0% found this document useful (0 votes)
90 views1 page

Weld Repair Procedure for HR 3 Railings

This document provides a work procedure for welding repairs to railings for an external platform at the Horns Rev 3 wind farm project. It identifies the customer and author, and includes sections for the manufacturer, customer, and certifier to release the document. The procedure aims to ensure quality and safety standards are met for welding repairs on the railings.

Uploaded by

Mark Innes
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
90 views1 page

Weld Repair Procedure for HR 3 Railings

This document provides a work procedure for welding repairs to railings for an external platform at the Horns Rev 3 wind farm project. It identifies the customer and author, and includes sections for the manufacturer, customer, and certifier to release the document. The procedure aims to ensure quality and safety standards are met for welding repairs on the railings.

Uploaded by

Mark Innes
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Customer Number

Geosea proc & Shipping 5343-BVA-FA-PRO-51304


Kunde Nummer

Code word Date / Revision


05.03.2018 // 00
Kennwort Datum / Revision

Object Author
Horns Rev 3 Railings Mark Innes
Objekt Autor

Work Procedure

Work Procedure (PRO)


for

BVA_AA_048_01 - Weld Repair


for

Railings for HR 3 External platform

Document release
Dokumentenfreigabe
Manufacturer Customer Certification
Hersteller Kunde Zertifizierer

Datum
Date

Name
Name
Mark Innes

Department
Abteilung
Quality Assurance

Signature
Unterschrift

Page 1 of 1

You might also like