Survey Control Points Discrepancy Report

The document contains correspondence between Hindustan Construction Co. Ltd. and the National Hydroelectric Power Corporation regarding discrepancies found in survey control points for the Uri-II Hydroelectric Project. Hindustan Construction requested survey equipment to verify control points and found differences of up to 5 meters when checking points against each other. They requested clarification from National Hydroelectric, who responded that the control points could still be used to start structural work while re-surveying is carried out.

Uploaded by

macsaravan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
176 views72 pages

Survey Control Points Discrepancy Report

The document contains correspondence between Hindustan Construction Co. Ltd. and the National Hydroelectric Power Corporation regarding discrepancies found in survey control points for the Uri-II Hydroelectric Project. Hindustan Construction requested survey equipment to verify control points and found differences of up to 5 meters when checking points against each other. They requested clarification from National Hydroelectric, who responded that the control points could still be used to start structural work while re-surveying is carried out.

Uploaded by

macsaravan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

Ref. No. HCCL/URI-II/007 Date: 22nd September 2005.

Camp at Salamabad

To,
The Chief Engineer,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
P.O – Uri, Dist. – Baramulla, J&K.

Ref. : Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II:Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub: Request for Issue of Survey Equipments on Returnable basis.

Dear Sir,

We request you to kindly issue the following Survey Equipments on Returnable basis.

1. Theodolite with tripoid – 1 no.


2. Level instrument with stand – 1 no.
3. Levelling Staff – 2 no.

Your co-operation in this regard shall be highly appreciated.

Thanking you,

Yours faithfully,
For Hindustan Construction Co. Ltd.

S. R. DUTTA
GENERAL MANAGER

C.C : Sr. Manager, NHPC @ URI - II , Rajarwani


C.C : Dy. Manager, NHPC @ URI – II, Salamabad

D:\Uri2 HEP\Contract\Survey\page-1
Ref. No. HCCL/URI-II/006 Date: 22nd September 2005.
Camp at Salamabad

To,
The Chief Engineer,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
P.O – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub: Survey Control Points – Technical Specification A 4.1(1)

Dear Sir,

Pursuant to the captioned subject, we request you to kindly furnish the documents / data relating
to Survey Control Points for necessary verification and confirmation as per TS A4.1(1).

Your co-operation in this regard shall be highly appreciated.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
GENERAL MANAGER

C.C : Sr. Manager, NHPC @ URI - II , Rajarwani


C.C : Dy. Manager, NHPC @ URI – II, Salamabad
D:\Uri2 HEP\Contract\Survey\page-2
Ref. No. HCCL/URI-II/024 Date: 15th November 2005.

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II:Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub: Survey Control Points – Technical Specification A 4.1(1)

Your letter no. :


Our letter no. : HCCL/URI-II/006 dated 22.09.2005.

Dear Sir,

With reference to the above, HCC has carried out joint checking of the Survey Control Points
provided by NHPC for necessary verification.

During joint checking it has been observed that there is discrepancy in the Survey Data provided
by NHPC as detailed below:
Survey Coordinates and Elevation provided Actual coordinates and elevations Remarks
Control by NHPC observed at site during joint
Point checking with NHPC surveyor
East North Elevation East North Elevation
A. Dam Complex
S-19 83706.790 116788.050 1269.967 83706.628 116788.062 1269.948 (a) with
TC1800
(NHPC)

83706.603 116788.066 1269.984 (b) with


TC407
(HCC)
U-12 84216.600 116747.220 1290.924 Station point at U-12 and back-sight to S-19

Survey Coordinates and Elevation provided Actual coordinates and elevations Remarks
Control by NHPC observed at site during joint
Point checking with NHPC surveyor
East North Elevation East North Elevation

B. Underground Complex
U – 13 82229.500 117890.120 1255.099 82227.708 117889.067 1255.010 with
TC407
S – 25 82135.430 117905.440 1259.007 82133.601 117904.288 1258.951 - do -
S – 26 81885.840 117937.180 1247.392 81883.898 117935.830 - - do -

As observed from the above chart there is a difference of (with respect to the initial survey
control point U-12),
(1) about 200mm in the other survey control points at Dam Complex, and
(2) about 2000mm in the other survey control points at Underground Complex.

Pursuant to sub-clause A.4.1(2), we would like to draw the Engineer-in-charge’s kind attention to
the above mentioned discrepancy and would request him to kindly advice in this regard.

