Survey Control Points Discrepancy Report
Survey Control Points Discrepancy Report
Camp at Salamabad
To,
The Chief Engineer,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
P.O – Uri, Dist. – Baramulla, J&K.
Dear Sir,
We request you to kindly issue the following Survey Equipments on Returnable basis.
Thanking you,
Yours faithfully,
For Hindustan Construction Co. Ltd.
S. R. DUTTA
GENERAL MANAGER
D:\Uri2 HEP\Contract\Survey\page-1
Ref. No. HCCL/URI-II/006 Date: 22nd September 2005.
Camp at Salamabad
To,
The Chief Engineer,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
P.O – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Pursuant to the captioned subject, we request you to kindly furnish the documents / data relating
to Survey Control Points for necessary verification and confirmation as per TS A4.1(1).
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
S. R. DUTTA
GENERAL MANAGER
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
With reference to the above, HCC has carried out joint checking of the Survey Control Points
provided by NHPC for necessary verification.
During joint checking it has been observed that there is discrepancy in the Survey Data provided
by NHPC as detailed below:
Survey Coordinates and Elevation provided Actual coordinates and elevations Remarks
Control by NHPC observed at site during joint
Point checking with NHPC surveyor
East North Elevation East North Elevation
A. Dam Complex
S-19 83706.790 116788.050 1269.967 83706.628 116788.062 1269.948 (a) with
TC1800
(NHPC)
Survey Coordinates and Elevation provided Actual coordinates and elevations Remarks
Control by NHPC observed at site during joint
Point checking with NHPC surveyor
East North Elevation East North Elevation
B. Underground Complex
U – 13 82229.500 117890.120 1255.099 82227.708 117889.067 1255.010 with
TC407
S – 25 82135.430 117905.440 1259.007 82133.601 117904.288 1258.951 - do -
S – 26 81885.840 117937.180 1247.392 81883.898 117935.830 - - do -
As observed from the above chart there is a difference of (with respect to the initial survey
control point U-12),
(1) about 200mm in the other survey control points at Dam Complex, and
(2) about 2000mm in the other survey control points at Underground Complex.
Pursuant to sub-clause A.4.1(2), we would like to draw the Engineer-in-charge’s kind attention to
the above mentioned discrepancy and would request him to kindly advice in this regard.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
S. R. DUTTA
PROJECT MANAGER
S. R. DUTTA
PROJECT MANAGER
Encl : As Stated.
D:\Uri2 HEP\Contract\Survey\page-5
Ref. No. HCCL/URI-II/093 Date: 16-Feb-06.
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Ref. : Construction of Diversion Tunnel including Gates, Concrete Gravity
Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II:Lot-1) – Uri-II H.E Project (4x60
MW) LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.
Sub : Request for Issue of Survey Equipments on Returnable basis.
Dear Sir,
We request you to kindly issue the following Survey Equipments on Returnable basis.
S. R. DUTTA
PROJECT MANAGER
D:\Uri2 HEP\Contract\Survey\page-6
Ref. No. HCCL/URI-II/0102 Date: 03-Mar-06.
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
As informed through our previous letters no. HCCL/URI-II/024 dated 15.11.2005 & HCCL/URI-
II/062 dated 30.12.2005, there exists discrepancy among the various survey control points of the
project established by NHPC.
However, you have instructed us that “…. the value of these control points can be utilized for
start of work of structures in the near vicinity of these points.” However, you have also informed
us that “….. before start of tunnel excavation the Survey of India is being requested to check all
the Control Points to see if there is any error”, and that “ ….. we will re-establish the controls
during the course of time.” (vide your letters no. NH/URI-II/HQ/2005/769 dated 19.11.2005 &
NH/URI-II/HQ/2005/1051 dated 17.01.2006)
Now portal excavation of all the tunnels are completed and face blast will be taken shortly (in
fact, face blast for Adit-2 was taken on 22nd Feb-06).
Hence you are requested to kindly issue the correct coordinates and elevations of all the Control
Points without any discrepancy among them, pursuant to sub-clause A4.1 (1) of TS and sub-
clause 17.1 of the Conditions of Contract.
Yours faithfully,
for Hindustan Construction Co. Ltd.
