55

System Analysis and Design

Group Project

This chart is made before starting the actual work. This helps us to plan each and every thing and go about it according to time and days

Conclusion

56

System Analysis and Design

Group Project

After putting hard effort on the designated proposal assigned by the Sun Videos corporation it gives me and my group the honor that the making of the new system was a complete success which in future will them to solve their problem, as new hard ware and software are being installed in the system and it is user friendly nd is easy for the management to understand .

REFERENCES

57

System Analysis and Design

Group Project

Reference By Book: Kendall.J,(1999), System Analysis and Design, 4th edition, Prentice Hall International, Cashman.T, (2001), System Analysis and Design, Course Technology.

APPENDIX

58

System Analysis and Design TASK SHEET Members 1. Bilal Mubashir

Group Project

Work Division Context diagram, level 0, level 1, Gantt chart. economic feasibility, designing the system

2. Mohsin Wahid

Context diagram, level 0, level 1, Feasibility

3. Usman Saleem

Introduction, technical feasibility, operational feasibility, schedule feasibility. fact finding techniques, economic feasibility, data dictionary.

4. Shoaib Mirza

Technical feasibility, operational feasibility, schedule feasibility.

59

You might also like