The Engineer-in-charge’s early action in this regard shall be highly appreciated.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
PROJECT MANAGER

C.C : Sr. Manager, NHPC @ URI - II , Rajarwani


C.C : Dy. Manager, NHPC @ URI – II, Salamabad
D:\Uri2 HEP\Contract\Survey\page-3
Ref. No. HCCL/URI-II/062 Date: 30-Dec-05.
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity
Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II:Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.
Sub: Survey Control Points.
Your letter no. : 1) NH/URI-II/HQ/2005/769 dated 19.11.2005
Our letter no. : 1) HCCL/URI-II/006 dated 22.09.2005.
2) HCCL/URI-II/024 dated 15.11.2005
Dear Sir,
Further to our letter no. HCCL/URI-II/024 dated 15.11.2005, please find enclosed herewith the
complete report on survey work undertaken to check the accuracy of the existing basic survey
network and control points.
As evident from the said report, there is a difference of 5.208m (Northing) and 2.779m (Easting)
at Tailrace Outlet (Control Point No.U17) when checked with reference to Dam (Control Point
No.U12 & S19).
Pursuant to sub-clause A.4.1 (2), we would like to draw the Engineer-in-charge’s kind attention to
the above mentioned discrepancy and would request him to kindly advice in this regard.
The Engineer-in-charge’s early action in this regard shall be highly appreciated.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
PROJECT MANAGER
Encl : As Stated.
D:\Uri2 HEP\Contract\Survey\page-5
Ref. No. HCCL/URI-II/093 Date: 16-Feb-06.
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Ref. : Construction of Diversion Tunnel including Gates, Concrete Gravity
Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II:Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.
Sub : Request for Issue of Survey Equipments on Returnable basis.

Dear Sir,
We request you to kindly issue the following Survey Equipments on Returnable basis.

1. Theodolite with tripoid – 2 no.


2. Level instrument with stand – 2 no.
3. Levelling Staff – 2 no.
4. Radio Set with charger – 2 no.

Your co-operation in this regard shall be highly appreciated.


Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
PROJECT MANAGER

D:\Uri2 HEP\Contract\Survey\page-6
Ref. No. HCCL/URI-II/0102 Date: 03-Mar-06.

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II:Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub: Survey Control Points.

Your letter no. : 1) NH/URI-II/HQ/2005/769 dated 19.11.2005


2) NH/URI-II/HQ/2005/1051 dated 17.01.2006
Our letter no. : 1) HCCL/URI-II/006 dated 22.09.2005.
2) HCCL/URI-II/024 dated 15.11.2005
3) HCCL/URI-II/062 dated 30.12.2005

Dear Sir,

As informed through our previous letters no. HCCL/URI-II/024 dated 15.11.2005 & HCCL/URI-
II/062 dated 30.12.2005, there exists discrepancy among the various survey control points of the
project established by NHPC.

However, you have instructed us that “…. the value of these control points can be utilized for
start of work of structures in the near vicinity of these points.” However, you have also informed
us that “….. before start of tunnel excavation the Survey of India is being requested to check all
the Control Points to see if there is any error”, and that “ ….. we will re-establish the controls
during the course of time.” (vide your letters no. NH/URI-II/HQ/2005/769 dated 19.11.2005 &
NH/URI-II/HQ/2005/1051 dated 17.01.2006)

Now portal excavation of all the tunnels are completed and face blast will be taken shortly (in
fact, face blast for Adit-2 was taken on 22nd Feb-06).

Hence you are requested to kindly issue the correct coordinates and elevations of all the Control
Points without any discrepancy among them, pursuant to sub-clause A4.1 (1) of TS and sub-
clause 17.1 of the Conditions of Contract.

The Engineer-in-charge’s early action in this regard shall be highly appreciated.


Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
PROJECT MANAGER

Encl : As Stated.
D:\Uri2 HEP\Contract\Survey\page-7
Ref. No. HCCL/URI-II/0108 Date: 11-Mar-06.

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.
Sub: Survey Control Points.
Your letter no. : 1) NH/URI-II/HQ/2005/769 dated 19.11.2005
2) NH/URI-II/HQ/2005/1051 dated 17.01.2006
3) NH/URI-II/HQ/2006/1310 dated 09.03.2006
Our letter no. : 1) HCCL/URI-II/006 dated 22.09.2005.
2) HCCL/URI-II/024 dated 15.11.2005
3) HCCL/URI-II/062 dated 30.12.2005
4) HCCL/URI-II/0102 dated 03.03.2006

Dear Sir,

This has reference to your letter no. NH/URI-II/HQ/2006/1310 dated 09.03.2006, regarding the
subject matter.

We have checked the survey control points mentioned in the above letter and found that there is a
discrepancy of 1.306m (Easting) and 0.853m (Northing) at U17 when checked with respect to
U12 and S19.