S. R. DUTTA
PROJECT MANAGER
Encl : As Stated.
D:\Uri2 HEP\Contract\Survey\page-7
Ref. No. HCCL/URI-II/0108 Date: 11-Mar-06.
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
This has reference to your letter no. NH/URI-II/HQ/2006/1310 dated 09.03.2006, regarding the
subject matter.
We have checked the survey control points mentioned in the above letter and found that there is a
discrepancy of 1.306m (Easting) and 0.853m (Northing) at U17 when checked with respect to
U12 and S19.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
S. R. DUTTA
PROJECT MANAGER
D:\Uri2 HEP\Contract\Survey\page-9
Ref. No. HCCL/URI-II/0175 Date: 21-may-06.
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith our proposal for change in alignment of Adit-1 required due to
adjustments in Survey Control Points
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
S. R. DUTTA
PROJECT MANAGER
D:\Uri2 HEP\Contract\Survey\page-10
Dear Sir,
Please find enclosed herewith our method of surveying for tunneling works.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
S. R. DUTTA
PROJECT MANAGER
D:\Uri2 HEP\Contract\Survey\page-11
Ref. No. HCCL/URI-II/0178 Date: 22-may-06.
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
S. R. DUTTA
PROJECT MANAGER
D:\Uri2 HEP\Contract\Survey\page-10
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith our revised proposal for change in alignment of Adit-1 required
due to adjustments in Survey Control Points.
This proposal has been surveyed, calculated and discussed jointly by HCC an NHPC surveyors.
You may please approve the same.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
S. R. DUTTA
PROJECT MANAGER
D:\Uri2 HEP\Contract\Survey\page-12
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
This has reference to your letter no - NH/Uri-II/ HQ/2006/1661 dated 26-04-2006. We have
checked the coordinates of Survey control points U17 & U16, given in that letter & found the
following difference.
1. Distance between U17 & U16 as per calculation 518.584.mtr (U17 : N-117435.647, E -
75993.733) & (U16 ; N- 117941.367, E-75878.942)
2. Distance between U16 & U17 as per field measurement 518.924 mtr, with total station
Pentex R 322 NX. So, the difference is 340 mm.
This field measurement was taken jointly with your surveyor (Mr. Satish)
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
S. R. DUTTA
PROJECT MANAGER
D:\Uri2 HEP\Contract\Survey\page-14
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith our proposal for change in alignment of Adit-4 required due to
poor geological condition at the existing location of portal
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
S. R. DUTTA
PROJECT MANAGER
D:\Uri2 HEP\Contract\Survey\page-15
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith our proposal for change in alignment of Adit-2 and Adit-4 required
due to poor geological condition at the existing location of portal
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
S. R. DUTTA
PROJECT MANAGER
D:\Uri2 HEP\Contract\Survey\page-16
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Ref. : Construction of Diversion Tunnel including Gates, Concrete Gravity
Dam, Head Race Tunnel, Surge Shaft, Pressure Shaft, Power House and Tail
Race Tunnel (Civil Works Package Uri-II:Lot-1) – Uri-II H.E Project (4x60 MW)
LOA No. NHPC/CCW/Uri-II/08/2843 dated 21.09.2005.
Dear Sir,
With reference to the above, HCC has carried out joint checking of the Survey Control Points
provided by NHPC for necessary verification.
During joint checking it has been observed that there is discrepancy in the Survey Data as
detailed in Annexure No 1.
This is for your kind information and further instruction in this regard.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
S. R. DUTTA
PROJECT MANAGER
D:\Uri2 HEP\Contract\Survey\page-17
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
This is further to our above mentioned letters regarding change of alignment of Adit-1, Adit-2 and
Adit-4.
As per subsequent instruction by you, the approved revised alignment, which is being followed
for construction, is enclosed with this letter.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
S. R. DUTTA
PROJECT MANAGER
Encl. : As stated.
D:\Uri2 HEP\Contract\Survey\page-18
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of control pillar and tunnel alignment for
Adit-1, Adit-2, Adit-3 & Adit-4, checked by representative of NHPC and HCC.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
S. R. DUTTA
PROJECT MANAGER
Encl. : As stated.
