Upgrade Project Plan Following are the high level activities in the Upgrade project plan. The below structure can be used as a template and can be tailormade to build a comprehensive project plan. S.No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 DEV Upgrade Basis Copy of DEV to DEV* DB Upgrade (if required) OS Upgrade (if required) Back up of Security Roles Upgrade Preperation (Basis) Unicode Preperation (Basis) Change Transport Number rabge in DEV* Upgrade Activities (Basis) SPDD SPAU Post Upgarde Activities (Basis) Prepare Target Box for CUUC (Basis) Unicode Conversion Post Processing Backup after Unicode conversion Validate DEV Box Install 3rd Party Add ons Validate 3rd Party Add ons Custom Object Fixing
S.No 1 20 21 22 23 24 25 26 27 28 29 30 SNo
DEV Upgrade Basis Copy of DEV to DEV* UCCHECK Retrofit of the TRs that moved to PRD Unit Testing of the Objects Fixed Unit Testing of any critical process/ tcodes identified Adjust Security and Regenerate Roles SU25(A) SU25(B) SU25(C) SU25(D) KT to the Functional Team Develop Delta Training Material (Comparing screens between source and target versions) QA Upgrade
31
Basis Copy of QA or PRD to QA*
32
DB Upgrade (if required)
33
OS Upgrade (if required)
34
Adjust the Landscape (DEV* >> QA*)
35
Upgrade Preperation (Basis)
36
Unicode Preperation (Basis)
37
Upgrade Activities (Basis)
38
Apply SPDD/ SPAU Transports created in DEV
39
Delta SPDD/ SPAU
S.No 1 40
DEV Upgrade Basis Copy of DEV to DEV* Post Upgarde Activities (Basis)
41
Prepare Target Box for CUUC (Basis)
42
Unicode Conversion
43
Post Processing
44
Backup after Unicode conversion
45
Validate QA Box
46
Install 3rd Party Add ons
47
Validate 3rd Party Add ons
48
Move Transports (Upgrade + UCCHECK + Security + Retrofit) from DEV* to QA*
49
Check RFC connections
50
Connect all the interfaces pointing towards the QA*
51
Business Process Testing
52
Security Testing (if required)
53
Integration/ Interface Testing
54
User Acceptance Testing
SNo 55 56 57
PRD Upgrade DB Upgrade (if required) OS Upgrade (if required) Upgrade Preperation (Basis)
SNo 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73
PRD Upgrade Unicode Preperation (Basis) Upgrade Activities (Basis) Apply SPDD/ SPAU Transports created in DEV Delta SPDD/ SPAU Post Upgarde Activities (Basis) Prepare Target Box for CUUC (Basis) Unicode Conversion Post Processing Backup after Unicode conversion Validate QA Box Install 3rd Party Add ons Validate 3rd Party Add ons Move Transports (Upgrade + UCCHECK + Security + Retrofit) Check RFC connections and all interfaces connected to PRD Cutover activities (manual configs + validating TRs + Validation reports execution) System Go Live