This is for your information and necessary further instructions please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
PROJECT MANAGER
D:\Uri2 HEP\Contract\Survey\page-9
Ref. No. HCCL/URI-II/0175 Date: 21-may-06.
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II:Lot-1) – Uri-II H.E Project (4x60 MW)
LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.
Sub: Change in Alignment of Adit-1 due to adjustments in Survey Control
Points.

Dear Sir,

Please find enclosed herewith our proposal for change in alignment of Adit-1 required due to
adjustments in Survey Control Points

You may please approve the same.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
PROJECT MANAGER

D:\Uri2 HEP\Contract\Survey\page-10

Ref. No. HCCL/URI-II/0176 Date: 21 may-06.


To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II:Lot-1) – Uri-II H.E Project (4x60 MW)
LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.
Sub: Method of Surveying for Tunneling works.

Dear Sir,

Please find enclosed herewith our method of surveying for tunneling works.

You may please approve the same.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
PROJECT MANAGER

D:\Uri2 HEP\Contract\Survey\page-11
Ref. No. HCCL/URI-II/0178 Date: 22-may-06.

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref. : Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II:Lot-1) – Uri-II H.E Project (4x60 MW)
LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.
Sub : Change in Alignment of Adit-1 due to adjustments in Survey Control
Points.

Dear Sir,

Please find enclosed herewith calibration certificate of Survey instruments as on 19-05-2006.


This is for your information and needful please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
PROJECT MANAGER

D:\Uri2 HEP\Contract\Survey\page-10

Ref. No. HCCL/URI-II/0180 Date: 25-may-06.

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref. : Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II:Lot-1) – Uri-II H.E Project (4x60 MW)
LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.
1. Our letter No. HCCL/URI-II/0175

Sub: Change in Alignment of Adit-1 due to adjustments in Survey Control


Points.

Dear Sir,

Please find enclosed herewith our revised proposal for change in alignment of Adit-1 required
due to adjustments in Survey Control Points.
This proposal has been surveyed, calculated and discussed jointly by HCC an NHPC surveyors.
You may please approve the same.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
PROJECT MANAGER

D:\Uri2 HEP\Contract\Survey\page-12

Ref. No. HCCL/URI-II/0181 Date: 26-may-06.

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref. : Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II:Lot-1) – Uri-II H.E Project (4x60 MW)
LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub: Discrepancy in Survey Control Points.

Dear Sir,

This has reference to your letter no - NH/Uri-II/ HQ/2006/1661 dated 26-04-2006. We have
checked the coordinates of Survey control points U17 & U16, given in that letter & found the
following difference.
1. Distance between U17 & U16 as per calculation 518.584.mtr (U17 : N-117435.647, E -
75993.733) & (U16 ; N- 117941.367, E-75878.942)
2. Distance between U16 & U17 as per field measurement 518.924 mtr, with total station
Pentex R 322 NX. So, the difference is 340 mm.

This field measurement was taken jointly with your surveyor (Mr. Satish)

This is for your information and further instruction please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
PROJECT MANAGER

D:\Uri2 HEP\Contract\Survey\page-14

Ref. No. HCCL/URI-II/0182 Date: 26-may-06.

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref. : Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II:Lot-1) – Uri-II H.E Project (4x60 MW)
LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.
Sub : Change in Alignment of Adit-4 due to poor geological condition at the
existing location of portal.

Dear Sir,

Please find enclosed herewith our proposal for change in alignment of Adit-4 required due to
poor geological condition at the existing location of portal

You may please approve the same.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
PROJECT MANAGER

D:\Uri2 HEP\Contract\Survey\page-15

Ref. No. HCCL/URI-II/0194 Date: 6-June-06.

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref. : Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II:Lot-1) – Uri-II H.E Project (4x60 MW)
LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.
Sub : Change in Alignment of Adit-2 and Adit-4 due to poor geological condition
at the existing location of portal.

Dear Sir,

Please find enclosed herewith our proposal for change in alignment of Adit-2 and Adit-4 required
due to poor geological condition at the existing location of portal

You may please approve the same.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
PROJECT MANAGER

D:\Uri2 HEP\Contract\Survey\page-16

Ref. No. HCCL/URI-II/0198 Date: 9th June’ 06.

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Ref. : Construction of Diversion Tunnel including Gates, Concrete Gravity
Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II:Lot-1) – Uri-II H.E Project (4x60 MW)
LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Your letter no. : NH/Uri-II/ HQ/2006/1661 dated 27-04-2006.

Sub: Discrepancy in Survey Control Points.

Dear Sir,

With reference to the above, HCC has carried out joint checking of the Survey Control Points
provided by NHPC for necessary verification.

