Tanzania Radiation Authorization Process

The document outlines the authorization flow chart for regulatory staff at the Tanzania Atomic Energy Commission to evaluate facilities using radiation and determine if an inspection is necessary before approving a license. Key steps include assigning regulatory staff, evaluating the facility's notification for necessary information, assessing radiation hazards and safety measures, determining if an inspection is warranted, notifying the client and collecting charges if inspection is required, conducting the inspection, and approving the license.

Uploaded by

Abdalah Kileo
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
182 views1 page

Tanzania Radiation Authorization Process

The document outlines the authorization flow chart for regulatory staff at the Tanzania Atomic Energy Commission to evaluate facilities using radiation and determine if an inspection is necessary before approving a license. Key steps include assigning regulatory staff, evaluating the facility's notification for necessary information, assessing radiation hazards and safety measures, determining if an inspection is warranted, notifying the client and collecting charges if inspection is required, conducting the inspection, and approving the license.

Uploaded by

Abdalah Kileo
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

AUTHORIZATION FLOW CHART .

FACILITY-CENTRE NOTIFICATION TO TAEC


REGULATORY STAFF ASSIGNED

No
REPORT AND COVERING LETTER TO INCLUDE MISSING INFORMATION

ARE ALL NECESSSARY INFORMATIONS INCLUDED?

Yes

REGULATOR EVALUATE

PERSON AT RISK

RADIATION HAZARDS

MEASURES IN PLACE

DOCUMENT FINDINGS

REVIEW AND AMEND

REGULATOR ASSESS IF INSPECTION IS NECESSARY

No
INSPECTION REQUIRED?

Yes

NOTIFY THE CLIENT INSPECTION AND NECESSARY CHARGE REGULATORY REPORT

FACILITY PAY NECESSARY CHARGES

TECHNICAL COMMITEE INSPECTION AT FACILITY REGULATOR FILL THE LICENCE FORM DIRECTOR APPROVE THE LICENCE LICENCE SENT TO CLIENT

PRE AUTHORIZATION INSPECTION AT FACILITY

TANZANIA ATOMIC ENERGY COMMISSION |RADIATION CONTROL DIROCTORATE | Eng ABDALAH KILEO