D:\Uri2 HEP\Contract\Survey\page-19
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of tunnel alignment for HRT through Adit-1
down stream and up stream, checked by representative of NHPC and HCC.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
S. R. DUTTA
PROJECT MANAGER
Encl. : As stated.
D:\Uri2 HEP\Contract\Survey\page-20
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of tunnel alignment for Adit-4 and Adit-2,
checked by representative of NHPC and HCC.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
S. R. DUTTA
PROJECT MANAGER
Encl. : As stated.
D:\Uri2 HEP\Contract\Survey\page-21
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of tunnel alignment for HRT through Adit-1
down stream and up stream, Adit-2, Adit-4 and MAT checked by the representative of NHPC and
HCC.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
S. R. DUTTA
PROJECT MANAGER
Encl. : As stated.
D:\Uri2 HEP\Contract\Survey\page-22
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of tunnel alignment for HRT through Adit-1,
Adit-2, HRT through Adit-3 up stream, Adit-4 and MAT checked by the representative of NHPC
and HCC.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
S. R. DUTTA
PROJECT MANAGER
Encl. : As stated.
D:\Uri2 HEP\Contract\Survey\page-23
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of tunnel alignment for Adit-4, Downstream
Surge Gallery and MAT, checked by the representative of NHPC and HCC.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
S. R. DUTTA
PROJECT MANAGER
Encl. : As stated.
D:\Uri2 HEP\Contract\Survey\page-24
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the calibration report of Total Station (Make: PENTAX, Model No.:
R-322 NX, Sr. No.: 860532). The instrument was tested by Lawrence & Mayo (India) Private Ltd.
and the results are found satisfactorily conforms to IS: 2978 – 1964.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
S. R. DUTTA
PROJECT MANAGER
Encl.: As stated.
D:\Uri2 HEP\Contract\Survey\page-25
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of tunnel alignment for HRT through Adit-3
downstream, checked by the representative of NHPC and HCC.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
S. R. DUTTA
PROJECT MANAGER
Encl. : As stated.
D:\Uri2 HEP\Contract\Survey\page-26
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of tunnel alignment for HRT through Adit-1
downstream, checked by the representative of NHPC and HCC.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
S. R. DUTTA
PROJECT MANAGER
Encl. : As stated.
D:\Uri2 HEP\Contract\Survey\page-27
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of tunnel alignment for Adit-4 TRT junction
and MAT, checked by the representative of NHPC and HCC.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
S. R. DUTTA
PROJECT MANAGER
Encl. : As stated.
D:\Uri2 HEP\Contract\Survey\page-28
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of tunnel alignment for HRT trough Adit-3
upstream and Adit to Pressure Shaft top , checked by the representative of NHPC and HCC.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
S. R. DUTTA
PROJECT MANAGER
Encl. : As stated.
D:\Uri2 HEP\Contract\Survey/page-29
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of tunnel alignment for HRT trough Adit-1
downstream and Downstream Surge Gallery, checked by the representative of NHPC and HCC.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
S. R. DUTTA
DY. PROJECT CONTROLLER
Encl. : As stated.
D:\Uri2 HEP\Contract\Survey/page-30
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
This has reference to your letter no NH/URI-II/HQ/2006/1661 dated 26 th April’ 06 vide which you
provided us the co-ordinates of different survey Control Points.
Subsequently joint survey was done by surveyors of NHPC and HCC with the help of NHPC
survey instrument LEICA 1800; the report for the same was submitted to you vide letter no
HCCL/URI-II/0199 dated 9th June’ 06. The survey revealed the following discrepancies
1) Error of 0.476 m in Easting and -0.652 m in Northing at point U-16 in reference to the co-
ordinates provided by NHPC i.e. Easting 75878.942 m Northing 117941.367 m.
2) Error of 0.712 m in Easting and -1.297 m in Northing at point U-17 in reference to the co-
ordinates provided by NHPC i.e. Easting 75993.733 m Northing 117435.647 m.
Presently traversing was once again conducted by surveyors of HCC with the help of HCC
survey instrument PENTAX R-32 NX and following discrepancies have been found.
1) Error of 0.559 m in Easting and -0.762 m in Northing at point U-16 in reference to the co-
ordinates provided by NHPC i.e. Easting 75878.942 m Northing 117941.367 m.