During joint checking it has been observed that there is discrepancy in the Survey Data as
detailed in Annexure No 1.

This is for your kind information and further instruction in this regard.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
PROJECT MANAGER

D:\Uri2 HEP\Contract\Survey\page-17

Ref. No. HCCL/URI-II/0250 Date: 27-July- 06.

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref. : Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II:Lot-1) – Uri-II H.E Project (4x60 MW)
LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub: Revised alignment of Adit-1, Adit-2 and Adit-4.

Your letter no. : 1) HCCL/URI-II/0175 dated 21-May-06.


2) HCCL/URI-II/0194 dated 06-July-06.

Dear Sir,

This is further to our above mentioned letters regarding change of alignment of Adit-1, Adit-2 and
Adit-4.

As per subsequent instruction by you, the approved revised alignment, which is being followed
for construction, is enclosed with this letter.

This is for your information and record please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
PROJECT MANAGER

Encl. : As stated.

D:\Uri2 HEP\Contract\Survey\page-18

Ref. No. HCCL/URI-II/0297 Date: 24-Aug- 06.

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref. : Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II:Lot-1) – Uri-II H.E Project (4x60 MW)
LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of control pillar and tunnel alignment for
Adit-1, Adit-2, Adit-3 & Adit-4, checked by representative of NHPC and HCC.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
PROJECT MANAGER

Encl. : As stated.

D:\Uri2 HEP\Contract\Survey\page-19

Ref. No. HCCL/URI-II/0368 Date: 09-Oct- 06.

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II:Lot-1) – Uri-II H.E Project (4x60 MW)
LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of tunnel alignment for HRT through Adit-1
down stream and up stream, checked by representative of NHPC and HCC.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
PROJECT MANAGER

Encl. : As stated.

D:\Uri2 HEP\Contract\Survey\page-20

Ref. No. HCCL/URI-II/0397 Date: 11-Nov-06.

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of tunnel alignment for Adit-4 and Adit-2,
checked by representative of NHPC and HCC.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
PROJECT MANAGER

Encl. : As stated.

D:\Uri2 HEP\Contract\Survey\page-21

Ref. No. HCCL/URI-II/0426 Date: 24-Nov-06.

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II:Lot-1) – Uri-II H.E Project (4x60 MW)
LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of tunnel alignment for HRT through Adit-1
down stream and up stream, Adit-2, Adit-4 and MAT checked by the representative of NHPC and
HCC.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
PROJECT MANAGER

Encl. : As stated.

D:\Uri2 HEP\Contract\Survey\page-22

Ref. No. HCCL/URI-II/0429 Date: 28-Nov-06.

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of tunnel alignment for HRT through Adit-1,
Adit-2, HRT through Adit-3 up stream, Adit-4 and MAT checked by the representative of NHPC
and HCC.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
PROJECT MANAGER

Encl. : As stated.

D:\Uri2 HEP\Contract\Survey\page-23

Ref. No. HCCL/URI-II/0434 Date: 02-Nov-06.

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of tunnel alignment for Adit-4, Downstream
Surge Gallery and MAT, checked by the representative of NHPC and HCC.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
PROJECT MANAGER

Encl. : As stated.

D:\Uri2 HEP\Contract\Survey\page-24

Ref. No. HCCL/URI-II/0440 Date: 06-Dec-06

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub: Survey Instrument (PENTAX) calibration report.

Dear Sir,

Please find enclosed herewith the calibration report of Total Station (Make: PENTAX, Model No.:
R-322 NX, Sr. No.: 860532). The instrument was tested by Lawrence & Mayo (India) Private Ltd.
and the results are found satisfactorily conforms to IS: 2978 – 1964.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
PROJECT MANAGER

Encl.: As stated.

D:\Uri2 HEP\Contract\Survey\page-25

Ref. No. HCCL/URI-II/0441 Date: 06-Nov-06.

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of tunnel alignment for HRT through Adit-3
downstream, checked by the representative of NHPC and HCC.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
PROJECT MANAGER

Encl. : As stated.

D:\Uri2 HEP\Contract\Survey\page-26

Ref. No. HCCL/URI-II/0448 Date: 11-Nov-06.

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of tunnel alignment for HRT through Adit-1
downstream, checked by the representative of NHPC and HCC.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
PROJECT MANAGER

Encl. : As stated.

D:\Uri2 HEP\Contract\Survey\page-27

Ref. No. HCCL/URI-II/0456 Date: 16-Nov-06.

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of tunnel alignment for Adit-4 TRT junction
and MAT, checked by the representative of NHPC and HCC.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
PROJECT MANAGER

Encl. : As stated.

