Min Beton K250
PONDASI TAPAK 60/60
KOLOM 20/20
SLOOF/ BALOK 15/20
SLOOF/ BALOK 15/25
600
600
DETAIL SLOOF/ BALOK
SCALE : NTS
1700
250
400
1000
200
KOLOM 20/20
100 50
500
600
1700
DETAIL KOLOM DETAIL PONDASI TAPAK
SCALE : NTS SCALE : NTS
DENAH PONDASI
SCALE : NTS
PROJECT NAME PAGE NO. DRWG REV SCALE
IPC DRAWN BY BM APPROVED BY DATE
CHECKED BY 04 APRIL 2019
DRAWING TITLE.
Jl. Boulevard Artha Gading, Sentra Bisnis Artha Gading Blok A-6A No. 2, Jl. Boulevard Artha Gading,
Sentra Bisnis Artha Gading Blok A-6A No. 2,