Create Material BOM Using CS01

The document provides instructions for creating a material bill of materials (BOM) in SAP. It outlines the menu path and transaction code to use, as well as required, optional, and conditional fields to complete when creating a new material BOM. Key steps include entering information about the material, plant, BOM usage, components and quantities, and setting the BOM status to active.

Uploaded by

shuva007
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
369 views15 pages

Create Material BOM Using CS01

The document provides instructions for creating a material bill of materials (BOM) in SAP. It outlines the menu path and transaction code to use, as well as required, optional, and conditional fields to complete when creating a new material BOM. Key steps include entering information about the material, plant, BOM usage, components and quantities, and setting the BOM status to active.

Uploaded by

shuva007
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

DIC Global SAP Program

Title: Create material BOM (CS01)


Process: Plan to fulfill
Sub-Process: plan to fulfill Process

Work Instruction

Standard Sales Order from Stock (VA01) CS01

Purpose
Use this procedure to create a Material BOM

Trigger
None

Prerequisites
Bill of material structure is required for a material.
Material number should exist for the BOM to be created.

Menu Path
Use the following menu path(s) to begin this transaction:
 SAP Menu à Logistics à Production à Master Data à Bills of MaterialàBill of
MaterialàMaterial BOM àCS01 - Create
 Type in CS01 in the command line.

Transaction Code
CS01

Helpful Hints
Note:
R/O/C in the field tables represents Required, Optional, or Conditional field entries.
• Optional field: you may enter information in an optional field, but an entry is not required for the
completion of the transaction.
• Conditional field: an entry that becomes required as a result of entering something previous to it,
which then deems it required.

Version: Preliminary Last Modified: 12/8/2011 11:32:00 AM Page 1 / 125


DIC Global SAP Program
Title: Create material BOM (CS01)
Process: Plan to fulfill
Sub-Process: plan to fulfill Process

Procedure

1. Start the transaction using the menu path or transaction code.

2. As required, complete/review the following fields:

Field Name R/O/C Description

Transaction Code R Description of the Transaction Code.


Example: CS01

Version: Preliminary Last Modified: 12/8/2011 11:32:00 AM Page 2 / 125


DIC Global SAP Program
Title: Create material BOM (CS01)
Process: Plan to fulfill
Sub-Process: plan to fulfill Process

Create material BOM: Initial Screen

3. As required, complete/review the following fields:

Field Name R/O/C Description

Material R SAP Code. In the Material field, enter the material for which
you want to create the BOM.
Example: 100000000010

Plant R Plant in which this BOM is valid


 Enter plant identifier
Example: EE11
Note: If left blank, this becomes a group BOM. Make sure to
enter a plant.

BOM Usage R The manner in which this BOM is to be used


Use 1 for Production, 9 For Rework and R for Reactive
(Pigments Division)

Version: Preliminary Last Modified: 12/8/2011 11:32:00 AM Page 3 / 125


DIC Global SAP Program
Title: Create material BOM (CS01)
Process: Plan to fulfill
Sub-Process: plan to fulfill Process

Field Name R/O/C Description

Alternative BOM O Identifies which BOM for this material is to be


created/selected
Enter alternative if desired
Note: The system will check to see if it exists. Otherwise, the
system will automatically allocate the number.
Valid From R Date from which change is effective
 Enter effective date
Note: Defaults to current date.

Version: Preliminary Last Modified: 12/8/2011 11:32:00 AM Page 4 / 125


DIC Global SAP Program
Title: Create material BOM (CS01)
Process: Plan to fulfill
Sub-Process: plan to fulfill Process

Create material BOM: General Item Overview

4. Update the following Required, Optional, and Conditional fields, as needed:

Field R/O/C Description/Action


Component R Material number
 Enter material number.
Example: E.g. 320000000051 and
320000000052
Quantity R Quantity of the component required to make the
base quantity of the material
Enter the required quantity.
Example:
Un O Unit of measure. Defaults from material master.
 Enter if different from base UOM.
Example: KG, EA
Ict R Item category
 L for Stock Items
 N for non-stock items

Version: Preliminary Last Modified: 12/8/2011 11:32:00 AM Page 5 / 125


DIC Global SAP Program
Title: Create material BOM (CS01)
Process: Plan to fulfill
Sub-Process: plan to fulfill Process

Press enter for each of the different warning messages.

Highlight each line as follows:

Click on Item for the component details.

Use Next Item to move through the components.

Version: Preliminary Last Modified: 12/8/2011 11:32:00 AM Page 6 / 125


DIC Global SAP Program
Title: Create material BOM (CS01)
Process: Plan to fulfill
Sub-Process: plan to fulfill Process

Create material BOM: Item: All data

Field R/O/C Description/Action


Recursion allowed O Flag allowing the material to consume itself during
the production process. It controls whether the
system checks the BOM for recursiveness.
 Set if needed

Version: Preliminary Last Modified: 12/8/2011 11:32:00 AM Page 7 / 125


DIC Global SAP Program
Title: Create material BOM (CS01)
Process: Plan to fulfill
Sub-Process: plan to fulfill Process

Click on the tab.

Note the costing relevancy field. X means it is 100% relevant to costing – this must be used for all
components, except for ZPIP materials (e.g. water).

Use Next Item and Previous Item to move forward and backwards through the components.

Version: Preliminary Last Modified: 12/8/2011 11:32:00 AM Page 8 / 125


DIC Global SAP Program
Title: Create material BOM (CS01)
Process: Plan to fulfill
Sub-Process: plan to fulfill Process

5. Select Go to Header F6.

6. As required, complete/review the following fields:

Field R/O/C Description/Action

Version: Preliminary Last Modified: 12/8/2011 11:32:00 AM Page 9 / 125


DIC Global SAP Program
Title: Create material BOM (CS01)
Process: Plan to fulfill
Sub-Process: plan to fulfill Process

BOM & Alternate text O Enter if there are alternates for ease of selecting the correct
BOM later
Enter descriptive text

Base Quantity R Quantity to which all component quantities in a BOM relate.


System defaults to one unless otherwise configured
Enter base quantity if different from default

BOM Status R 1: Active


2: Inactive
Select active if the BOM can be used, inactive if not

7. Click on the BOM status drop down:

Double-click

Version: Preliminary Last Modified: 12/8/2011 11:32:00 AM Page 10 / 125


DIC Global SAP Program
Title: Create material BOM (CS01)
Process: Plan to fulfill
Sub-Process: plan to fulfill Process

Create material BOM: Header Overview

7. Click

Version: Preliminary Last Modified: 12/8/2011 11:32:00 AM Page 11 / 125


DIC Global SAP Program
Title: Create material BOM (CS01)
Process: Plan to fulfill
Sub-Process: plan to fulfill Process

Create material BOM: Initial Screen

Version: Preliminary Last Modified: 12/8/2011 11:32:00 AM Page 12 / 125


DIC Global SAP Program
Title: Create material BOM (CS01)
Process: Plan to fulfill
Sub-Process: plan to fulfill Process

Version: Preliminary Last Modified: 12/8/2011 11:32:00 AM Page 13 / 125


DIC Global SAP Program
Title: Create material BOM (CS01)
Process: Plan to fulfill
Sub-Process: plan to fulfill Process

The system displays the message, “ ."

8. You have completed this transaction.

Result
You have created a material BOM.