D:\Uri2 HEP\Contract\Survey\page-28

Ref. No. HCCL/URI-II/0460 Date: 21-Nov-06.

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of tunnel alignment for HRT trough Adit-3
upstream and Adit to Pressure Shaft top , checked by the representative of NHPC and HCC.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
PROJECT MANAGER

Encl. : As stated.

D:\Uri2 HEP\Contract\Survey/page-29

Ref. No. HCCL/URI-II/0465 Date: 28-Dec-06.

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of tunnel alignment for HRT trough Adit-1
downstream and Downstream Surge Gallery, checked by the representative of NHPC and HCC.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

S. R. DUTTA
DY. PROJECT CONTROLLER

Encl. : As stated.

D:\Uri2 HEP\Contract\Survey/page-30

Ref. No. HCCL/URI-II/0478 Date: 10-Dec-06.

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Discrepancies in Survey Control Points.

Dear Sir,

This has reference to your letter no NH/URI-II/HQ/2006/1661 dated 26 th April’ 06 vide which you
provided us the co-ordinates of different survey Control Points.

Subsequently joint survey was done by surveyors of NHPC and HCC with the help of NHPC
survey instrument LEICA 1800; the report for the same was submitted to you vide letter no
HCCL/URI-II/0199 dated 9th June’ 06. The survey revealed the following discrepancies

1) Error of 0.476 m in Easting and -0.652 m in Northing at point U-16 in reference to the co-
ordinates provided by NHPC i.e. Easting 75878.942 m Northing 117941.367 m.

2) Error of 0.712 m in Easting and -1.297 m in Northing at point U-17 in reference to the co-
ordinates provided by NHPC i.e. Easting 75993.733 m Northing 117435.647 m.

Presently traversing was once again conducted by surveyors of HCC with the help of HCC
survey instrument PENTAX R-32 NX and following discrepancies have been found.

1) Error of 0.559 m in Easting and -0.762 m in Northing at point U-16 in reference to the co-
ordinates provided by NHPC i.e. Easting 75878.942 m Northing 117941.367 m.

2) Error of 0.850 m in Easting and -1.377 m in Northing at point U-17 in reference to the co-
ordinates provided by NHPC i.e. Easting 75993.733 m Northing 117435.647 m.

The detail reports for the traversing along with the calibration report of the survey equipment are
attached herewith for your reference and record.

You are requested to issue necessary decision / instruction for suitable adjustment of the survey
Control Point co-ordinates (so as to minimize the survey discrepancies) prior to start of HRT
lining work which is expected on 1st week of March’ 07.

This is for your information and early action please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

A.I.BENNY
PROJECT MANAGER

Encl. : As stated.

D:\Uri2 HEP\Contract\Survey/page-31

Ref. No. HCCL/URI-II/0482 Date: 15-Jan-07

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report.


Dear Sir,

Please find enclosed herewith the joint survey record of tunnel alignment for MAT, Down Stream
Surge Galley, HRT through Adit-3 upstream and Adit to Top of Pressure Shaft, checked by the
representative of NHPC and HCC.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

A.I.BENNY
PROJECT MANAGER

Encl. : As stated.

D:\Uri2 HEP\Contract\Survey/page-33

Ref. No. HCCL/URI-II/0499 Date: 31-Jan-07

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report.


Dear Sir,

Please find enclosed herewith the joint survey record of tunnel alignment for HRT through Adit-2
upstream and downstream, Adit to Pressure Shaft Top, HRT through Adit-3 upstream, TRT
through Adit-4 upstream, TRT through Adit-4, HRT through Adit-1 downstream and MAT,
checked by the representative of NHPC and HCC.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl. : As stated.

D:\Uri2 HEP\Contract\Survey/page-34

Ref. No. HCCL/URI-II/0535 Date: 28-Feb-07

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Deployment of Survey Personnel and Survey Equipment.

Your letter no. NH/URI-II/D&PH/HCC/2007/1841 dated 02-Feb-07


Dear Sir,

This has reference to your above referred letter regarding shortage of Survey Personnel and
Survey Equipments.

In this regard we would like to submit as below.

1) Requirement of Survey Personnel has been sent to our Head Office and 1 Survey
Manager and 4 Surveyors will be deployed soon.

2) Requirement of following Survey Equipments has already been processed and the same
will be available at site shortly.

a. Total Station – PENTAX 1 no.


b. Tunnel Laser Beam (Trumble MK76) 8 nos.
c. Sticker Prism (Sokia / Pentax) 50X50 mm 50 nos.

This is for your information please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

D:\Uri2 HEP\Contract\Survey/page-35
Ref. No. HCCL/URI-II/0570 Date: 27-Mar-07

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report.