2) Error of 0.850 m in Easting and -1.377 m in Northing at point U-17 in reference to the co-
ordinates provided by NHPC i.e. Easting 75993.733 m Northing 117435.647 m.
The detail reports for the traversing along with the calibration report of the survey equipment are
attached herewith for your reference and record.
You are requested to issue necessary decision / instruction for suitable adjustment of the survey
Control Point co-ordinates (so as to minimize the survey discrepancies) prior to start of HRT
lining work which is expected on 1st week of March’ 07.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
A.I.BENNY
PROJECT MANAGER
Encl. : As stated.
D:\Uri2 HEP\Contract\Survey/page-31
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Please find enclosed herewith the joint survey record of tunnel alignment for MAT, Down Stream
Surge Galley, HRT through Adit-3 upstream and Adit to Top of Pressure Shaft, checked by the
representative of NHPC and HCC.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
A.I.BENNY
PROJECT MANAGER
Encl. : As stated.
D:\Uri2 HEP\Contract\Survey/page-33
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Please find enclosed herewith the joint survey record of tunnel alignment for HRT through Adit-2
upstream and downstream, Adit to Pressure Shaft Top, HRT through Adit-3 upstream, TRT
through Adit-4 upstream, TRT through Adit-4, HRT through Adit-1 downstream and MAT,
checked by the representative of NHPC and HCC.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl. : As stated.
D:\Uri2 HEP\Contract\Survey/page-34
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
This has reference to your above referred letter regarding shortage of Survey Personnel and
Survey Equipments.
1) Requirement of Survey Personnel has been sent to our Head Office and 1 Survey
Manager and 4 Surveyors will be deployed soon.
2) Requirement of following Survey Equipments has already been processed and the same
will be available at site shortly.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
D:\Uri2 HEP\Contract\Survey/page-35
Ref. No. HCCL/URI-II/0570 Date: 27-Mar-07
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of tunnel alignment for HRT through Adit-1
downstream, and HRT through Adit-2 downstream, checked by the representative of NHPC and
HCC.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl. : As stated.
D:\Uri2 HEP\Contract\Survey/page-36
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the calibration report of Total Station (Make: PENTAX, Model No.:
R-322 NX, Sr. No.: 866117), tested by Lawrence & Mayo (India) Private Ltd.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl.: As stated.
D:\Uri2 HEP\Contract\Survey\page-37
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of tunnel alignment for HRT through Adit-3
upstream, Branch Tunnel, Adit to DTGH and TRT through Adit-4 downstream, checked by the
representative of NHPC and HCC.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl. : As stated.
D:\Uri2 HEP\Contract\Survey/page-38
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for Power House Heading,
Draft Tube Gate Hall, TRT Downstream of Adit-4, TRT Upstream of Adit-4 and Downstream
Surge Gallery, checked by the representative of NHPC and HCC.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl. : As stated.
D:\Uri2 HEP\Contract\Survey/page-39
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the calibration report of Total Station (Make: PENTAX, Model No.:
ATS 102, Sr. No.: 519484), tested by Lawrence & Mayo (India) Private Ltd.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl.: As stated.
D:\Uri2 HEP\Contract\Survey\page-40
To,
The Engineer-in-charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for HRT Downstream of Adit-
2, checked by the representative of NHPC and HCC.
This is for your needful please.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl. : As stated.
D:\Uri2 HEP\Contract\Survey/page-41
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for Power House, Transformer
Cavern, Downstream Surge Gallery & TRT downstream & manifold upstream, HRT upstream of
Adit-3, TRT upstream of Adit-4, TRT downstream of Adit-4, checked by the representative of
NHPC and HCC.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl. : As stated.
D:\Uri2 HEP\Contract\Survey/page-42
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for -
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl. : As stated.
D:\Uri2 HEP\Contract\Survey/page-43
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for -
o Manifold Unit 1
o HRT Downstream of Adit-2
o TRT Downstream from Power House Complex
o HRT Upstream of Adit-3
o TRT Downstream of Adit-4
o MAT
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl. : As stated.