Dear Sir,
Please find enclosed herewith the joint survey record of tunnel alignment for HRT through Adit-1
downstream, and HRT through Adit-2 downstream, checked by the representative of NHPC and
HCC.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl. : As stated.

D:\Uri2 HEP\Contract\Survey/page-36

Ref. No. HCCL/URI-II/0614 Date: 24-Apr-07

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub: Survey Instrument (PENTAX) calibration report.

Dear Sir,
Please find enclosed herewith the calibration report of Total Station (Make: PENTAX, Model No.:
R-322 NX, Sr. No.: 866117), tested by Lawrence & Mayo (India) Private Ltd.

This is for your information and needful please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl.: As stated.

D:\Uri2 HEP\Contract\Survey\page-37

Ref. No. HCCL/URI-II/0617 Date: 27-Apr-07

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report.

Dear Sir,
Please find enclosed herewith the joint survey record of tunnel alignment for HRT through Adit-3
upstream, Branch Tunnel, Adit to DTGH and TRT through Adit-4 downstream, checked by the
representative of NHPC and HCC.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl. : As stated.

D:\Uri2 HEP\Contract\Survey/page-38

Ref. No. HCCL/URI-II/0691 Date: 09-Jul-07

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report.

Dear Sir,
Please find enclosed herewith the joint survey record of alignment for Power House Heading,
Draft Tube Gate Hall, TRT Downstream of Adit-4, TRT Upstream of Adit-4 and Downstream
Surge Gallery, checked by the representative of NHPC and HCC.

This is for your needful please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl. : As stated.

D:\Uri2 HEP\Contract\Survey/page-39

Ref. No. HCCL/URI-II/0692 Date: 09-Jul-07

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub: Survey Instrument (PENTAX) calibration report.

Dear Sir,
Please find enclosed herewith the calibration report of Total Station (Make: PENTAX, Model No.:
ATS 102, Sr. No.: 519484), tested by Lawrence & Mayo (India) Private Ltd.

This is for your information and needful please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl.: As stated.

D:\Uri2 HEP\Contract\Survey\page-40

Ref. No. HCCL/URI-II/0706 Date: 19-Jul-07

To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.
Sub.: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for HRT Downstream of Adit-
2, checked by the representative of NHPC and HCC.
This is for your needful please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl. : As stated.

D:\Uri2 HEP\Contract\Survey/page-41

Ref. No. HCCL/URI-II/0761 Date: 07-Sep-07

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for Power House, Transformer
Cavern, Downstream Surge Gallery & TRT downstream & manifold upstream, HRT upstream of
Adit-3, TRT upstream of Adit-4, TRT downstream of Adit-4, checked by the representative of
NHPC and HCC.

This is for needful please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl. : As stated.

D:\Uri2 HEP\Contract\Survey/page-42

Ref. No. HCCL/URI-II/0791 Date: 06-Oct-07

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for -

 TRT through DSSG


 Draft Tube Manifold
 HRT through Adit-3 U/S
 TRT through Adit-4 D/S
 TRT through Adit-4 U/S
 HRT through Adit-2 D/S

Which is jointly checked by the representative of NHPC and HCC.

This is for needful please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl. : As stated.

D:\Uri2 HEP\Contract\Survey/page-43

Ref. No. HCCL/URI-II/0852 Date: 14-Nov-07

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for -

o Manifold Unit 1
o HRT Downstream of Adit-2
o TRT Downstream from Power House Complex
o HRT Upstream of Adit-3
o TRT Downstream of Adit-4
o MAT

jointly checked by the representative of NHPC and HCC.

This is for needful please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl. : As stated.

D:\Uri2 HEP\Contract\Survey/page-44

Ref. No. HCCL/URI-II/0892 Date: 17-Dec-07

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for -

o Manifold Unit 2
o HRT Downstream of Adit-2
o HRT Upstream of Adit-3

jointly checked by the representative of NHPC and HCC.

This is for needful please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl. : As stated

D:\Uri2 HEP\Contract\Survey/page-45

Ref. No. HCCL/URI-II/0901 Date: 29-Dec-07

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for -

o TRT Downstream of DSSG


o TRT Upstream of Adit-4
o HRT Upstream of Adit-3

jointly checked by the representative of NHPC and HCC.

This is for needful please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl. : As stated

D:\Uri2 HEP\Contract\Survey/page-46

Ref. No. HCCL/URI-II/0907 Date: 03-Jan-08

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for -

o HRT Downstream of Adit-2


o HRT Upstream of Adit-3
o Manifold Unit - 1

jointly checked by the representative of NHPC and HCC.

This is for needful please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl. : As stated

D:\Uri2 HEP\Contract\Survey/page-47

Ref. No. HCCL/URI-II/0976 Date: 21-Feb-08

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for -

o TRT Upstream of Adit-4


o HRT Downstream of Adit-2
o Manifold Unit – 2
o Manifold Unit – 4
o TRT through DSSG

jointly checked by the representative of NHPC and HCC.

This is for needful please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl. : As stated

D:\Uri2 HEP\Contract\Survey/page-48

Ref. No. HCCL/URI-II/01010 Date: 26-Mar-08

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for -

o TRT through D/S Surge Gallery


o Bus Duct U-1
o HRT Downstream of Adit-2

jointly checked by the representative of NHPC and HCC.

This is for needful please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl. : As stated

D:\Uri2 HEP\Contract\Survey/page-49

Ref. No. HCCL/URI-II/01062 Date: 05-May-08

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for -

o Adit to MIV Gallery


o TRT through D/S Surge Gallery
o TRT manifold (unit -4)

jointly checked by the representative of NHPC and HCC.

This is for needful please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl. : As stated

D:\Uri2 HEP\Contract\Survey\Page-50

Ref. No. HCCL/URI-II/01064 Date: 06-May-08

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for –

o Adit to bottom of Pressure Shaft


o TRT manifold (unit -4)
jointly checked by the representative of NHPC and HCC.

This is for needful please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl. : As stated

D:\Uri2 HEP\Contract\Survey\Page-51

Ref.No. HCCL/URI-II/1135 Date: 01-Jul-08

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for –

o TRT D/S through Downstream Surge Gallery


o Draft Tube manifold (unit -4)
jointly checked by the representative of NHPC and HCC.

This is for needful please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl.: As stated

D:\Uri2 HEP\Contract\Survey\Page-52

Ref. No. HCCL/URI-II/1173 Date: 08-Aug-08

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for –

o Power House Bus Duct (unit -1)


o Power House Penstock (unit -3)
o Power House Penstock (unit -4)
o Draft Tube manifold (unit -3)

jointly checked by the representative of NHPC and HCC.

This is for needful please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl.: As stated

D:\Uri2 HEP\Contract\Survey\Page-53

Ref. No. HCCL/URI-II/1191 Date: 25-Aug-08

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for the Tail Race Tunnel -
Downstream Surge Gallery jointly checked by the representative of NHPC and HCC.

This is for needful please.


Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl.: As stated

D:\Uri2 HEP\Contract\Survey\Page-54

Ref. No. HCCL/URI-II/1221 Date: 27-Sep-08

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for –

o TRT thru’ Downstream Surge Gallery


o Adit to MIV Gallery
o Adit to Pressure Shaft Bottom
jointly checked by the representative of NHPC and HCC.

This is for needful please.


.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl.: As stated

D:\Uri2 HEP\Contract\Survey\Page-55

Ref. No. HCCL/URI-II/1240 Date: 16-Oct-08

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for Tail Race Tunnel through
Adit-4 U/s jointly checked by the representative of NHPC and HCC.

This is for needful please.


.
Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl.: As stated

D:\Uri2 HEP\Contract\Survey\Page-56

Ref. No. HCCL/URI-II/1241 Date: 16-Oct-08

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Traverse Survey Report for TRT – Submission of - Reg.

Dear Sir,

Please find enclosed herewith the Traverse Survey Report for Tail race tunnel, from TRT through
Downstream surge gallery to Adit-4 Portal, jointly signed by the representative of NHPC and
HCC.

This is for needful please.


Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl.: As stated

D:\Uri2 HEP\Contract\Survey\Page-57

Ref. No. HCCL/URI-II/1256 Date: 27-Oct-08

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report.

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for Power House Bus Duct no
- IV jointly checked by the representative of NHPC and HCC.

This is for needful please.


.

Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl.: As stated

D:\Uri2 HEP\Contract\Survey\Page-58

Ref. No. HCCL/URI-II/1258 Date: 03-Nov-08

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Open Traverse Survey for TRT Breakthrough – Submn. of - Reg.

Ref.: Our Letter no. HCCL/URI-II/1241 dated 16-Oct’08.

Dear Sir,

In continuation to the letter referred above please find enclosed herewith the Open traverse
survey drawing for the Tail race tunnel break through Downstream surge gallery to the TRT
through Adit-4 u/s.

This is for your information please.


Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl.: As stated

D:\Uri2 HEP\Contract\Survey\Page-59

Ref.No. HCCL/URI-II/1271 Date: 19-Nov-08

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for –

o Lower Horizontal Penstock No-1.

Jointly checked by the representative of NHPC and HCC.