D:\Uri2 HEP\Contract\Survey/page-44
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for -
o Manifold Unit 2
o HRT Downstream of Adit-2
o HRT Upstream of Adit-3
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl. : As stated
D:\Uri2 HEP\Contract\Survey/page-45
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for -
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl. : As stated
D:\Uri2 HEP\Contract\Survey/page-46
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for -
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl. : As stated
D:\Uri2 HEP\Contract\Survey/page-47
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for -
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl. : As stated
D:\Uri2 HEP\Contract\Survey/page-48
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for -
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl. : As stated
D:\Uri2 HEP\Contract\Survey/page-49
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for -
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl. : As stated
D:\Uri2 HEP\Contract\Survey\Page-50
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for –
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl. : As stated
D:\Uri2 HEP\Contract\Survey\Page-51
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for –
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-52
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for –
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-53
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for the Tail Race Tunnel -
Downstream Surge Gallery jointly checked by the representative of NHPC and HCC.
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-54
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for –
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-55
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for Tail Race Tunnel through
Adit-4 U/s jointly checked by the representative of NHPC and HCC.
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-56
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the Traverse Survey Report for Tail race tunnel, from TRT through
Downstream surge gallery to Adit-4 Portal, jointly signed by the representative of NHPC and
HCC.
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-57
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for Power House Bus Duct no
- IV jointly checked by the representative of NHPC and HCC.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-58
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
In continuation to the letter referred above please find enclosed herewith the Open traverse
survey drawing for the Tail race tunnel break through Downstream surge gallery to the TRT
through Adit-4 u/s.
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-59
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for –
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-60
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the Survey Report where in the coordinates from PC8 to HR1 are
shown as per Old Alignment (i.e. as per Construction Drawing) and New Alignment (i.e. as per
Present Site condition).
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-61
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for –
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-62
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd.,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Sub.: Tunnel alignment checking report for TRT after Breakthrough – Submn. of -
Reg.
Dear Sir,
Please find enclosed herewith the Tunnel alignment checking report for the Tail race tunnel
between Down stream surge gallery and Adit-4 U/s after the breakthrough of TRT.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-63
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for –
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-64
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for the Cable Cum Ventilation
Tunnel jointly checked by the representative of NHPC and HCC.
Thanking you,
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-65
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for –
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-66
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for Downstream Surge
Gallery – Branch Tunnel Jointly checked by the representative of NHPC and HCC.
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-67
Ref No: HCCL/URI-II/1539 Date: 15-May-09
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for Power House complex –
Escape Gallery Jointly checked by the representative of NHPC and HCC.
Yours faithfully,
for Hindustan Construction Co. Ltd.
BENNY A I
PROJECT MANAGER
Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-68
Ref No: HCCL/URI-II/1660 Date: 03-Aug-09
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for
Yours faithfully,
for Hindustan Construction Co. Ltd.
BANSAL D K
PROJECT MANAGER
Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-69
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
Please find enclosed herewith the joint survey record of alignment for Power House complex –
Escape Gallery Jointly checked by the representative of NHPC and HCC.
Yours faithfully,
for Hindustan Construction Co. Ltd.
BANSAL D K
PROJECT MANAGER
Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-70
Ref No: HCCL/URI-II/1764 Date: 07-Oct-09
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
The survey instrument (Total Station) used in the dam site survey works has gone out of order. In
order to carryout the survey works at dam site it is requested to kindly issue your Total station
(model TC 1105) for the period till our instrument is made ready.
Yours faithfully,
for Hindustan Construction Co. Ltd.
R Rajendra Kumar
Project Manager
D:\Uri2 HEP\Contract\Survey\Page-70
To,
The Engineer-in-Charge,
National Hydroelectric Power Corporation Ltd,
URI – II Hydro-Electric Project,
Rajarwani, P.O – Lagama,
Tehsil – Uri, Dist. – Baramulla, J&K.
Dear Sir,
This is to inform you that the Survey Instrument (Total station – TC-1105) borrowed for survey
works from NHPC, Uri-II is missing from16th Oct’09. We have filed FIR in the police station; copy
of the same is enclosed herewith for reference.
Yours faithfully,
for Hindustan Construction Co. Ltd.
R Rajendra Kumar
Project Manager
Encl.: As stated
D:\Uri2 HEP\Contract\Survey\Page-71