This is for needful please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-60

Ref No: HCCL/URI-II/1274 Date: 21-Nov-08

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment report

Dear Sir,

Please find enclosed herewith the Survey Report where in the coordinates from PC8 to HR1 are
shown as per Old Alignment (i.e. as per Construction Drawing) and New Alignment (i.e. as per
Present Site condition).

This is for your information and needful please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-61

Ref No: HCCL/URI-II/1314 Date: 23-Dec-08

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for –

o Draft Tube Gate Shaft - No III


o Lower Horizontal Penstock – No I

jointly checked by the representative of NHPC and HCC.

This is for needful please.


Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-62

Ref No: HCCL/URI-II/1349 Date: 15-Jan-09

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report for TRT after Breakthrough – Submn. of -
Reg.

Dear Sir,

Please find enclosed herewith the Tunnel alignment checking report for the Tail race tunnel
between Down stream surge gallery and Adit-4 U/s after the breakthrough of TRT.

This is for your information please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER

Encl.: As stated

D:\Uri2 HEP\Contract\Survey\Page-63

Ref No: HCCL/URI-II/1375 Date: 31-Jan-09

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report - Reg

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for –

o Draft Tube Gate Shaft - No III


o Downstream Surge Gallery – Branch Tunnel
o Tail Race Tunnel thru’ DSSG

jointly checked by the representative of NHPC and HCC.

This is for needful please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-64

Ref No: HCCL/URI-II/1395 Date: 20-Feb-09

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report – Reg.

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for the Cable Cum Ventilation
Tunnel jointly checked by the representative of NHPC and HCC.

This is for needful please.

Thanking you,

Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER

Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-65

Ref No: HCCL/URI-II/1416 Date: 5-Mar-09

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report – Reg.

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for –

o Draft Tube Gate Shaft - No IV


o Downstream Surge Gallery – Branch Tunnel
Jointly checked by the representative of NHPC and HCC.

This is for needful please.

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER
Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-66

Ref No: HCCL/URI-II/1488 Date: 20-Apr-09

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report – Reg.

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for Downstream Surge
Gallery – Branch Tunnel Jointly checked by the representative of NHPC and HCC.

This is for needful please.

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-67
Ref No: HCCL/URI-II/1539 Date: 15-May-09

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report – Reg.

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for Power House complex –
Escape Gallery Jointly checked by the representative of NHPC and HCC.

This is for needful please.

Yours faithfully,
for Hindustan Construction Co. Ltd.

BENNY A I
PROJECT MANAGER

Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-68
Ref No: HCCL/URI-II/1660 Date: 03-Aug-09

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report – Reg.

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for

o Cable cum Ventilation Tunnel along with Longitudinal Section


o Draft Tube Gate Shaft no - I

Jointly checked by the representative of NHPC and HCC.

This is for needful please.

Yours faithfully,
for Hindustan Construction Co. Ltd.

BANSAL D K
PROJECT MANAGER
Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-69

Ref No: HCCL/URI-II/1730 Date: 12-Sep-09

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Tunnel alignment checking report – Reg.

Dear Sir,

Please find enclosed herewith the joint survey record of alignment for Power House complex –
Escape Gallery Jointly checked by the representative of NHPC and HCC.

This is for needful please.

Yours faithfully,
for Hindustan Construction Co. Ltd.

BANSAL D K
PROJECT MANAGER

Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-70
Ref No: HCCL/URI-II/1764 Date: 07-Oct-09

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Issue of Survey Instrument – Total station on returnable basis – regarding

Dear Sir,

The survey instrument (Total Station) used in the dam site survey works has gone out of order. In
order to carryout the survey works at dam site it is requested to kindly issue your Total station
(model TC 1105) for the period till our instrument is made ready.

This is for needful please.

Yours faithfully,
for Hindustan Construction Co. Ltd.
R Rajendra Kumar
Project Manager

D:\Uri2 HEP\Contract\Survey\Page-70

Ref No: HCCL/URI-II/1774 Date: 16-Oct-09

To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.

Ref.: Construction of Diversion Tunnel including Gates, Concrete Gravity


Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II: Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.

Sub.: Missing of Total station (TC-1105) – Regarding


Ref.: Our letter no: HCCL/URI-II/1764 dated 07-10-09

Dear Sir,

This is to inform you that the Survey Instrument (Total station – TC-1105) borrowed for survey
works from NHPC, Uri-II is missing from16th Oct’09. We have filed FIR in the police station; copy
of the same is enclosed herewith for reference.

This is for information please.

Yours faithfully,
for Hindustan Construction Co. Ltd.
R Rajendra Kumar
Project Manager

Encl.: As stated